Manzil Ashiyana Phase-2

UPRERARegistered

Manzil Ashiyana Phase-2 is a RERA-registered residential project by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) in Lucknow (RERA ID UPRERAPRJ645360). Registered with a completion deadline of 30 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
50.53%Q3'25
57%Q4'25
66.75%Q1'26
77.92%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ645360
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Jul 2023
Project duration40 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/06984/LDA/BP/22-23/2883/09012023

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Jun 2023
Original completion30 Jun 2026
Revised completion30 Oct 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹52,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors469 · 4 · 7 (units from plan)
ConfigurationUnitsCarpet area
1 BHK46929-36
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower A1(LIG-H) · 1 BHK711236
Tower B1(LIG-G) · 1 BHK710536
Tower C1(EWS-B) · 1 BHK712629
Tower D1(EWS-C) · 1 BHK712629
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Shivam Srivastava
License CA/2010/50742
Vibhuti Khand Gomti Nagar, Lucknow
Engineer
Mr. Maqsud E Nazar
G-70, 2nd Floor, Jaswant Plaza Near Kalindi Kunj,Main Sarita Vihar Road,New Delhi- 110025
Contractor
Mr. Nasir Javed
Vill.-Tashka, Near Aligarh Hospital, Rampur-244901
Sr.Development work declared to RERA
1Demarcation of Plots
This is one plot polygon shaped abutting 24mtr internal road from East side. Site has one entrance and one exit. Site is surrounded by other plots from North, Village from West and green area from South
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.
3Road Work
Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
All apartments shall be provided with domestic water for household activities. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created on terrace. Separate tanks are provided for fire water.
6Sewer System
Centralized Sewerage system already provided at township and shall be connected through projects. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
8Parks
There are significant green area including green parks,Tree Boulevard, Green Mounds, play areas for childrens and different recreational activities at masterplan level.
9Tree Planting
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting etc.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system already provided at township and shall be connected through projects. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
13Solid Waste Management And Disposal System
Project shall have  waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
16Fire Protection And Fire Safety System
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Staircase is provided in the each building,Dedicated assembly areas defined in the campus. Adequate signage is also provided.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 May 2028.

Sanctioned by Lucknow Development Authority · 9,412 sqm of land · an approved plan of 4 blocks and 469 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/06984/LDA/BP/22-23/2883/090120238 May 20237 May 20287 May 203130 Jun 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Oct 2026.

#Granted fromExtended uptoNote
130 Jun 202630 Oct 2026—

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
230, 231, 232, 233, 257, 258, 236, 238, 237Ka, 237Kha, 256Ka24430Khasra
239890Khasra
234, 235, 760 P, 256Kha2930Khasra
7611810Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 5396
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13433
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 9652
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Sale deed · 4251
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4798
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · Land Area Chart
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 May 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 May 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 May 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 May 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New16 May 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New16 May 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New16 May 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 May 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New27 May 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New17 May 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 May 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 May 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New15 Jun 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q1.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q250.53%CA ↗ · Arch ↗ · Eng ↗
2025-Q357%CA ↗ · Arch ↗ · Eng ↗
2025-Q466.75%CA ↗ · Arch ↗ · Eng ↗
2026-Q177.92%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. ANS DPL COL AC MANZIL ASHIYANA PHASE-2BankHDFC BankBranchLUCKNOW - PRANAY TOWERSBranch addressPRANAY TOWERS, 38, DARBARI LAL SHARMA MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. ANS DPL SEP AC MANZIL ASHIYANA PHASE-2BankHDFC BankBranchLUCKNOW - PRANAY TOWERSBranch addressPRANAY TOWERS, 38, DARBARI LAL SHARMA MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. ANS DPL TRANS AC MANZIL ASHIYANA PHASE-2BankHDFC BankBranchLUCKNOW - PRANAY TOWERSBranch addressPRANAY TOWERS, 38, DARBARI LAL SHARMA MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Revised completion date on file2026-06-30 → 2026-10-30
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Oct 2026
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Manzil Ashiyana Phase-2

Is Manzil Ashiyana Phase-2 RERA registered?

Yes. Manzil Ashiyana Phase-2 is registered with UPRERA under registration number UPRERAPRJ645360, registered on 30 Jun 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Manzil Ashiyana Phase-2?

The completion date filed with UPRERA is 30 Oct 2026. No completion certificate is on record yet.

Who is the builder of Manzil Ashiyana Phase-2?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Manzil Ashiyana Phase-2 with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Manzil Ashiyana Phase-2 more time to complete?

UPRERA's record carries 1 completion extension for Manzil Ashiyana Phase-2, the latest running to 30 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Manzil Ashiyana Phase-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Manzil Ashiyana Phase-2 located?

Manzil Ashiyana Phase-2 is registered in Lucknow, as filed with UPRERA.

What configurations are available in Manzil Ashiyana Phase-2?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Manzil Ashiyana Phase-2?

The approved unit plan filed with UPRERA runs from 29 to 36 m² of carpet area (about 311 to 384 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Manzil Ashiyana Phase-2?

The approved unit plan describes 4 blocks and 469 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Manzil Ashiyana Phase-2?

About 202 units per acre: 469 planned units across 2.33 acres (9,412 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗