Nirmal Residency is a RERA-registered residential project by Yogda InfraCity LLP in Jhansi (RERA ID UPRERAPRJ637837). Registered with a completion deadline of 16 Jan 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ637837 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Jhansi Development Authority |
| Proposed start | 10 Oct 2021 |
| Project duration | 52 months |
| Address | Jhansi, Jhansi |
| Tehsil | Jhansi |
| Applicant type | Partnership Firm |
| Applicant address | 36, Shivaji Path, Cantt, Sadar Bazaar, Jhansi-284001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP20191118134858250
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 12 Oct 2021 |
| Original completion | 16 Jan 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Apr 2026 |
| Registration fee | ₹68,500 |
| Sanctioning authority | Jhansi Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots All Plots are demarcated as per the layout plan being attached having duplex no A1 to A35 of 1180 sq. ft each and B1 to B31 of 1058 sq. ft each. The plot would be demarcated as per the plot area above mentioned for each block |
| 2 | Boundary Wall All plots are covered by separate boundary walls of atleast 1.5 metres. The colony would be having the boundary wall at the boundary of the colony of height of atleast 2.5 metres. |
| 3 | Road Work Black top road is being proposed to be laid down in the colony. The roads in front of villas in Block A is of 40 Feets broad whereas road infront of villas in Block B is of 25 Feets broad.
The road would be laid out across the colony for the comfort of the residents. |
| 4 | Footpaths Paved block with footpath as per approved layout being attached.
Footpath would be made across the blocks for the walking residents. The footpath would be of 2 feet wide out side the units . |
| 5 | Water Supply Including Drinking Water Facilities Water for general utility and drinking water purpose will be provided by the laid pipeline. The water supply would be provided through the underground water and the water line laid by the government authority. The water supply would be through the pipeline laid from the master tanker to the plot demarcated. |
| 6 | Sewer System Sewer system would be made for the cleanliness of the colony. The sewerage plan would be made for the flow of sullage water easily through the sewer system.
Proposed Sewer Treatment plant will be installed for the treatment of the sewer. |
| 7 | Drain Drain would be constructed in the blocks for the removal of residual waste out of the residency through sewage. The same would be constructed as per service layout approved and attached. The drain would be made under the paved pathway. The plan would be made such a way that the water at the road would be flown down in drain. |
| 8 | Parks Park area of 1962.62 sq. mt will be developed as per the approved layout plan.
2 parks would be constructed within the colony.
Park would containing temple, meditation centre, badminton court and other facilities for the kids to play games in the colony. |
| 9 | Tree Planting 132 trees will be planted all over the residency. The trees would be planted for the beauty of the colony. The horticulture department of the company would be planting trees of different heights as per the requirements. |
| 10 | Design For Electric Supply Including Street Lighting Electric Pole and separate electricity connection will be taken from concerned electricity department of Jhansi. Electricity department of Jhansi would be the supplier of electricity and the line for electricity would be laid underground. |
| 11 | Community Buildings A clubhouse of 100 sq. mt. has been proposed on the first floor of the commercial area as proposed in the layout. The community hall would be constructed at the entrance of the colony. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage Treatment Plant has been proposed in the amenities of the colony and the same would be made as per the approved plan.
The sullage water would be treated for the further use. |
| 13 | Solid Waste Management And Disposal System Solid waste will be collected regularly by the cleaning department of the city i.e. Nagar Palika. Dsutbins would be placed in the colony in order to keep the colony clean. The dustbin will be placed at regular distance for the comfort of residents |
| 14 | Water Conservation System Water Harvesting plan has been proposed and the same would be implemented for the water conservation. |
| 15 | Energy Management System Including Use of Renewable Energy The residents will follow the Government norms . |
| 16 | Fire Protection And Fire Safety System Government norms for the fire safety system would be followed. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per the approved layout being attached. |
| 18 | Emergency Evacuation Services As per the approved layout being attached |
| 19 | Other Miscellaneous Work All other amenities, works and services would be performed as per the approved service layout plan being attached. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jul 2026.
Sanctioned by Jhansi Development Authority · 12,671 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP20191118134858250 | 17 Jul 2021 | 16 Jul 2026 | 16 Jul 2029 | 16 Jan 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 557/1 , 558/2 , 561/2 | 12671.47 | Khasra |
| Sale deed · 4289 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1423-1428 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 18 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Aug 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 30 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 30 Aug 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 18 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 30 Aug 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 30 Aug 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Aug 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 18 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 30 Aug 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 30 Aug 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Sept 2021 ↗ |
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2025-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 109% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 114% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 118% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Yogda InfraCity LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM150391 |
| PAN | AACFY5308F |
| CIN / TAN | AGRY10330F |
| Registered address | 36, Shivaji Path, Cantt, Sadar Bazaar, Jhansi-284001 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Jhansi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RERA Seperate AccountBankState Bank of IndiaBranchJhansi- Uttar PradeshA/C no.IFSCSBIN0017628 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Nirmal Residency
Is Nirmal Residency RERA registered?
Yes. Nirmal Residency is registered with UPRERA under registration number UPRERAPRJ637837, registered on 12 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Nirmal Residency been completed?
UPRERA still lists Nirmal Residency as Registered, so it is not shown as completed here. A completion certificate dated 16 Apr 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Nirmal Residency?
Yogda InfraCity LLP is the promoter entity that filed Nirmal Residency with UPRERA (promoter RERA ID UPRERAPRM150391). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Nirmal Residency have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Nirmal Residency located?
Nirmal Residency is registered in Jhansi, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗