Radhika Orchid

UPRERACompleted

Radhika Orchid is a RERA-registered residential project by MARS DEVELOPERS AND BUILDTECH INDIA PRIVATE LIMITE in Jhansi (RERA ID UPRERAPRJ11334). RERA status: Completed on 21 Jun 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11334
Project categoryResidential
Registration typeOngoing
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start9 Aug 2017
Original start9 May 2016
Project duration93 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typeCompany
Applicant addressB-14 AND 15, MODI TOWER, CIVIL LINES, JHANSI, Uttar Pradesh, India, 284001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Permit revalidated (3)

  3. 4 building permits sanctioned

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Aug 2017
Original completion8 May 2023
Revised completion6 May 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary21 Jun 2025
Registration fee₹2,10,500
Sanctioning authorityJhansi Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AR.GEETA AHUJA & AR.ASHISH GAUTAM
License CA/98/22838, CA/2017/83220
RENTIWA CREATION (P) LTD, B-2/114,1ST FLOOR SECTOR -16 ROHINI DELHI-110089
Engineer
MOHAMAD NAUMAN
RENTIWA CREATION (P) LTD , B-2/114,1ST FLOOR SECTOR -16 ROHINI DELHI-110089
Contractor
Arbindra
GHA Construction 1881 Dadiyapura,jhansi
Sr.Development work declared to RERA
1Demarcation of Plots
Plot demarcation as per master plan approved by Jhansi Development Authority
2Boundary Wall
Outer boundary wall with main gate for security of the project.
3Road Work
Road as per standard specification and as per approved master plan.
4Footpaths
Footpath will be provided alongthe road as per road requirement.
5Water Supply Including Drinking Water Facilities
Groundwater supply through borewells would be stored in water tank, treated and supplied for drinking water. Will connect to government water supply when available.
6Sewer System
Sewer system as per approved master plan will be connected to STP.
7Drain
Drains as per approved storm water system plan.
8Parks
Parks of different sizes as per approved master plan will be made with green cover and trees and entertainment facilities.
9Tree Planting
Tree planation along road side will be done as per standard specifications.
10Design For Electric Supply Including Street Lighting
Design for electric supply would be done as per approved electrical plan. Power backup for the common/utility areas will be provided as per requirement of the project/as per local authority norms.
11Community Buildings
Not applicable as per norms of the community building/development authority.
12Treatment and Disposal System of Sewage and Sullage water
Sewage water will be treated as per standard norms and reused to maintain parks and watering of trees. Sullage water along with drain water will go to the Rain water harvesting pits for recharge.
13Solid Waste Management And Disposal System
Garbage Store at selected locations planned to collect solid waste. The same would be integrated with municipal waste management.
14Water Conservation System
Rainwater harvesting pits at various locations to collect rainwater for recharge. STP treated water will be used for parks and watering of trees.
15Energy Management System Including Use of Renewable Energy
Electricity connection from government supply, DG set supply to cater to power failures. Solar lights to be used to the maximum to cater to common area power supply.
16Fire Protection And Fire Safety System
Garden hydrants as per requirement as per fire safety norms will be provided along with road.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Club, indoor and outdoor sports facilities, amphitheatre and parks for social gatherings.
18Emergency Evacuation Services
As per standard practices and norms
19Other Miscellaneous Work
Main Gate , Provision of the guard room , CCTV , Room (Only structure work ) for HT,LT panel.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

4 permits

An approval and the date it runs to - not proof the work matching it was done.

4 sanctioning permits are on record with UPRERA, the latest valid to 8 Aug 2022. 3 of them carry a revalidation.

Sanctioned by Jhansi Development Authority · 41,062 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
0904001139 Aug 20178 Aug 20228 Aug 20258 May 2023—
0904001139 Aug 20178 Aug 20228 Aug 20257 Nov 20239 Aug 2017
0904001139 Aug 20178 Aug 20228 Aug 20256 May 20259 Aug 2017
0904001139 Aug 20178 Aug 20228 Aug 20256 May 20259 Aug 2017
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 6 May 2025.

#Granted fromExtended uptoNote
18 May 20237 Nov 2023Six months extension in view of force majeure caused by covid-19 pandemic
27 Nov 20236 May 2025—

Land & documents

42 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
783/782/58210600—
536/58115510—
581/53615500—
580/5866150—
5822260—
783/782/58210600Khasra
536/58115510Khasra
581/53615500Khasra
580/5866150Khasra
5822260Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 8 Jun 2007.

Registry no.DateTypeArea
24098 Jun 2007self—
40374 Oct 2007self—
431319 Oct 2007self—
822529 Dec 2010self—
665620 Sept 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2409
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Apr 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Apr 2019 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old15 Aug 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old15 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old15 Aug 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterSafe and hygienic treated drinking water will be supplied through Borewell in line with the sanctioned plumbing plan till government water supply reaches the site
Fire safety (as filed with RERA)Project is a low rise with wide roads for safe movement of fire tenders. Fire fighting measures shall be adopted as per NBC guidelines. External yard hydrants installed around all buildings in the complex
Health serviceAs per sanction plan
Renewable energyAll effective government norms related to low rise row housing have been followed in design element to tap natural energy sources. Wherever possible solar lights will be used to cater to energy needs of common areas/utility areas as per feasibility
Other facilitiesLandscaped and manicured park/gardens, Club with party lawn, sports facilities like badminton, TT , kids play areas, power-back up for common areas, round the clock security with CCTV cameras

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

21 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMARS DEVELOPERS AND BUILDTECH INDIA PRIVATE LIMITE
RolePromoter · current
RERA IDUPRERAPRM1989
PANAAFCM5121L
CIN / TANU45201UP2006PTC031936
Name of chairmanDIRECTORS 1) MANISH AGARWAL 2) SANJEETA AGARWAL
Registered addressB-14 AND 15, MODI TOWER, CIVIL LINES, JHANSI, Uttar Pradesh, India, 284001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
MARS DEVELOPERS AND BUILDTECH INDIA PVT. LTD.BankYES BANK LIMITEDBranchJHANSI BRANCHA/C no.IFSCYESB0000113
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Radhika Orchid

Is Radhika Orchid RERA registered?

Yes. Radhika Orchid is registered with UPRERA under registration number UPRERAPRJ11334, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Radhika Orchid been completed?

UPRERA lists Radhika Orchid as completed, with a completion certificate dated 21 Jun 2025, against a filed deadline of 6 May 2025.

Who is the builder of Radhika Orchid?

MARS DEVELOPERS AND BUILDTECH INDIA PRIVATE LIMITE is the promoter entity that filed Radhika Orchid with UPRERA (promoter RERA ID UPRERAPRM1989). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Radhika Orchid more time to complete?

UPRERA's record carries 2 completion extensions for Radhika Orchid, the latest running to 6 May 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Radhika Orchid have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Radhika Orchid located?

Radhika Orchid is registered in Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗