Namo County is a RERA-registered residential project by SHRI PEETAMBARA INFRACITY LLP in SIMARDHA, Jhansi (RERA ID UPRERAPRJ817845). Registered with a completion deadline of 9 Aug 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ817845 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Jhansi Development Authority |
| Proposed start | 20 Aug 2023 |
| Project duration | 60 months |
| Address | NAMO COUNTY, NH 27, KANPUR GWALIOR BYPASS, SIMARDHA, JHANSI, SIMARDHA, Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Partnership Firm |
| Applicant address | NAMO COUNTY, NH 27 KANPUR GWALIOR BYPASS SIMARDHA, JHANSI (U.P.)-284003 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi Development/ Plotted Housing/01475/JDA/LD/23-24/0144/23062023
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 6 Dec 2023 |
| Original completion | 9 Aug 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,56,000 |
| Sanctioning authority | Jhansi Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SETBACKS |
| 2 | Boundary Wall BOUNDRY WALL AT SITE WILL BE MADE OF FLY ASH / CLAY BRICKS WITH COLUMN BEAM STRUCTUTRE . THE HEIGHT OF THE BOUNDRY WALL WILL BE 06 FT. PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDRY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED. |
| 3 | Road Work CONCRETE / APEX ROAD WILL BE MADE AT THE SITE. THE VASE OF THE ROAD WILL BE FILLED BY RED MURAM. AFTER THAT TWO LAYER OF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK , AFTER THIS THE TOP LAYER WILL BE COLOURED, BLACKE WHITE APEX. ROAD WILL BE 7.5 MTR TO 12 MTR WIDE. |
| 4 | Footpaths FOOTPATHS WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCK PAVERS WITH A MINIMUM PATHS WIDTH 1.5 MTR THICKNESS 80MM |
| 5 | Water Supply Including Drinking Water Facilities FOR WATER SUPLLY WE HAVE A PROVISION OF BORING WATER. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE . |
| 6 | Sewer System SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE , ALL WATER DRAINS WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENT PLANT. THIS STP WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION. |
| 7 | Drain DRAIN WILL BE MADE BELOW THE FOOTHPATHS WITH CHAMBERS . DRAINS WILL BE MADE WITH BRICKWORK AND PVC PIPE OF DIFFERENT DIA, THE WATER FROM DUPLEX WILL COME THROUGH PVC PIPE AND THIS DRAINS AND A PROPER SLOPE WILL BE MENTIONED IN STP PLANT. THE WATER WILL GET COLLECTED THROUGH DRAINS IN STP PLANT |
| 8 | Parks PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SITOUT SPACE ETC. |
| 9 | Tree Planting TREE WILL BE PLANTED AROUND 400 IN NUMBERS ALL OVER THE CAMPUS AND IN THE GARDEN AS WELL |
| 10 | Design For Electric Supply Including Street Lighting IRON POLES WITH STREET LIGHT WILL BE PLACED ALL OVER THE CAMPUS AND PROPER ELCTRIFICATION WITH TRANSFORMER AND WIRING WILL BE DONE AS SHOWN IN THE LAYOUT. ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARK WIRES, MODULAR SWITCHES WITH PROPER EARTHING ARRANGMENTS. |
| 11 | Community Buildings NOT APPLICABLE |
| 12 | Treatment and Disposal System of Sewage and Sullage water TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER WILL BE COLLECTED FROM DIFFERENT SOURCES (KITCHEN WATER, BATHROOM WATER, USE FOR WASHING CLOTHS ETC.) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON AREAS ETC |
| 13 | Solid Waste Management And Disposal System NOT APPLICABLE |
| 14 | Water Conservation System WATER CONSERVATION SYSTEM WILL BE PROVIDED ON SITE. IN THIS WE WILL MAKE BOTH IN DIFFRENT POINTS IN THE GARDEN AS WELL AS IN THE COMMON AREA. IN THIS WE STORE RAIN WATER BELOW THE LAND AND STOCK THAT WATER TO FLUSH OUT FROM DRAINS AT THE TIME OF RAINY SEASON. |
| 15 | Energy Management System Including Use of Renewable Energy NOT APPLICABLE |
| 16 | Fire Protection And Fire Safety System NOT APPLICABLE |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA, LUSH GREEN GARDEN |
| 18 | Emergency Evacuation Services NOT APPLICABLE |
| 19 | Other Miscellaneous Work NOT APPLICABLE |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 10 Aug 2028.
Sanctioned by Jhansi Development Authority · 50,169 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi Development/ Plotted Housing/01475/JDA/LD/23-24/0144/23062023 | 11 Aug 2023 | 10 Aug 2028 | 9 Aug 2031 | 9 Aug 2028 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
34 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 258/2, 260 MI | 4780 | Khasra |
| 260 MI | 3240 | Khasra |
| 274 | 1390 | Khasra |
| 259, 261, 262 | 1900 | Khasra |
| 274 | 1390 | Khasra |
| 400 | 8100 | Khasra |
| 264 | 6760 | Khasra |
| 263 | 1340 | Khasra |
| 274 | 1390 | Khasra |
| 258/1 | 2020 | Khasra |
| 400 | 2540 | Khasra |
| 270 | 1437 | Khasra |
| 273 | 1106 | Khasra |
| 273 | 1106 | Khasra |
| 273 | 810 | Khasra |
| 400 | 5280 | Khasra |
| 259, 261, 262 | 1900 | Khasra |
| 259, 261, 262 | 1900 | Khasra |
| 400 | 1780 | Khasra |
| Registry document · 9943 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9944 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9964 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10672 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11109 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11110 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11248 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11250 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11530 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13142 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 362 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1199 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1205 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1558 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2119 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2738 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1430-1435 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · REPLY FOR OBJECTIONS The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Oct 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Sept 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 30 Sept 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 30 Sept 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Oct 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 30 Sept 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 30 Sept 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Sept 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 30 Sept 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 30 Sept 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 30 Sept 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 30 Sept 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 30 Sept 2023 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 62.18% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 62.18% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 97.19% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SHRI PEETAMBARA INFRACITY LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM251944 |
| PAN | AEQFS8625D |
| CIN / TAN | AGRS20792C |
| Registered address | NAMO COUNTY, NH 27 KANPUR GWALIOR BYPASS SIMARDHA, JHANSI (U.P.)-284003 |
| RERA contact | |
| Registered since | 2023 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SHRI PEETAMBARA INFRACITY LLP COLLECTION A/C NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZARBRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI, UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SHRI PEETAMBARA INFRACITY LLP SEPERATE A/C NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZAR BRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI, UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SHRI PEETAMBARA INFRACITY LLP TXN AC NAMO COUNTYBankSTATE BANK OF INDIABranchSIPRI BAZAR BRANCHBranch addressSBI SIPRI BAZAR, NANDANPURA SHIVPURI ROAD JHANSI UP - 284003Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0004566 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 21 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Namo County
Is Namo County RERA registered?
Yes. Namo County is registered with UPRERA under registration number UPRERAPRJ817845, registered on 6 Dec 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Namo County?
The completion date filed with UPRERA is 9 Aug 2028. No completion certificate is on record yet.
Who is the builder of Namo County?
SHRI PEETAMBARA INFRACITY LLP is the promoter entity that filed Namo County with UPRERA (promoter RERA ID UPRERAPRM251944). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Namo County have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Namo County located?
Namo County is registered in SIMARDHA, Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗