Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7496
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start31 May 2017
Project duration87 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address121, DUPLEX, SWARNIM VIHAR, SECTOR-82, NOIDA-201304
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    118/MP/ZONE-1/17

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion certificate filed

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

  9. to

    Extension granted

  10. to

    Extension granted

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Aug 2017
Original completion30 May 2022
Revised completion28 Aug 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary19 Oct 2021
Registration fee₹1,96,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,753 · 12 · 17 (units from plan)
Homes · commercial units1,669 · 84 (shops and offices filed in the same plan)
  • 1 BHK890 51%
  • 2 BHK736 42%
  • SHOP84 5%
  • 3 BHK28 2%
  • OTHER15 1%
ConfigurationUnitsCarpet area
1 BHK89033-53
2 BHK73640-59
3 BHK2860
OTHER1554-250
SHOP846-42
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 1 BHK, 2 BHK, OTHER1715433-59
B · 1 BHK, 2 BHK, OTHER1715433-59
BLOCK 4 · OTHER, SHOP7966-132
BLOCK 5 · OTHER312,220
C · 1 BHK, 2 BHK, 3 BHK, OTHER1718233-60
D · 1 BHK, 2 BHK, OTHER1716833-59
E · 1 BHK, 2 BHK, OTHER1516833-54
F · 1 BHK, 2 BHK, OTHER1516833-54
G · 1 BHK, 2 BHK, OTHER1516833-53
H · 1 BHK, 2 BHK, OTHER1516833-53
J · 1 BHK, 2 BHK, OTHER1516933-59
K · 1 BHK, 2 BHK, OTHER1415733-59
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 2,220 m² for a OTHER, 800 m² for a OTHER, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Sr.Development work declared to RERA
1Demarcation of Plots
Total plot area 38,300 Sq. m. located in Khasras 1015, 1023/1, 1023/2, 1023 situated in Village Morta, Pargana Jalalabad, Tehsil & District Ghaziabad, U.P.
2Boundary Wall
2100 mm high, along entire periphery.
3Road Work
Interlocking Pavers
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
Two Under Ground Tanks of 300 KL capacity each
6Sewer System
Underground system using uPVC (SN-4) pipes.
7Drain
Underground system using uPVC (SN-4) sewer pipes.
8Parks
Parks having total area of 3832.29 sq. m. shall be provided
9Tree Planting
194 Nos. trees are to be planted out of that 50% will be evergreen tree.
10Design For Electric Supply Including Street Lighting
Four Electricity Transformers of 1250 KVA capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage
11Community Buildings
Built up area of community buildings shall be 760 sq. m.
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity 450 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
13Solid Waste Management And Disposal System
Manual collection and organic waste converter shall be provided in the project
14Water Conservation System
Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC &NOC from fire depp.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Facilities of Anganwadi, STP, organic waste converter shall be provided
18Emergency Evacuation Services
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per norms.
19Other Miscellaneous Work
Building spaces/ plots for school, retail shops, creche, office space shall be sold .
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

20 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
2ANGERONA CONSULTING PRIVATE LIMITEDUPRERAAGT17055
3Arpan TyagiUPRERAAGT23077
4BRIJESH SINGHUPRERAAGT24937
5CAPITALBOON CONSULTINGUPRERAAGT18663
6Gulshan Kumar SadanaUPRERAAGT17247
7Mukesh KumarUPRERAAGT17368
8NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
9Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
10Pooja PahujaUPRERAAGT20076
11PROPSHOPUPRERAAGT10129
12PROPZONE INFRATECHUPRERAAGT10285
13RAJBAL TYAGIUPRERAAGT20682
14rajnish kumarUPRERAAGT18862
15SAROJ TYAGIUPRERAAGT20683
16Sehlot realtors & developersUPRERAAGT11769
17SMC Real Estate Advisors Private LimitedUPRERAAGT10113
18SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
19SUMIT CHAUDHARYUPRERAAGT18651
20Vinod KumarUPRERAAGT15349
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 14 Apr 2022. 1 of them carries a revalidation, valid to 14 Apr 2025.

Sanctioned by Ghaziabad Development Authority · 38,300 sqm of land · an approved plan of 12 blocks and 1753 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
118/MP/ZONE-1/1715 Apr 201714 Apr 202214 Apr 202530 May 2022—
118/MP/ZONE-1/1715 Apr 201714 Apr 202214 Apr 202528 Nov 202315 Apr 2017
valid to 14 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Aug 2024.

#Granted fromExtended uptoNote
130 May 202229 Nov 2022Six months extension in view of force majeure caused by covid-19 pandemic
229 Nov 202228 Nov 2023—
328 Nov 202328 Aug 2024—

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1015, 1023/1, 1023/2, 1023 (mi)38300—
1015. 1023/1, 1023/2, 1023mi38300Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New1 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New1 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New1 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old2 Dec 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old16 Dec 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old16 Dec 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old16 Dec 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old16 Dec 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old16 Dec 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old16 Dec 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old16 Dec 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old16 Dec 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old22 Jan 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old22 Jan 2018 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameNILAYA INFRA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM10962
PANAAECN4382R
CIN / TANU70101DL2013PTC254538
Name of chairmanNITIN TYAGI
Registered address121, DUPLEX, SWARNIM VIHAR, SECTOR-82, NOIDA-201304
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
NIYALA INFRA PRIVATE LIMITEDBankHDFC BANK LTDBranchD-44 RDC RAJ NAGAR ,GHAZIABADA/C no.IFSCHDFC0000153
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
RERA statusregistered → completed
changed in Estanzo’s record
21 Sept 2026
When these facts last moved
RERA statuschanged in Estanzo’s record · 21 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
  • No architect, engineer or contractor is published for this project.Ask who the architect and engineer of record are - they are the professionals who certify each quarterly filing.

Common questions about NILAYA GREENS

Is NILAYA GREENS RERA registered?

Yes. NILAYA GREENS is registered with UPRERA under registration number UPRERAPRJ7496, registered on 5 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has NILAYA GREENS been completed?

UPRERA lists NILAYA GREENS as completed, with a completion certificate dated 19 Oct 2021, against a filed deadline of 28 Aug 2024.

Who is the builder of NILAYA GREENS?

NILAYA INFRA PRIVATE LIMITED is the promoter entity that filed NILAYA GREENS with UPRERA (promoter RERA ID UPRERAPRM10962). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted NILAYA GREENS more time to complete?

UPRERA's record carries 3 completion extensions for NILAYA GREENS, the latest running to 28 Aug 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does NILAYA GREENS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is NILAYA GREENS located?

NILAYA GREENS is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in NILAYA GREENS?

The unit plan filed with UPRERA lists 1 BHK, 2 BHK, 3 BHK, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in NILAYA GREENS?

The approved unit plan filed with UPRERA runs from 6 to 250 m² of carpet area (about 59 to 2,691 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in NILAYA GREENS?

The approved unit plan describes 12 blocks and 1,753 units of which 1,669 are homes and 84 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is NILAYA GREENS?

About 185 units per acre: 1,753 planned units across 9.46 acres (38,300 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗