Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad

UPRERARegistered

Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Ghaziabad (RERA ID UPRERAPRJ623188). Registered with a completion deadline of 29 Jan 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
38.83%Q3'25
38.83%Q4'25
29.3%Q1'26
33.92%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ623188
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jan 2022
Project duration61 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    750/A.P-5/sec-6/MV/7

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Oct 2021
Original completion31 Dec 2023
Revised completion29 Jan 2027
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,41,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Deo Arya
License CA/97/22345
AP Unit-5 UP Awas evam Vikas Parishad, Neelgiri complex, Lucknow
Engineer
Aman Tyagi
CD Baghpat-03 UP Awas Evam Vikas Parishad, Sector-7 Mandola Vihar Yojna Ghaziabad
Contractor
Aman Tyagi
CD Baghpat-03 UP Awas Vikas evam Parishad, Sector-7 Mandola vihar yojna Ghaziabad
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved Lay out Plan
2Boundary Wall
No Provision of Boundary wall
3Road Work
Trunk Roads of Mandola Vihar yojna are already constructed. Internal Roads of 9.0 m and 12.0 m are proposed, which will be constructed by UPAVP as per Parishad Specification
4Footpaths
As per specification of UPAVP
5Water Supply Including Drinking Water Facilities
Internal Water supply Line of PVC pipe of 110 mm dia will be laid as per design approved by the competent authority of UPAVP. Water supply will be given by Over head tank which will be constructed by parishad
6Sewer System
Internal Sewer line of 250mm dia RCC NP2 and NP3 pipe will be laid as per design approved by the competant authority of UPAVP
7Drain
Internal Storm water drain of CK and C type will be provided as per design approved by the competant authority of UPAVP
8Parks
Open / Green will be provided as per approved layout.
9Tree Planting
Tree Planting will be done by UPAVP as per norms approved by horticulture section of Parishad
10Design For Electric Supply Including Street Lighting
Electrification work and street light work will be done by UPAVP as per design and drawing approved by the competant authority of UPAVP. Electricity supply line will be handed over to UP Power corporation after completing and testing of line.
11Community Buildings
No Provision of Community Building
12Treatment and Disposal System of Sewage and Sullage water
Will be done by UPAVP as per Specification
13Solid Waste Management And Disposal System
To be Provided as per UPAVP norms / specification
14Water Conservation System
Presently not planned
15Energy Management System Including Use of Renewable Energy
Presently not planned
16Fire Protection And Fire Safety System
as per norms/ specification
17Social Infrastructure And Other Public Amenities Including Public Health Services
Planned as per provision in the vicinity of the project
18Emergency Evacuation Services
as per layout
19Other Miscellaneous Work
No
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Mar 2026.

Sanctioned by U.P. Awas Evam Vikas Parishad · 47,243 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
750/A.P-5/sec-6/MV/717 Mar 202116 Mar 202616 Mar 202931 Dec 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jan 2027.

#Granted fromExtended uptoNote
131 Dec 202329 Jan 2027—
230 Sept 202629 Jan 2027Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1359, 1360, 1361, 1362 , 1363, 1366, 1367, 1369, 1370 (Part)18890Khasra
2, 3, 4, 5, 15, 5628414Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 2012
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2011
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Aug 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Aug 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Aug 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Aug 2021 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New26 Aug 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Aug 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Aug 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New25 Aug 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Aug 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Aug 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New3 Sept 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Aug 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Aug 2021 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2026-Q1.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q238.83%CA ↗ · Arch ↗ · Eng ↗
2025-Q338.83%CA ↗ · Arch ↗ · Eng ↗
2025-Q429.3%CA ↗ · Arch ↗ · Eng ↗
2026-Q133.92%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP Mandola Vihar Yojna Gzb Collection A/CBankHDFC BankBranchGhaziabad VasundharaBranch address4/5, Om PLaza, Sector-15C, Vasundhara GhaziabadBranch districtGhaziabadA/C no.IFSCHDFC000563
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP Mandola Vihar Yojna Gzb Seperate A/CBankHDFC BankBranchGhaziabad VasundharaBranch address4/5, Om Plaza, Sector-15C, Vasundhara GhaziabadBranch districtGhaziabadA/C no.IFSCHDFC000563
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP Mandola Vihar Yojna Gzb Transaction A/CBankHDFC BankBranchGhaziabad VasundhraBranch address4/5, Om Plaza, Sector-15C, Vasundhara GhaziabadBranch districtGhaziabadA/C no.IFSCHDFC000563
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

19 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Revised completion date on file2027-01-30 → 2027-01-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2027-01-30 → 2027-01-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-09-30 → 2027-01-29
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-09-30 → 2027-01-30
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 2
extension 2 to 2027-01-30
newly filed with RERA
5 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad

Is Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad RERA registered?

Yes. Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad is registered with UPRERA under registration number UPRERAPRJ623188, registered on 8 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad?

The completion date filed with UPRERA is 29 Jan 2027. No completion certificate is on record yet.

Who is the builder of Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad more time to complete?

UPRERA's record carries 2 completion extensions for Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad, the latest running to 29 Jan 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad located?

Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad is registered in Ghaziabad, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗