Moti Residency- Phase II (Tower H)

UPRERARegistered

Moti Residency- Phase II (Tower H) is a RERA-registered residential project by Techman Buildwell Pvt. Ltd in Ghaziabad (RERA ID UPRERAPRJ3010). Registered with a completion deadline of 3 Sept 2030. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3010
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Sept 2016
Original start1 Sept 2016
Project duration169 months
AddressKhasra No 237 M and 237 . Village Morta, Ghaziabad,GHAZIABAD,Uttar Pradesh,201003, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressTechman Buildwell Pvt. Ltd. Address G-1354, Chittranjan Park, New Delhi. 110019
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    GROUPHOUSING/09392/GDA/BP/25-26/0552/01092025

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion31 Jul 2021
Revised completion3 Sept 2030
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹12,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors56 · 1 · 14 (units from plan)
ConfigurationUnitsCarpet area
3 BHK5686-86
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
H · 3 BHK145686-86
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sh. Anuj Agrawal
License CA/96/19503
A- 244, Behind Angel Mega Mall Kaushambi, Ghaziabad (U.P)
Engineer
Sh. Vikas Garg
52, Sector-5,Vaishali, Ghaziabad, (U.P.).
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
The boundary wall will be constructed during course of construction before due date of possession.
3Road Work
NA
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
The water supply including water drinking water facilities will be provided as per requirements.
6Sewer System
The company will do needful as per norms.
7Drain
NA
8Parks
NA
9Tree Planting
The trees will be planted within the complex as per norms/requirements.
10Design For Electric Supply Including Street Lighting
The Company has appointed consultant and will do as per norms/requirements.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
The company will do needful as per norms.
13Solid Waste Management And Disposal System
The company will do needful as per norms.
14Water Conservation System
The company will construct rain harvesting pit within the complex as per requirements/norms.
15Energy Management System Including Use of Renewable Energy
The company will do needful as per norms.
16Fire Protection And Fire Safety System
The Fire safety system will be install as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
The company will do needful as per norms.
19Other Miscellaneous Work
The Company will do whatever work is necessary to complete the work.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 30 Jan 2022. 1 of them carries a revalidation, valid to 31 Mar 2022.

Sanctioned by Ghaziabad Development Authority · 1,488 sqm of land · an approved plan of 1 block and 56 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
195/Zone-1/12-1312 May 201611 May 202110 May 202431 Jul 2021—
GROUPHOUSING/09392/GDA/BP/25-26/0552/0109202512 May 201630 Jan 202220 Jun 202430 Jan 202212 May 2016
valid to 31 Mar 2022
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 3 Sept 2030.

#Granted fromExtended uptoNote
131 Jul 202130 Jan 2022Six months extension in view of force majeure caused by covid-19 pandemic
230 Jan 20223 Sept 2030—

Land & documents

12 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2383200.00sq.mt—
2383200Khasra
2381470Khasra
2371650Khasra
2371050Khasra
2371060.67Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Jan 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old13 Oct 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old13 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2021-Q4.

QuarterConstructionCertificates
2021-Q435.74%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2021-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTechman Buildwell Pvt. Ltd
RolePromoter · current
RERA IDUPRERAPRM2165
PANAAACT8382M
CIN / TANU70101DL1997PTC085439
Name of chairman1 Sh. Vishwanath Agrawal Chairman Cum M.director
Registered addressTechman Buildwell Pvt. Ltd. Address G-1354, Chittranjan Park, New Delhi. 110019
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
TBPL COLL A/C FOR MOTI RESI PH-II TOW -HBankHDFC BANKBranchMORTA RAJNAGAR EXTENSION IIBranch addressGROUND FLOOR SHOP NO 1,2,3 NILAYA GREENS, MORTA, RAJNAGAR EXTENSION II, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0008465Branch emailsupportatheratehdfcbankdotcom
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
TBPL SEP BANK AC FOR MOTI RES PH-II T-HBankHDFC BANK LTDBranchMORTA RAJNAGAR EXTENSION IIBranch addressGROUND FLOOR, SHOP NO 1,2,3 NILAYA GREENS, MORTA, RAJNAGAR EXTENSION II, GHAZIABAD 201003Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0008465Branch emailsupportattheratehdfcbankdotcom
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
TBPL RERA TRAN AC FOR MOTI RES PH-II T HBankHDFC BANKBranchMORTA RAJNAGAR EXTENSION IIBranch addressGROUND FLOOR SHOP NO 1,2,3 NILAYA GREENS, MORTA RAJNAGAR EXTENSION II, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0008465Branch emailsupportatthereatehdfcbank.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Moti Residency- Phase II (Tower H)

Is Moti Residency- Phase II (Tower H) RERA registered?

Yes. Moti Residency- Phase II (Tower H) is registered with UPRERA under registration number UPRERAPRJ3010, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Moti Residency- Phase II (Tower H)?

The completion date filed with UPRERA is 3 Sept 2030. No completion certificate is on record yet.

Who is the builder of Moti Residency- Phase II (Tower H)?

Techman Buildwell Pvt. Ltd is the promoter entity that filed Moti Residency- Phase II (Tower H) with UPRERA (promoter RERA ID UPRERAPRM2165). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Moti Residency- Phase II (Tower H) show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Moti Residency- Phase II (Tower H) more time to complete?

UPRERA's record carries 2 completion extensions for Moti Residency- Phase II (Tower H), the latest running to 3 Sept 2030. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Moti Residency- Phase II (Tower H) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Moti Residency- Phase II (Tower H) located?

Moti Residency- Phase II (Tower H) is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Moti Residency- Phase II (Tower H)?

The unit plan filed with UPRERA lists 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Moti Residency- Phase II (Tower H)?

The approved unit plan filed with UPRERA runs from 86 to 86 m² of carpet area (about 930 to 931 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Moti Residency- Phase II (Tower H)?

The approved unit plan describes 1 block and 56 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Moti Residency- Phase II (Tower H)?

About 152 units per acre: 56 planned units across 0.37 acres (1,488 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗