Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ14329
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start20 Nov 2017
Project duration65 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressAAC-03, Shipra Krishna Azure, Behind Web Cinema kaushambi, Ghaziabad UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Nov 2017
Original completion15 Oct 2022
Revised completion14 Apr 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary16 Aug 2023
Registration fee₹58,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors425 · 3 · 14 (units from plan)
Homes · commercial units413 · 12 (shops and offices filed in the same plan)
  • 2 BHK196 46%
  • 1 BHK162 38%
  • 3 BHK54 13%
  • SHOP12 3%
  • OTHER1 <1%
ConfigurationUnitsCarpet area
1 BHK16239
OTHER1303
2 BHK19652
3 BHK5467
SHOP1212-19
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 1 BHK, OTHER1416339
B · 2 BHK1419652
C · 3 BHK, SHOP146612-67
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Pushp Kumar Sharma
License CA/2015/67013
plot no 22, Shaktikhand-2,Indrapuram, Ghaziabad
Engineer
Dr Padam Kumar
The-Ithum,701, Tower-A, A-40, Sector-62, Noida, UP
Contractor
Aasra Projects pvt. ltd.
15A,Pocket-C,Mayur Vihar,Phase-2,New Delhi-91
Sr.Development work declared to RERA
1Demarcation of Plots
Total plot area 10521 Sq. m. located in Khasras 1091 & 1092 situated in Village Morta, Pargana Jalalabad, Tehsil & District Ghaziabad, U.P.
2Boundary Wall
2100 mm high, along entire periphery.
3Road Work
Interlocking Pavers
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
One Under Ground Tanks of 332.55 KL capacity each
6Sewer System
Underground system using uPVC (SN-4) pipes
7Drain
Underground system using uPVC (SN-4) pipes
8Parks
Parks having total area of 1010.479 sq. m. shall be provided
9Tree Planting
68 Nos. trees are to be planted out of that 50% will be evergreen tree.
10Design For Electric Supply Including Street Lighting
Electricity Transformers of 220 KVA capacity shall be used along with necessary switch-gear for distributing electricity at LT voltage
11Community Buildings
Built up area of community buildings shall be 302.994 sq. m.
12Treatment and Disposal System of Sewage and Sullage water
STP of capacity 288.39 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer.
13Solid Waste Management And Disposal System
Manual collection and organic waste converter shall be provided in the project
14Water Conservation System
Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company.
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC &NOC from fire depp.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Facilities of Anganwadi, STP, organic waste converter shall be provided
18Emergency Evacuation Services
Staircases shall be provided In Basement & all the Towers for fire/ emergency exit as per norms.
19Other Miscellaneous Work
Building spaces/ plots for school, retail shops, creche, office space
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANURAG PATELUPRERAAGT22786
2SANDEEP KUMARUPRERAAGT22865
3SMC Real Estate Advisors Private LimitedUPRERAAGT10113
4VIPUL KUMAR DASUPRERAAGT15439
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 15 Oct 2022. 1 of them carries a revalidation, valid to 15 Oct 2025.

Sanctioned by Ghaziabad Development Authority · 10,521 sqm of land · an approved plan of 3 blocks and 425 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
123/Master Plan/ Zone-1/ 1716 Oct 201715 Oct 202215 Oct 202515 Oct 2022—
valid to 15 Oct 2025
as NA
123/Master Plan/ Zone-1/ 1716 Oct 201715 Oct 202215 Oct 202515 Oct 2022—
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 14 Apr 2023.

#Granted fromExtended uptoNote
115 Oct 202214 Apr 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1091 part9684 sq mtr.—
1092 part837 sq. mtr—
10919684Khasra
1092837Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1362
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4927
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4988
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5447
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5520
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9737
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10314
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10315
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9625
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9626
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9627
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9628
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11332
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 14113
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14167
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6111
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6505
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14888
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14933
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1288
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3330
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3006
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3161
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2750
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New13 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New28 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New28 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New28 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New17 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Dec 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Dec 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Dec 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old8 Nov 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old8 Nov 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per Approved Sanctioned Plan
Fire safety (as filed with RERA)As per Approved Sanctioned Plan
Health serviceAs per Approved Sanctioned Plan
Renewable energyAs per Approved Sanctioned Plan
Other facilitiesAs per Approved Sanctioned Plan

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMEHAK INFRASTRUCTURE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM15003
PANAADCR1107K
CIN / TAN9088803684
Name of chairmanRajan Malhotra
Registered addressAAC-03, Shipra Krishna Azure, Behind Web Cinema kaushambi, Ghaziabad UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Mehak Infrastructure Pvt. Ltd.BankIDBI BANKBranchIDBI BANK VASANT KUNJ ,NEW DELHIA/C no.IFSCIBKL0001670
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Mehak Jeevan

Is Mehak Jeevan RERA registered?

Yes. Mehak Jeevan is registered with UPRERA under registration number UPRERAPRJ14329, registered on 12 Nov 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Mehak Jeevan been completed?

UPRERA still lists Mehak Jeevan as Registered, so it is not shown as completed here. A completion certificate dated 16 Aug 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Mehak Jeevan?

MEHAK INFRASTRUCTURE PRIVATE LIMITED is the promoter entity that filed Mehak Jeevan with UPRERA (promoter RERA ID UPRERAPRM15003). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Mehak Jeevan more time to complete?

UPRERA's record carries 1 completion extension for Mehak Jeevan, the latest running to 14 Apr 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Mehak Jeevan have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Mehak Jeevan located?

Mehak Jeevan is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Mehak Jeevan?

The unit plan filed with UPRERA lists 1 BHK, OTHER, 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Mehak Jeevan?

The approved unit plan filed with UPRERA runs from 12 to 303 m² of carpet area (about 131 to 3,261 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Mehak Jeevan?

The approved unit plan describes 3 blocks and 425 units of which 413 are homes and 12 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Mehak Jeevan?

About 163 units per acre: 425 planned units across 2.60 acres (10,521 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗