Ozone City Phase-VI The Golden Estate

UPRERACompleted

Ozone City Phase-VI The Golden Estate is a RERA-registered residential project by OZONE INFRAHEIGHT PRIVATE LIMITED in Aligarh (RERA ID UPRERAPRJ502288). RERA status: Completed on 10 Sept 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
100%Q3'25
100%Q4'25
100%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ502288
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAligarh Development Authority
Proposed start15 Jul 2023
Project duration60 months
AddressKoil, Aligarh
TehsilKoil
Applicant typeCompany
Applicant addressOZONE CLUB REGIONAL HEAD OZONE CITY ASADPUR KAYAM ALIGARH Aligarh UP 202001 IN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Plotted Resi development/ Plotted Housing/ 01728/ AGDA/ LD/23-24/ 0048/ 19052023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Sept 2023
Original completion13 Jul 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary10 Sept 2025
Registration fee₹2,05,000
Sanctioning authorityAligarh Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar. Mr. Vakil Mittal
License CA/2010/50178
1023, 10th Floor, JMD MegaPolis, Sector- 48, Gurgaon- 122001
Engineer
Not applicable because of plotted development.
Not applicable because of plotted development.
Contractor
Mr. Mayank Agarwal Director of Arete Constructions Private Limited
SCF Plot No.- 09, Ozone City, Mahua Khera, Quarsi Bye Pass, Aligarh, Uttar Pradesh
Sr.Development work declared to RERA
1Demarcation of Plots
The project land is demarcated as follows by north- Ozone City Phase-3rd Map no. 10/15(2012-13) to the south other project in name of Smiley Homes, East- Land of owner and other land of village Yakutpur, Tehsil Koil, Aligarh-202001, to the west- Ozone City Phase- VII The golden Estate Map no.- AGDA/LD/21-22/0100, and the individual plots are demarcated by construction of demarcation with pillar nos. and with brick work.
2Boundary Wall
3.0 metres high boundary wall with brick work and one side plaster R.C.C columns approx. 4.5 to 5.0 metres centre to centre. The boundary wall shall be earthquake resistant.
3Road Work
All roads in the complex will be in combination of R.C.C and concrete pavers of different colours, shape, thickness. Roads will be laid over 255 mm water bound macadam surface.
4Footpaths
All footpaths in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80 mm aid over 150 mm water bound macadam surface.
5Water Supply Including Drinking Water Facilities
Drinking water supply will be provided through the existing over head tank to the plots and treated water will be supplied to STP for irrigation. Drinking water source is from existing tube wells. Water filtration plant is installed before the overhead tank.
6Sewer System
The sewerage will be collected through RCC/ soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and main pipeline of 400 mm dia shall be used.
7Drain
Rain water shall be collected in drains having a minimum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in periphery of complex and these man holes shall be finally connected with drain of harvesting pits and over flow to jaffri drain. Inspection chambers shall be of 900 mm dia and main pipeline of 300 mm dia shall be used.
8Parks
Lush green internal park will be provided and maintained. The parks will have jogging tracks, pavillion, children play area ad sitting areas. The total park area in the project will be 4877.72 sq. mtr.
9Tree Planting
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project. The 76 no. of trees shall be planted in the entire project.
10Design For Electric Supply Including Street Lighting
Electric supply will be provided through 33/0.415 KV transformers installed in adjoining land owned by the promoter. External street lighting shall be through power grid.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be treated in Sewage Treatment Plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purpose.
13Solid Waste Management And Disposal System
Solid waste to be collected from individual plots and stored in garbage room. Professional service provider shall be engaged for disposal of solid waste outside the project premises.
14Water Conservation System
Rain water harvesting pits of 18 nos. and size 1.50 mtr diameter each shall be provided for ground water recharging and overflow to be discharged in the jaffri drains. Treated sewage shall be used for irrigation.
15Energy Management System Including Use of Renewable Energy
Single point supply of 33KV shall be taken and through electric sub station 440V supply shall be supplied to individual plots through distribution panels and sub meters.
16Fire Protection And Fire Safety System
Not Applicable
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common social infrastructure shall be provided for all the phases combined.
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Jul 2028.

Sanctioned by Aligarh Development Authority · 39,997 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Plotted Resi development/ Plotted Housing/ 01728/ AGDA/ LD/23-24/ 0048/ 1905202314 Jul 202313 Jul 202812 Jul 203113 Jul 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Gata no.- 171/3, 171/4, 179/2, 179/3, 180, 222MIN, 151/2, 171/5, 179/1, 149/1, 149/2, 73,74, 73/3, 151/3 and 69/139996.61Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 69/1
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2855
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9453
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11391
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12684
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11505
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8001
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4426
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9500
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 932
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8656
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 10154
The registered deed by which the promoter bought the land.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Jul 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New24 Jul 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New24 Jul 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New24 Jul 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Jul 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New22 Jul 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New22 Jul 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New22 Jul 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New22 Jul 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New22 Jul 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 Jul 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New22 Jul 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New24 Jul 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q1.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOZONE INFRAHEIGHT PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM217403
PANAAACQ2109B
CIN / TANU70102UP2009PTC039047
Name of chairmanParveen Mangla
Registered addressOZONE CLUB REGIONAL HEAD OZONE CITY ASADPUR KAYAM ALIGARH Aligarh UP 202001 IN
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameOZONE BUILDERS & DEVELOPERS PVT LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM5303
Applicant typeCompany
PANAAAC07666F
CIN / TANU70101DL2005PTC139612
Name of chairmanPARVEEN MANGLA
Registered addressFlat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040
RERA contact
Registered since2017

Nearby projects

Aligarh

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
OZONE INFRAHEIGHT PRIVATE LIMITED- COLLECTION ACCOUNT FOR OZONE CITY PHASE- VI THE GOLDEN ESTATEBankKarnataka Bank LimitedBranchNoidaBranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
OZONE INFRAHEIGHT PRIVATE LIMITED- SEPARATE BANK ACCOUNT FOR OZONE CITY PHASE VI- THE GOLDEN ESTATEBankKarnataka Bank LimitedBranchNoidaBranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
OZONE INFRAHEIGHT PRIVATE LIMITED- RERA TRANSACTION ACCOUNT FOR OZONE CITY PHASE VI- THE GOLDEN ESTATEBankKarnataka Bank LimitedBranchNoidaBranch addressK 23/24, Sector 18, Noida, Gautam Buddha Nagar, Uttar Pradesh- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKARB0000545
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
RERA statusregistered → completed
changed in Estanzo’s record
18 Oct 2026
When these facts last moved
RERA statuschanged in Estanzo’s record · 18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Ozone City Phase-VI The Golden Estate

Is Ozone City Phase-VI The Golden Estate RERA registered?

Yes. Ozone City Phase-VI The Golden Estate is registered with UPRERA under registration number UPRERAPRJ502288, registered on 21 Sept 2023. Estanzo reproduces that filing; it does not verify the work behind it.

Has Ozone City Phase-VI The Golden Estate been completed?

UPRERA lists Ozone City Phase-VI The Golden Estate as completed, with a completion certificate dated 10 Sept 2025, against a filed deadline of 13 Jul 2028.

Who is the builder of Ozone City Phase-VI The Golden Estate?

OZONE INFRAHEIGHT PRIVATE LIMITED is the promoter entity that filed Ozone City Phase-VI The Golden Estate with UPRERA (promoter RERA ID UPRERAPRM217403). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Ozone City Phase-VI The Golden Estate have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Ozone City Phase-VI The Golden Estate located?

Ozone City Phase-VI The Golden Estate is registered in Aligarh, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗