Samsara Studio Apartments Phase - IV

UPRERARegistered

Samsara Studio Apartments Phase - IV is a RERA-registered residential project by OZONE BUILDERS & DEVELOPERS PVT LIMITED in Yakutpur, Aligarh (RERA ID UPRERAPRJ111795). Registered with a completion deadline of 27 Feb 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
40.34%Q4'24
40.34%Q1'25
40.34%Q2'25
40.34%Q3'25
40.34%Q4'25
57.76%Q1'26
62.99%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ111795
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAligarh Development Authority
Proposed start1 Oct 2024
Project duration29 months
AddressKhasra No. 74 & 88 in Village Yakutpur, Tehsil - Koil, Aligarh, 202001, Yakutpur, Koil, Aligarh
TehsilKoil
Applicant typeCompany
Applicant addressFlat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Housing/02085/AGDA/BP/23-24/0291/27102023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Nov 2025
Original completion31 Oct 2026
Revised completion27 Feb 2027
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹26,000
Sanctioning authorityAligarh Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors160 · 1 · 4 (units from plan)
  • 1 BHK80 50%
  • 2 BHK80 50%
ConfigurationUnitsCarpet area
1 BHK8033-34
2 BHK8043-43
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK, 2 BHK416033-43
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Shri Manish Kumar Srivastav
License CA/2020/119044
Ward No. 26, Laxmi Chowk, Bagaha - 1, Near Axis Bank, West Champaran, 845101
Engineer
Mr. Shakeel Ahmed Khan
Firdos Nagar, Killa Road (Paschim) Masjid Ke Samne Koil, Aligarh , 202001 (UP)
Contractor
ARUN SHARMA
Vardhman Mall Sector - 19, Faridabad - 121002
Sr.Development work declared to RERA
1Demarcation of Plots
The project land demarcated as follows - "Samsara Studio Apartment Phase - IV situated at Khasra No. 74 and 88, Village YakutPur, Tehsil Koil, Aligarh, Latitude 27.8117660 and Longitude 78.132162 to the North Land of Ozone Builders and Developers Private Limited to the South Ozone City Phase VI The Golden Estate to the East Land of Ozone Builders and Developers Private Limited to the West 9 meters wide road Ozone City Phase VI The Golden Estate admeasuring 4148.89 sq. meter.
2Boundary Wall
2 Meter High boundary wall with brickwork and both side plaster RCC Column 3 to 5 meters from center to center. The boundary wall shall be earthquake resistant.
3Road Work
All the roads in the complex will be in the combination with RCC and concrete pavers of different colors, shapes and thickness. The Road will be 3 meters laid over 225mm water bound macadam.
4Footpaths
All the footpath in the complex will be in combination with concrete pavers of different colors, shapes and thickness of 125mm laid over 225mm water bound macadam surface.
5Water Supply Including Drinking Water Facilities
Drinking water supply is to be provided through the existing overhead tank to the apartments and treated water will be supplied from the STP for irrigation. The drinking water source is from existing tube wells. A water filtration plant is installed before the overhead tank.
6Sewer System
The sewage will be collected through RCC/ Soil pipeline arrangements, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and the main pipeline is 400 mm dia shall be used
7Drain
Rziin water shall be collected in drains having width 150mm connected to the underground cement concrete pipelines. For discharge water will be collected in manholes to be constructed in the periphery of the complex and these manholes shall be finally connected with the drain of harvesting pits and overflow to Jaffri drain. Inspection chambers shall be of 900mm dia and the main pipeline is of 300 mm dia shall be used.
8Parks
Not Applicable
9Tree Planting
The trees will be planted at all suitable locations of the project and along withe boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the service / usage of the project. Total 21 No. trees shall be planted in the entire project.
10Design For Electric Supply Including Street Lighting
Electricity supply is provided through 33/0.415 KV transforms installed in adjoining land owned by the promoter. External Street Lights shall be used through grid power.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be treated in a sewage treatment plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purposes.
13Solid Waste Management And Disposal System
Solid waste is to be collected from individuals apartments and stored in the garbage rooms. The professional services provider shall be engaged for the disposal of solid waste outside the project premise.
14Water Conservation System
Rain water harvesting 13 nos. and size 1.50 meter diameter each shall be provided for ground water recharging and overflow to be discharged in the Jaffri drains. Treated swage shall be used for irrigation.
15Energy Management System Including Use of Renewable Energy
A single point supply of 33KV shall be taken and through electric sub station and 440V supply shall be supplied to individual apartments through panels and sub meters.
16Fire Protection And Fire Safety System
All the requisite requirements has been done.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common social infrastructure shall be provided for all the phases combined.
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Jun 2029.

Sanctioned by Aligarh Development Authority · 4,149 sqm of land · an approved plan of 1 block and 160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Housing/02085/AGDA/BP/23-24/0291/2710202314 Jun 202413 Jun 202913 Jun 203231 Oct 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 27 Feb 2027.

#Granted fromExtended uptoNote
131 Oct 202627 Feb 2027Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
74971.820Khasra
741583.333Khasra
741006.910Khasra
74395.833Khasra
88191.000Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · Bahi 1, Jild 12200, Page 359 -378, S. No. 17418
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Bahi 1, Jild 9453, Page No. 25 - 70, S. No. 6587
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Bahi 1, Jild 9414 page No. 35 - 50, S. No. 5887
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Bahi 1, Jild 5736, Page No. 217 - 258, S. No. 7500
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Bahi 1, Jild 10411, Page 1-28, S.No. 8535
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1430 - 1435 (01 July, 2022 to 30 June 2028)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435 (01July, 2022 to 30 June, 2028)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New14 Oct 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Sept 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Sept 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Oct 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Sept 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Sept 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Sept 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Sept 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Oct 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Oct 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Nov 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Oct 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Sept 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New26 Sept 2025 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q2.

QuarterConstructionCertificates
2024-Q340.34%CA ↗ · Arch ↗ · Eng ↗
2024-Q440.34%CA ↗ · Arch ↗ · Eng ↗
2025-Q140.34%CA ↗ · Arch ↗ · Eng ↗
2025-Q240.34%CA ↗ · Arch ↗ · Eng ↗
2025-Q340.34%CA ↗ · Arch ↗ · Eng ↗
2025-Q457.76%CA ↗ · Arch ↗ · Eng ↗
2026-Q162.99%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOZONE BUILDERS & DEVELOPERS PVT LIMITED
RolePromoter · current
RERA IDUPRERAPRM5303
PANAAAC07666F
CIN / TANU70101DL2005PTC139612
Name of chairmanPARVEEN MANGLA
Registered addressFlat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Aligarh

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
OZONE BUILDERS AND DEVELOPERS PVT LTD COLL ACC FOR SAMSARA STUDIO APRT PH IVBankPUNJAB NATIONAL BANKBranchTALA NAGRIBranch addressTala Nagari, Near Rasik Tower, Aligarh, Uttar PradeshBranch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600Branch emailBo954600@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
OZONE BUILDERS AND DEVELOPERS PVT LTD SEP ACC FOR SAMSARA STUDIO APRT PH IVBankPunjab National BankBranchTala NagriBranch addressTala Nagri, Near Rasik Tower. Aligarh, Uttar PradeshBranch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
OZONE BUILDERS AND DEVELOPERS PVT LTD RERA TRANS ACC FOR SAMSARA STUDIO APRT PH IVBankPunjab National BankBranchTala NagriBranch addressTala Nagri, Near Rasik Tower, Aligarh, Uttar PradeshBranch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
13 Oct 2026
Revised completion date on file2027-02-28 → 2027-02-27
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2027-02-28 → 2027-02-27
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-10-31 → 2027-02-28
changed in Estanzo’s record
5 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Samsara Studio Apartments Phase - IV

Is Samsara Studio Apartments Phase - IV RERA registered?

Yes. Samsara Studio Apartments Phase - IV is registered with UPRERA under registration number UPRERAPRJ111795, registered on 27 Nov 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Samsara Studio Apartments Phase - IV?

The completion date filed with UPRERA is 27 Feb 2027. No completion certificate is on record yet.

Who is the builder of Samsara Studio Apartments Phase - IV?

OZONE BUILDERS & DEVELOPERS PVT LIMITED is the promoter entity that filed Samsara Studio Apartments Phase - IV with UPRERA (promoter RERA ID UPRERAPRM5303). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Samsara Studio Apartments Phase - IV more time to complete?

UPRERA's record carries 1 completion extension for Samsara Studio Apartments Phase - IV, the latest running to 27 Feb 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Samsara Studio Apartments Phase - IV have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Samsara Studio Apartments Phase - IV located?

Samsara Studio Apartments Phase - IV is registered in Yakutpur, Aligarh, as filed with UPRERA.

What configurations are available in Samsara Studio Apartments Phase - IV?

The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Samsara Studio Apartments Phase - IV?

The approved unit plan filed with UPRERA runs from 33 to 43 m² of carpet area (about 356 to 465 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Samsara Studio Apartments Phase - IV?

The approved unit plan describes 1 block and 160 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Samsara Studio Apartments Phase - IV?

About 156 units per acre: 160 planned units across 1.03 acres (4,149 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗