Manzil Ashiyana Ph 3

UPRERARegistered

Manzil Ashiyana Ph 3 is a RERA-registered residential project by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) in Baghamau, Lucknow (RERA ID UPRERAPRJ103523). Registered with a completion deadline of 30 May 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ103523
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Jun 2026
Project duration36 months
AddressPart of Khasra No.s 231, 232, 233, 234, 761, 762, 763, 764, 766, 767, 768, 769, 773 in Integrated Township of Shalimar One World at Village- Baghamau, Tehsil- Lucknow, District- Lucknow, U.P., 226010, Baghamau, Lucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    EWS Housing/18755/LDA/BP/25-26/6441/10042026

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Sept 2026
Original completion30 May 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹58,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors609 · 6 · 7 (units from plan)
ConfigurationUnitsCarpet area
1 BHK60930-36
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower E(EWS) · 1 BHK712630
Tower G(LIG) · 1 BHK710436
Tower H(LIG) · 1 BHK710436
Tower J(LIG) · 1 BHK710436
Tower K(EWS) · 1 BHK78730
Tower L(EWS) · 1 BHK78430
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Shivam Srivastava
License CA/2010/50742
Vibhuti Khand Gomti Nagar, Lucknow, 226010
Engineer
Mr. Maqsud E Nazar (NNC Design International)
G-70, 2nd Floor, Jaswant Plaza Near Kalindi Kunj,Main Sarita Vihar Road,New Delhi- 110025
Contractor
Mr. Nasir Javed
Vill.-Tashka, Near Aligarh Hospital, Rampur-244901
Sr.Development work declared to RERA
1Demarcation of Plots
This is single plot irregular shape with total project land admeasuring 10621.38 Sqmt has been systematically demarcated into 6 residential blocks in accordance with the sanctioned layout plan approved by the competent authority. The towers are laid out with proper survey reference points, internal road network, and service corridors. Each block is clearly identified with a unique number and defined boundaries. The demarcation has been carried out as per the approved drawings to ensure clarity of ownership, access, and uniform development of the township. The township has 1 entrance and exite from 24 mtr proposed master plan road from East side and having internal road of 6 mtrs.
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.
3Road Work
Trimix road will be used as per deisgn suggested by the Architect for internal road.Internal road shall be mechanically compacted with 200mm of WMM layer, 100mm thick PCC and 125mm finished trimix.
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
The potable water supply of desired quality & purity shall be ensured through pressurized distribution network connceted with undergound/overhead tanks of capacity of 25000 Ltr connected with WTP of 152 KLD. Drinking water shall be sourced from an approved municipal connection through supply uPVC shcedule-40 pipeline approx lenght 2050 mtr..
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall go to 690 KLD MBBR technology central STP for treatment. After treatment ,water shall be recycled and it will be used in gardening, flush tanks.Oveflow from the central STP shall be connected with the Municipal sewerage system. Sewer line of length apprx 800 mtr with dia of 200-250 mm with 30 nos. of manhole is proposed.
7Drain
Storm water system shall be Provided. Storm water of 400 mm dia with 30 nos. of manholes from Roads and other landscape area shall be connected to the Storm water drain channel and go to the 3 nos. of Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municipal drain line.
8Parks
NA
9Tree Planting
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.
10Design For Electric Supply Including Street Lighting
All the workings shall confer to Bureau Of Indian Standards , Indian Electricity Rules & Indian Electricity Acts.Total Load of 2000 KVA shall be supplied from neares sub station of comptetent auhtority. nos. of 750KVA & 1 no. of 500KVA power back up DGs shall also be provided. 2 nos. of 800KVA and 1 no. of 1000KVA trasnformer load.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system fo all plots shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system. 690 KLD STP of MMBR techonolgy is proposed.
13Solid Waste Management And Disposal System
Project shall have  waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal. 960 Kg solid waste managment plant is proposed for township.
14Water Conservation System
A well designed rain water harvesting system/ water storage tank shall be provided for the whole complex to conserve water. 2 nos. of rain water storage ponds are proposed.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
16Fire Protection And Fire Safety System
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Staircase is provided in the each building,Dedicated assembly areas defined in the campus. Adequate signage is also provided.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Apr 2031.

Sanctioned by Lucknow Development Authority · 10,621 sqm of land · an approved plan of 6 blocks and 609 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
EWS Housing/18755/LDA/BP/25-26/6441/1004202610 Apr 20269 Apr 20319 Apr 203430 May 2029
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

28 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
231238.32Khasra
232578.32Khasra
233360.41Khasra
234181.9Khasra
761433.17Khasra
7622274.3Khasra
763238.94Khasra
7641115.05Khasra
766380Khasra
7671435.18Khasra
768510Khasra
769390.94Khasra
7732484.85Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4798
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · 9652
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 4251
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 9207
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9209
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6473
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Khasra 768
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Land Area Chart
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Latest Certified Khatoni - 234, 763
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Letter to LDA for mutation of GS Land
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Point wise reply to Query letter for Manzil Ashiyana Phase 3
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Khatoni with LDA name 234, 763
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Certified Khatoni with LDA name 234, 763
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New4 May 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 May 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 May 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 May 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 May 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 May 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 May 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 May 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 May 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New4 May 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 May 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New4 May 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New2 May 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Jun 2026 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SLPL COLL A/C MANZIL ASHIYANA PH 3BankState Bank of IndiaBranchCommercial Branch, LucknowBranch address6A, Way Road, Gokhle Marg, Lucknow, Uttar Pradesh, 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166Branch emailsbi.04166@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SLPL SEP A/C MANZIL ASHIYANA PH 3BankState Bank of IndiaBranchCommercial Branch, LucknowBranch address6A, Way Road, Gokhle Marg, Lucknow, Uttar Pradesh, 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SLPL TRANS A/C MANZIL ASHIYANA PH 3BankState Bank of IndiaBranchCommercial Branch, LucknowBranch address6A, Way Road, Gokhle Marg, Lucknow, Uttar Pradesh, 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Manzil Ashiyana Ph 3

Is Manzil Ashiyana Ph 3 RERA registered?

Yes. Manzil Ashiyana Ph 3 is registered with UPRERA under registration number UPRERAPRJ103523, registered on 3 Sept 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Manzil Ashiyana Ph 3?

The completion date filed with UPRERA is 30 May 2029. No completion certificate is on record yet.

Who is the builder of Manzil Ashiyana Ph 3?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Manzil Ashiyana Ph 3 with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Manzil Ashiyana Ph 3 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Manzil Ashiyana Ph 3 located?

Manzil Ashiyana Ph 3 is registered in Baghamau, Lucknow, as filed with UPRERA.

What configurations are available in Manzil Ashiyana Ph 3?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Manzil Ashiyana Ph 3?

The approved unit plan filed with UPRERA runs from 30 to 36 m² of carpet area (about 327 to 384 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Manzil Ashiyana Ph 3?

The approved unit plan describes 6 blocks and 609 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Manzil Ashiyana Ph 3?

About 232 units per acre: 609 planned units across 2.62 acres (10,621 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗