SANGWAN CITY PHASE-III

UPRERARegistered

SANGWAN CITY PHASE-III is a RERA-registered residential project by SANGWAN LANDCO PVT. LTD in Aligarh (RERA ID UPRERAPRJ432004). Registered with a completion deadline of 15 Jan 2025. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ432004
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAligarh Development Authority
Proposed start15 Jul 2020
Project duration55 months
AddressKoil, Aligarh
TehsilKoil
Applicant typeCompany
Applicant addressGF-38, INDRA PRAKASH BUILDING, 21 BARAKHAMBA ROAD, NEW DELHI CENTRAL DELHI-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP-20190517152718367

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Oct 2020
Original completion15 Jan 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary3 Jul 2026
Registration fee₹5,00,000
Sanctioning authorityAligarh Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL GORLE
License CA/2002/30395
136 (A) UNA ENCLAVE MAYUR VIHAR-1 NEW DELHI-110091
Engineer
NITYANAND PRASAD
CONCEPT DESIGN CONSORTIUM D-126, IInd FLOOR, NEAR GOLF COURCE METRO STATION SEC-36 NOIDA UP
Contractor
DAV CONSTRUCTION
A-20, HIG DUPLEX, SECTOR-23, SANJAY NAGAR GHAZIABAD UP-201002
Sr.Development work declared to RERA
1Demarcation of Plots
The project is situated nearby city, on the front side another project is running, and other sides of the project have vacate land
2Boundary Wall
We will sold the independent plot to the owner and we will recommend to the owner to make the boundary wall with Brick work and RCC and tiles.
3Road Work
Road work will be made of Concrete Cement of good Quality
4Footpaths
Footpath will be made of Paver Bricks
5Water Supply Including Drinking Water Facilities
For Water Supply for some construction activity we have fixed bore well on the project, and for drinking water i have make arrangement form outside vendors for good quality Drinking water for labour staff.
6Sewer System
A good Quality Sewerage System to be developed before finalization of the Projects
7Drain
For drain we will use good quality PVC Pipes
8Parks
There will be good parks spaces at the various places of this projects to maintain the good environment for the human,
9Tree Planting
Green Tree planting will be fixed at the verious place of this projects.
10Design For Electric Supply Including Street Lighting
Electric Supply will be from UPPCL and design will be as per Electricity Supply plan of this projects and we will use best quality street lights on this projects
11Community Buildings
There is no community building in this projects however the small place for waiting will be there.
12Treatment and Disposal System of Sewage and Sullage water
For the Treatment of the Disposal Sewerage we will use a good rating outside vendors for cleaning and for Sullage water we will fixed good quality water purifier.
13Solid Waste Management And Disposal System
For solid waste management and disposal we will use outside good rating vendors
14Water Conservation System
For drinking water conversation we will use Security guard at Drinking water point and use signage for save water at every point,
15Energy Management System Including Use of Renewable Energy
Energy management for energy saving we will use LED and low power consumption equipment’s at the projects
16Fire Protection And Fire Safety System
There is no need to fix fire system on the plots however A good Quality fire safety system will be used at the site office of the project and we regularly checked at appropriate interval, also the fire extinguisher will be established at office,
17Social Infrastructure And Other Public Amenities Including Public Health Services
On the Projects site various banner/signage will be established to save/ aware to the human for life safety.
18Emergency Evacuation Services
There is no need to established Emergency Evacuation Services
19Other Miscellaneous Work
Other all work will be done with the help of best quality equipments at the projects
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 14 Jul 2025.

Sanctioned by Aligarh Development Authority · 98,974 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP-2019051715271836715 Jul 202014 Jul 202514 Jul 202515 Jan 2025
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

42 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
268M2300Khasra
268M1540Khasra
268M2300Khasra
261M2300Khasra
261M2300Khasra
260/261M11520Khasra
268M2650Khasra
263/2666910Khasra
250M1000Khasra
261M11250Khasra
270M3000Khasra
265M5373Khasra
2612300Khasra
262/2674035Khasra
261M1730Khasra
262/2674035Khasra
261M960Khasra
270M2300Khasra
2651540Khasra
265M2205Khasra
268M709.75Khasra
268M1064.66Khasra
26311520Khasra
77M1150Khasra
77M1150Khasra
249M/2523892Khasra
251/2593340Khasra
249M2300Khasra
258M2300Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1424-1429, 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 1/8640-PAGE NO-305 TO 332/7076
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9191 PAGE 161 TO 182/1917
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/11105 PAGE 189 TO 216/5320
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9500 PAGE 299 TO 330/7550
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9556 PAGE 203 TO 230/8659
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9139 PAGE 369 TO 458/992
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9013 PAGE 301 TO 328/13599
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/11745 PAGE 49 TO 74/1562
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/11724 PAGE 229 TO 280/1264
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/13144 PAGE 173 TO 222/4502
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/13123 PAGE 271 TO 296/4144
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/12680 PAGE 197 TO 216/6495
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/14473 PAGE 55 TO 82/7008
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/14233 PAGE 15 TO 40/2985
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/14233 PAGE 41 TO 70/2986
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/14471 PAGE 185 TO 210/6965
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9068 PAGE 55 TO 94/14576
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9348 PAGE 1 TO 26/4638
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/12412 PAGE 233 TO 250/1207
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/12414 PAGE 1 TO 18/1250
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9406 PAGE 235 TO 248/5728
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9421 PAGE 255 TO 286/6023
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/11724 PAGE 153 TO 178/1262
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9766 PAGE 133 TO 150/12535
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/9931 PAGE 57 TO 74/15371
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/14625 PAGE 117 TO 140/9490
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/10768 PAGE 119 TO 158/14612
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/12399-PAGE NO-47 TO 70/924
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1/11048-PAGE NO-34/4320
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · (AMENDED 1/9666 PAGE NO-195 TO 206/10427) (ORIGINAL 1/9421 PAGE NO-255 TO 286/6023
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · (AMENDED 1/9666 PAGE NO-179 TO 186/1072) (ORIGINAL 1/9406 PAGE NO-235 TO 248/5728
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Sept 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Aug 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Aug 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 Aug 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Aug 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Aug 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Aug 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Oct 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Aug 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Aug 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New14 Aug 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Aug 2020 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2023-Q2.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSANGWAN LANDCO PVT. LTD
RolePromoter · current
RERA IDUPRERAPRM13902
PANAAKCS7569M
CIN / TANU45200DL2007PTC159641
Name of chairmanTEJENDRA SINGH
Registered addressGF-38, INDRA PRAKASH BUILDING, 21 BARAKHAMBA ROAD, NEW DELHI CENTRAL DELHI-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameNARENDRA KUMAR
RoleCo-promoter
Applicant typeIndividual
Address28, Sec-5, chiranjeev vihar ghaziabad up-201002
RERA contact
Legal nameSANGWAN DEVELOPERS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressGF-38, INDRA PRAKASH BUILDING, 21, BARAKHAMBA ROAD NEW DELHI-110001
RERA contact
Legal nameK S MAINTENANCE & FACILITIES PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressGF-38, INDRA PRAKASH BUILDING, 21, BARAKHAMBA ROAD, NEW DELHI Central Delhi DL 110001 IN
RERA contact
Legal nameSANGWAN BUILDER
RoleCo-promoter
Applicant typeProprietorship Firm
AddressGF-38 INDRA PRAKASH BUILDING, 21 BARAKHAMBA ROAD, NEW DELHI-01
RERA contact
Legal nameSANGWAN BUILDWEL PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressGF-38, INDRA PRAKASH BUILDING, 21, BARAKHAMBA ROAD, NEW DELHI Central Delhi DL 110001 IN
RERA contact

Nearby projects

Aligarh

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SANGWAN LANDCO PRIVATE LIMITEDBankPUNJAB NATIONAL BANKBranchRAM GHAT ROADA/C no.IFSCPUNB0656300
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SANGWAN CITY PHASE-III

Is SANGWAN CITY PHASE-III RERA registered?

Yes. SANGWAN CITY PHASE-III is registered with UPRERA under registration number UPRERAPRJ432004, registered on 21 Oct 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has SANGWAN CITY PHASE-III been completed?

UPRERA still lists SANGWAN CITY PHASE-III as Registered, so it is not shown as completed here. A completion certificate dated 3 Jul 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SANGWAN CITY PHASE-III?

SANGWAN LANDCO PVT. LTD is the promoter entity that filed SANGWAN CITY PHASE-III with UPRERA (promoter RERA ID UPRERAPRM13902). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does SANGWAN CITY PHASE-III show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does SANGWAN CITY PHASE-III have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SANGWAN CITY PHASE-III located?

SANGWAN CITY PHASE-III is registered in Aligarh, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗