MAGNUM STAR CRUISE MALL

UPRERARegistered

MAGNUM STAR CRUISE MALL is a RERA-registered commercial project by PKG ESTATES PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ7387). Registered with a completion deadline of 30 Nov 2018. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7387
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start14 Dec 2012
Original start15 Dec 2010
Project duration72 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address12A & 14,SECTOR-C-4,TRONICA CITY,GHAZIABAD (U.P)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    04/SIDC/POTC/12A &14/C4

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion30 Nov 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹52,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors98 · 1 · 5 (units from plan)
Homes · commercial units43 · 55 (shops and offices filed in the same plan)
  • SHOP55 56%
  • OTHER43 44%
ConfigurationUnitsCarpet area
SHOP556-57
OTHER436-72
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · SHOP, OTHER5986-72
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 366.13 m² for a OTHER, 366.13 m² for a OTHER, 366.13 m² for a OTHER and 1 other unit like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SACHIN SRIVASTAVA
License CA/2007/40117
129,GANGA NAGAR SOCIETY,NABAB GANJ,KANPUR (U.p0
Sr.Development work declared to RERA
1Demarcation of Plots
NORTH WEST FACING ROAD,NORTH EAST FACING SERVICE ROAD,SOUTH EAST OTHER PROPERTY,SOUTH WEST ROAD
2Boundary Wall
ALL 4 SIDE COMPLETED
3Road Work
IN PROGRESS
4Footpaths
IN PROGRESS
5Water Supply Including Drinking Water Facilities
IN PROGRESS
6Sewer System
IN PROGRESS
7Drain
IN PROGRESS
8Parks
N.A
9Tree Planting
N.A
10Design For Electric Supply Including Street Lighting
IN PROGRESS
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
IN PROGRESS
13Solid Waste Management And Disposal System
IN PROGRESS
14Water Conservation System
IN PROGRESS
15Energy Management System Including Use of Renewable Energy
IN PROGRESS
16Fire Protection And Fire Safety System
IN PROGRESS
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
IN PROGRESS
19Other Miscellaneous Work
FINISHING STAGE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 Dec 2014.

Sanctioned by Any Other Competent Authority · 4,200 sqm of land · an approved plan of 1 block and 98 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
04/SIDC/POTC/12A &14/C42 Dec 20091 Dec 20141 Dec 201830 Nov 2018
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
12A&14,SECTOR-C-44200Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 14 Mar 2007.

Registry no.DateTypeArea
807414 Mar 2007self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 5793
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 5793
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Oct 2017 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePKG ESTATES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM14561
PANAADCP3308E
CIN / TANU45201DL2004PTC124441
Name of chairmanPREM KUMAR GOEL
Registered address12A & 14,SECTOR-C-4,TRONICA CITY,GHAZIABAD (U.P)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PKG ESTATES PRIVATE LIMITEDBankHDFC BANK LIMITEDBranchD-BLOCK,JANAK PURI,NEW DELHIA/C no.IFSCHDFC0001375
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about MAGNUM STAR CRUISE MALL

Is MAGNUM STAR CRUISE MALL RERA registered?

Yes. MAGNUM STAR CRUISE MALL is registered with UPRERA under registration number UPRERAPRJ7387, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MAGNUM STAR CRUISE MALL?

The completion date filed with UPRERA is 30 Nov 2018. No completion certificate is on record yet.

Who is the builder of MAGNUM STAR CRUISE MALL?

PKG ESTATES PRIVATE LIMITED is the promoter entity that filed MAGNUM STAR CRUISE MALL with UPRERA (promoter RERA ID UPRERAPRM14561). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does MAGNUM STAR CRUISE MALL show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does MAGNUM STAR CRUISE MALL have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MAGNUM STAR CRUISE MALL located?

MAGNUM STAR CRUISE MALL is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in MAGNUM STAR CRUISE MALL?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MAGNUM STAR CRUISE MALL?

The approved unit plan filed with UPRERA runs from 6 to 72 m² of carpet area (about 59 to 776 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MAGNUM STAR CRUISE MALL?

The approved unit plan describes 1 block and 98 units of which 43 are homes and 55 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MAGNUM STAR CRUISE MALL?

About 94 units per acre: 98 planned units across 1.04 acres (4,200 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗