Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
100%Q3'25
62.18%Q4'25
62.18%Q1'26
97.19%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ817845
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start20 Aug 2023
Project duration60 months
AddressNAMO COUNTY, NH 27, KANPUR GWALIOR BYPASS, SIMARDHA, JHANSI, SIMARDHA, Jhansi, Jhansi
TehsilJhansi
Applicant typePartnership Firm
Applicant addressNAMO COUNTY, NH 27 KANPUR GWALIOR BYPASS SIMARDHA, JHANSI (U.P.)-284003
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Plotted Resi Development/ Plotted Housing/01475/JDA/LD/23-24/0144/23062023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered6 Dec 2023
Original completion9 Aug 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,56,000
Sanctioning authorityJhansi Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JITENDRA KUMAR SINGH
License CA/2012/56163
CREATIVE ASSOCIATES, OPP NEW BUSSTAND, BSA COLLEGE STATE BANK ROAD MATHURA UP 281004
Engineer
ER. ASHISH KUMAR SAHU
CP-1/105A, FIST FLOOR, RADHIKA VIHAR, PHASE 2 NEAR MOTI MANJIL, MATHURA, UP 281004
Contractor
MR. ASHISH KUMAR MISHRA
NEAR GOVT PRIMARY SCHOOL SIJWAHA RAKSA JHANSI
Sr.Development work declared to RERA
1Demarcation of Plots
DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SETBACKS
2Boundary Wall
BOUNDRY WALL AT SITE WILL BE MADE OF FLY ASH / CLAY BRICKS WITH COLUMN BEAM STRUCTUTRE . THE HEIGHT OF THE BOUNDRY WALL WILL BE 06 FT. PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDRY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED.
3Road Work
CONCRETE / APEX ROAD WILL BE MADE AT THE SITE. THE VASE OF THE ROAD WILL BE FILLED BY RED MURAM. AFTER THAT TWO LAYER OF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK , AFTER THIS THE TOP LAYER WILL BE COLOURED, BLACKE WHITE APEX. ROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
4Footpaths
FOOTPATHS WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCK PAVERS WITH A MINIMUM PATHS WIDTH 1.5 MTR THICKNESS 80MM
5Water Supply Including Drinking Water Facilities
FOR WATER SUPLLY WE HAVE A PROVISION OF BORING WATER. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE .
6Sewer System
SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE , ALL WATER DRAINS WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENT PLANT. THIS STP WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION.
7Drain
DRAIN WILL BE MADE BELOW THE FOOTHPATHS WITH CHAMBERS . DRAINS WILL BE MADE WITH BRICKWORK AND PVC PIPE OF DIFFERENT DIA, THE WATER FROM DUPLEX WILL COME THROUGH PVC PIPE AND THIS DRAINS AND A PROPER SLOPE WILL BE MENTIONED IN STP PLANT. THE WATER WILL GET COLLECTED THROUGH DRAINS IN STP PLANT
8Parks
PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SITOUT SPACE ETC.
9Tree Planting
TREE WILL BE PLANTED AROUND 400 IN NUMBERS ALL OVER THE CAMPUS AND IN THE GARDEN AS WELL
10Design For Electric Supply Including Street Lighting
IRON POLES WITH STREET LIGHT WILL BE PLACED ALL OVER THE CAMPUS AND PROPER ELCTRIFICATION WITH TRANSFORMER AND WIRING WILL BE DONE AS SHOWN IN THE LAYOUT. ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARK WIRES, MODULAR SWITCHES WITH PROPER EARTHING ARRANGMENTS.
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER WILL BE COLLECTED FROM DIFFERENT SOURCES (KITCHEN WATER, BATHROOM WATER, USE FOR WASHING CLOTHS ETC.) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON AREAS ETC
13Solid Waste Management And Disposal System
NOT APPLICABLE
14Water Conservation System
WATER CONSERVATION SYSTEM WILL BE PROVIDED ON SITE. IN THIS WE WILL MAKE BOTH IN DIFFRENT POINTS IN THE GARDEN AS WELL AS IN THE COMMON AREA. IN THIS WE STORE RAIN WATER BELOW THE LAND AND STOCK THAT WATER TO FLUSH OUT FROM DRAINS AT THE TIME OF RAINY SEASON.
15Energy Management System Including Use of Renewable Energy
NOT APPLICABLE
16Fire Protection And Fire Safety System
NOT APPLICABLE
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA, LUSH GREEN GARDEN
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
NOT APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Aug 2028.

Sanctioned by Jhansi Development Authority · 50,169 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Plotted Resi Development/ Plotted Housing/01475/JDA/LD/23-24/0144/2306202311 Aug 202310 Aug 20289 Aug 20319 Aug 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

34 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
258/2, 260 MI4780Khasra
260 MI3240Khasra
2741390Khasra
259, 261, 2621900Khasra
2741390Khasra
4008100Khasra
2646760Khasra
2631340Khasra
2741390Khasra
258/12020Khasra
4002540Khasra
2701437Khasra
2731106Khasra
2731106Khasra
273810Khasra
4005280Khasra
259, 261, 2621900Khasra
259, 261, 2621900Khasra
4001780Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 9943
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9944
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9964
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10672
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11109
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11110
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11248
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11250
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11530
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13142
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 362
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1199
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1205
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1558
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2119
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2738
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · REPLY FOR OBJECTIONS
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New17 Oct 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Sept 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Sept 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Sept 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Sept 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Sept 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Sept 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Sept 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Sept 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Sept 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Sept 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New30 Sept 2023 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q2.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q362.18%CA ↗ · Arch ↗ · Eng ↗
2025-Q462.18%CA ↗ · Arch ↗ · Eng ↗
2026-Q197.19%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHRI PEETAMBARA INFRACITY LLP
RolePromoter · current
RERA IDUPRERAPRM251944
PANAEQFS8625D
CIN / TANAGRS20792C
Registered addressNAMO COUNTY, NH 27 KANPUR GWALIOR BYPASS SIMARDHA, JHANSI (U.P.)-284003
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRACITY LLP COLLECTION A/C NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZARBRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI, UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRACITY LLP SEPERATE A/C NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZAR BRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI, UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRACITY LLP TXN AC NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZAR BRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Namo County

Is Namo County RERA registered?

Yes. Namo County is registered with UPRERA under registration number UPRERAPRJ817845, registered on 6 Dec 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Namo County?

The completion date filed with UPRERA is 9 Aug 2028. No completion certificate is on record yet.

Who is the builder of Namo County?

SHRI PEETAMBARA INFRACITY LLP is the promoter entity that filed Namo County with UPRERA (promoter RERA ID UPRERAPRM251944). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Namo County have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Namo County located?

Namo County is registered in SIMARDHA, Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗