NAMO RESIDENCY

UPRERARegistered

NAMO RESIDENCY is a RERA-registered mixed project by SHRI PEETAMBARA INFRATECH LLP in Jhansi (RERA ID UPRERAPRJ798158). Registered with a completion deadline of 28 Feb 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
100%Q3'25
100%Q4'25
100%Q1'26
100%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ798158
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start1 Apr 2022
Project duration59 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typePartnership Firm
Applicant addressGS 01 VISION HEIGHTS HOUSING SOCIETY NEAR RAJGHAT COLONY SHIVPURI ROAD JHANSI
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    129/UPADHYAKSH/JDA/2021-22

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 May 2022
Original completion28 Feb 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary24 Oct 2025
Registration fee₹2,62,500
Sanctioning authorityJhansi Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PRIYEN NIRANJAN GAJJAR
License CA/2017/87399
NW 52 SOAMIBAGH AGRA 282005
Engineer
GURU PRASAD
54 NEHRU NAGAR AGRA - 282002
Contractor
SHASHIKANT DWIVEDI
1054/2A KHATI BABA MANDIR ISAI TOLA JHANSI 284003
Sr.Development work declared to RERA
1Demarcation of Plots
DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SET BACK.
2Boundary Wall
BOUNDRY WALL AT SITE WILL BE MADE OF FLY ASH / CLAY BRICKS WITH COLUMN AND BEAM STRUCTURE. THE HEIGHT OF THE BOUNDRY WALL BE FT. PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDRY WALL AFTER THAT TWO COAT OF PAINTSWILL BE COATED.
3Road Work
CONCRETE / APEX ROADS WILL BE MADE AT SITE. THE BASE OF THE ROAD WILL BE FILL RED MORUM. AFTER THAT TWO LAYERS OF AGGREGATEMM WILL BE LAID TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED AND BLACK AND WHITE APEX . ROAD WILL BE 9MTR. TO 12 MTR WIDE .
4Footpaths
FOOTHPATHS WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCK PAVERS WITH A MINIMUM PATH WIDTH 1.5 MTR AND THICKNESS OF 80MM.
5Water Supply Including Drinking Water Facilities
FOR WATER SUPPLY WE HAVE A PROVISION OF BORING WATER. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. WATER WILL GET STORED IN UNDERGROUND TANKS AND FROM THERE WATER WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS . THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE.
6Sewer System
SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE , ALL WATER DRAINS AND WASTE DRAIN WILL COME AND CONNECT IN THIS SEWAGE TREATMENT PLANT. THIS STP WILL FILTER THE WATER AND THAT WILL BE USED FOR PLANTATION .
7Drain
DRAIN WILL BE MADE BELOW THE FOOTPATHS WITH CHAMBERS AT 10 MTR. DISTANCE. DRAINS WILL BE MADE WITH BRICKS WORK AND PVC PIPES OF DIFFERENT DIA. THE WATER FROM DUPLEX WILL COME THROUGH PVC PIPES IN THIS DRAINS AND A PROPER SLOPE WILL BE MAINTAINED TILL STP PLANT . THE WATR WIL GET COLLECTED THROUGH DRAINS IN STP PLANT .
8Parks
PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SIT OUT SPACE ETC.
9Tree Planting
WE WILL PLANT 400 TREES ALL OVER THE CAMPUS AND IN THE GARDEN AS WELL
10Design For Electric Supply Including Street Lighting
IRON POLES WITH STREET LIGHTS WILL BE PLACED ALL OVER THE CAMPUS AND PROPER ELECTRIFICATION WITH TRANSFORMERS AND WIRES WILL BE DONE AS SHOWN IN THE LAYOUT . ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARK WIRES, MODULAR SWITCHES WITH PROPER EARTHING ARRANGEMENTS .
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER COLLECTED FROM DIFFERENT SOURCES (KITCHEN WATER , BATHROOM WATER, USED FOR WASHING CLOTHS ETC) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON AREAS ETC.
13Solid Waste Management And Disposal System
NOT APPLICABLE
14Water Conservation System
WATER CONSERVATION SYSTEM WILL BE PROVIDED ON SITE IN THIS WE WILL MAKE BORE IN DIFFERENT POINTS IN THE GARDENS AS WELL AS IN THE COMMON AREAS . IN THIS WE STORE RAIN WATER BELOW THE LAND AND STOCK THAT WATER TO FLUSH OUT FROM DRAINS AT THE TIME OF RAINY SEASONS.
15Energy Management System Including Use of Renewable Energy
NOT APPLICABLE
16Fire Protection And Fire Safety System
NOT APPLICABLE
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROVIDING TODDLERS PARK, CHILDRENS PLAY STATION , SITOUT AREAS , LUSH GREEN GARDENS
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
NOT APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 28 Feb 2027.

Sanctioned by Jhansi Development Authority · 33,996 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
129/UPADHYAKSH/JDA/2021-2230 Mar 202228 Feb 202727 Feb 203028 Feb 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
370,265,266,368,367,364,36333995.59Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 10974
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9532
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9389
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10609
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9390
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Apr 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Apr 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New11 Apr 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Apr 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Apr 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Apr 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 May 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Apr 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Apr 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Apr 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 May 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New17 May 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New17 May 2022 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2022-Q1 to 2026-Q2.

QuarterConstructionCertificates
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHRI PEETAMBARA INFRATECH LLP
RolePromoter · current
RERA IDUPRERAPRM171540
PANAENFS6341D
CIN / TANAGRS20005G
Registered addressGS 01 VISION HEIGHTS HOUSING SOCIETY NEAR RAJGHAT COLONY SHIVPURI ROAD JHANSI
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameROOP NARAYAN
RoleCo-promoter
Applicant typeIndividual
Address1051 Civil Lines Near Srinath Hotel Jhansi
RERA contact

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRATECH LLP COLLECTION ACCOUNT FOR NAMO RESIDENCYBankSTATE BANK OF INDIABranchPERSONAL BANKINGBranch address373/2 3,CIVIL LINES GWALIOR ROAD JHANSI -284001Branch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0015504
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRATECH LLP SEPARATE ACCOUNT FOR NAMO RESIDENCYBankSTATE BANK OF INDIABranchPERSONAL BANKING BRANCHBranch address373/2 3, CIVIL LINES GWALIOR ROAD JHANSIBranch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0015504
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SHRI PEETAMBARA INFRATECH LLP TRANSACTION ACCOUNT FOR NAMO RESIDENCYBankSTATE BANK OF INDIABranchPERSONAL BANKING BRANCHBranch address373/2 3 CIVIL LINES GWALIOR ROAD JHANSIBranch districtJhansi, Uttar PradeshA/C no.IFSCSBIN0015504
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about NAMO RESIDENCY

Is NAMO RESIDENCY RERA registered?

Yes. NAMO RESIDENCY is registered with UPRERA under registration number UPRERAPRJ798158, registered on 28 May 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has NAMO RESIDENCY been completed?

UPRERA still lists NAMO RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 24 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of NAMO RESIDENCY?

SHRI PEETAMBARA INFRATECH LLP is the promoter entity that filed NAMO RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM171540). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does NAMO RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is NAMO RESIDENCY located?

NAMO RESIDENCY is registered in Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗