Ozone City Phase-7 The Golden Estate is a RERA-registered residential project by OZONE BUILDERS & DEVELOPERS PVT LIMITED in Aligarh (RERA ID UPRERAPRJ510771). RERA status: Completed on 30 Nov 2024.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ510771 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Aligarh Development Authority |
| Proposed start | 20 Dec 2022 |
| Project duration | 60 months |
| Address | Koil, Aligarh |
| Tehsil | Koil |
| Applicant type | Company |
| Applicant address | Flat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi development/Plotted Housing/00714/AGDA/LD/21-22/0100/05082021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Mar 2023 |
| Original completion | 14 Dec 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 30 Nov 2024 |
| Registration fee | ₹1,61,500 |
| Sanctioning authority | Aligarh Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The Project land is demarcated as follows- by North- Phase-5th map no.-43/15(2012-13), by south- submitted online map for approval map no.- AGDA/LD/20-21/0732, by East Phase-2, map no.- 731/15 (2008-09), by west another land, khasra no.-48, and the individual plots are demarcated by the construction of demarcation with Piller nos. and with brickwork. |
| 2 | Boundary Wall 3.0 Metre high boundary wall with brickwork and one side plaster R.C.C Columns approx. 4.5 to 5.0 meters from center to center. The boundary wall shall be earthquake-resistant. |
| 3 | Road Work All roads in the complex will be in combination with RCC and concrete pavers of different colors, shapes, and thicknesses. Roads will be laid over 225 mm water-bound macadam. |
| 4 | Footpaths All footpaths in the complex will be in combination with concrete pavers of different colors, shapes, and thicknesses of 65 mm and 80 mm laid over a 150 mm water-bound macadam surface. |
| 5 | Water Supply Including Drinking Water Facilities Drinking water supply is to be provided through the existing overhead tank to the plots and treated water will be supplied from STP for irrigation. The drinking water source is from existing tube wells. A water filtration plant is installed before the overhead tank. |
| 6 | Sewer System The sewage will be collected through RCC/ Soil pipeline arrangement, bends, and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and the main pipeline of 400 mm dia shall be used. |
| 7 | Drain Rain water shall be collected in drains having minimum width of 150mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in the periphery of the complex and these manholes shall be finally connected with the drain of harvesting pits and overflow to jaffri drain. Inspection chambers shall be of 900 mm dia and the main pipeline of 300 mm dia shall be used. |
| 8 | Parks A lush green internal park will be provided and maintained. The parks will have jogging tracks, a pavilion, childrens play areas and sitting areas. The total park area in the project will be 4877.72 sq. mtr. |
| 9 | Tree Planting The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora, and vegetation shall be as pe the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage of the project. The 76 no. of trees shall be planted in the entire project area. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply is provided through 33/0.415 KV transformers installed in adjoining land owned by the promoter. External street lighting shall be through grid power. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage shall be treated in a sewage treatment plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purposes. |
| 13 | Solid Waste Management And Disposal System Solid waste is to be collected from individual plots and stored in the garbage room. The professional service provider shall be engaged for the disposal of solid waste outside the project premises. |
| 14 | Water Conservation System Rainwater harvesting pits of 13 nos. and size 1.50 mtr. diameter each shall be provided for ground water recharging and overflow to be discharged in the jaffari drains. Treated sewage shall be used for irrigation. |
| 15 | Energy Management System Including Use of Renewable Energy A single point supply of 33kv shall be taken and through an electric substation, 440v supply shall be supplied to individual plots through distribution panels and sub meters. |
| 16 | Fire Protection And Fire Safety System Not Applicable. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Common social infrastructure shall be provided for all the phases combined. |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 14 Dec 2027.
Sanctioned by Aligarh Development Authority · 31,299 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi development/Plotted Housing/00714/AGDA/LD/21-22/0100/05082021 | 15 Dec 2022 | 14 Dec 2027 | 13 Dec 2030 | 14 Dec 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 65, 69/6, 171/1, 171/2, 172, 173Min, 174 Min, 42/3, 48/2, 48/5, 48/7, 9/4, 116/1 | 31299.78 | Khasra |
| Registry document · 7866 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3894 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3894 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9896 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5002 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11450114 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12500 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12749 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8619 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11247 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6281 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3035 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9500 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10318 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2054 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Jan 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 10 Jan 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 10 Jan 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 10 Jan 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Dec 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Dec 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Dec 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Jan 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Jan 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Jan 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Jan 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Jan 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 10 Jan 2023 ↗ |
Quarterly progress reports
11 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
11 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | OZONE BUILDERS & DEVELOPERS PVT LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5303 |
| PAN | AAAC07666F |
| CIN / TAN | U70101DL2005PTC139612 |
| Name of chairman | PARVEEN MANGLA |
| Registered address | Flat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | OZONE INFRAHEIGHT PRIVATE LIMITED |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM217403 |
| Applicant type | Company |
| PAN | AAACQ2109B |
| CIN / TAN | U70102UP2009PTC039047 |
| Name of chairman | Parveen Mangla |
| Registered address | OZONE CLUB REGIONAL HEAD OZONE CITY ASADPUR KAYAM ALIGARH Aligarh UP 202001 IN |
| RERA contact | |
| Registered since | 2023 |
| Legal name | PARVEEN MANGLA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | HOUSE NO.1329, SECTOR-16, FARIDABAD, HARYANA, INDIA |
| RERA contact |
| Legal name | SANJEEV MADAN |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | HOUSE NO B- 806, SAINIK COLONY SECTOR 49 FARIDABAD, HARYANA, INDIA |
| RERA contact |
| Legal name | RAJESH KUMAR AGARWAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | D-3/502, Puri Parnayam Appartment, Sector-82-85, Faridabad-121004 |
| RERA contact |
Nearby projects
Aligarh
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Ozone Builders and Developers Pvt. Ltd.- Collection Account for Ozone City Phase-7 The Golden EstateBankKarnataka Bank LimitedBranchNOIDABranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Ozone Builders and Developers Pvt. Ltd.- Separate Bank Account for Ozone City Phase-7 The Golden EstateBankKarnataka Bank LimitedBranchNOIDABranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Ozone Builders and Developers Pvt. Ltd.- RERA Transaction Account for Ozone City Phase-7 The Golden EstateBankKarnataka Bank LimitedBranchNOIDABranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Ozone City Phase-7 The Golden Estate
Is Ozone City Phase-7 The Golden Estate RERA registered?
Yes. Ozone City Phase-7 The Golden Estate is registered with UPRERA under registration number UPRERAPRJ510771, registered on 10 Mar 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has Ozone City Phase-7 The Golden Estate been completed?
UPRERA lists Ozone City Phase-7 The Golden Estate as completed, with a completion certificate dated 30 Nov 2024, against a filed deadline of 14 Dec 2027.
Who is the builder of Ozone City Phase-7 The Golden Estate?
OZONE BUILDERS & DEVELOPERS PVT LIMITED is the promoter entity that filed Ozone City Phase-7 The Golden Estate with UPRERA (promoter RERA ID UPRERAPRM5303). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Ozone City Phase-7 The Golden Estate have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Ozone City Phase-7 The Golden Estate located?
Ozone City Phase-7 The Golden Estate is registered in Aligarh, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗