Rishita Mulberry Heights Phase 2

UPRERARegistered

Rishita Mulberry Heights Phase 2 is a RERA-registered residential project by RISHITA DEVELOPERS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ323529). Registered with a completion deadline of 30 Sept 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ323529
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Sept 2019
Project duration49 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressUnit No. 1201, 12th Floor, Tower T-2, Crescent Heights, Sultanpur Road, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Oct 2019
Original completion31 Mar 2023
Revised completion30 Sept 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Sept 2023
Registration fee₹24,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors60 · 1 · 15 (units from plan)
  • 3 BHK56 93%
  • 2 BHK4 7%
ConfigurationUnitsCarpet area
2 BHK4111
3 BHK56134-137
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower B1 · 2 BHK, 3 BHK1560111-137
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Design Forum International
License CA/2012/57857
K-47, Kailash Colony, New Delhi
Engineer
Er. Maqsud-e-Nazar
P.N. 25, Ground Floor, Pocket-2, Jasola, New Delhi
Contractor
Rishita Developers Pvt. Ltd.
116/117, Vibhuti Khand, Corronation Anand Tower, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
This is a single plot of rectangular shape, having total 3 no. of entry gate in which 1 main gate having a grand entrance from the 45m wide front road and rest of 2 are secondary gates from 24 m wide road. Site is surrounded by other plots on one side and 30m wide road.
2Boundary Wall
1.8 - 2.4m high and 200 mm thick Boundary wall designed. Concrete hollow blockwork and RCC work in column and beam may be used as per design. Entrance gates will be created at the main entrance. Steel Gates will be used at secondary entrances
3Road Work
Paver/tremix based road will be created for all internal road works with concrete pavers at certain junction points.
4Footpaths
All internal roads will have 1.5m wide footpath in 40- 60 mm thick concrete pavers or equivalent finishes
5Water Supply Including Drinking Water Facilities
Underground Tank of 830 KL Capacity.
6Sewer System
Underground System using uPVC(SN-4) Sewer pipes.
7Drain
Underground System using uPVC(SN-4) pipes.
8Parks
There is one main central park between the towers with different recreational activities. There are more green parks by the boundary wall on two sides of the complex
9Tree Planting
"There are 3 types of trees provided in site which are Bahunia Blackena(12 no.), Phoenix Dactylifera(220 No.), Ficus Benjamina(218 No.)"
10Design For Electric Supply Including Street Lighting
Five nos. Transformers of 1600 KVA, 33 / 0.4 KV capacity each shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street/landscape lighting shall be LED-based & automatically controlled by an astronomical timer and for energy saving, the same shall be selectively controlled by a timer as per the time zone
11Community Buildings
Community activity area shall be provided at the site in the central area which shall be accessed by all residents.
12Treatment and Disposal System of Sewage and Sullage water
STP of Capacity 720 KLD shall be provided. Treated water shall be used for Flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal Sewer as per site.
13Solid Waste Management And Disposal System
There is a proper garbage collection area provided for solid waste management.
14Water Conservation System
Rain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible.
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on the terrace for renewable energy. Energy purchased from the grid/ power supply company & metering will be done as per electricity supply authority guideline.
16Fire Protection And Fire Safety System
Fire Tender path shall be provided as per NBC. Fire Fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
"Sewerage, Storm water and water supply system shall be provided. We have Proposed common Pump Room with Primary filtration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing goes down through gravity from domestic as well as flushing tanks. All Sewage shall go to the STP for recycling the water. Stormwater for Roof, Roads and other areas shall be connected to the Stormwater drain channel and go to the Rainwater harvesting Pit for recharge the Groundwater and overflow shall be connected with Municipal drain."
18Emergency Evacuation Services
The balcony will also be used for evacuation. Assembly points areas will be demarcated for earthquake and other possible disasters
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

34 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ABHAY PRATAP SINGHUPRERAAGT10207
3ABHISHEK KUMAR SINGHUPRERAAGT15288
4AMIT KUMAR NISHADUPRERAAGT14016
5ANAROCK Property Consultants Private LimitedUPRERAAGT10265
6ANGERONA CONSULTING PRIVATE LIMITEDUPRERAAGT17055
7ARCHANA GUPTAUPRERAAGT10881
8ASA FINCAP ADVISORS LLPUPRERAAGT10926
9ASHUTOSH KUMAR SINGHUPRERAAGT14912
10Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt LtdUPRERAAGT10906
11DAIWIK REALTORSUPRERAAGT12075
12GOLDEN ESTATEUPRERAAGT10397
13HITESH KHANNAUPRERAAGT13833
14INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
15INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
16Karshni Buildwell Pvt LtdUPRERAAGT11401
17KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
18KONRAI OVERSEASUPRERAAGT14764
19Mukesh kumar SharmaUPRERAAGT11494
20PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
21RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
22Rishabh SaxenaUPRERAAGT13851
23RISHTA INFRABUILD PVT LTDUPRERAAGT15197
24SAIM AHMADUPRERAAGT15637
25SANTOSH KUMARUPRERAAGT10156
26SeedWill Consulting Private LimitedUPRERAAGT15794
27SHRI RUDRA REAL ESTATESUPRERAAGT14251
28shrikant upadhyayUPRERAAGT15563
29SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
30Smart InfraReality Private LimitedUPRERAAGT10057
31SMC Real Estate Advisors Private LimitedUPRERAAGT10113
32SMITA SINGHUPRERAAGT12566
33SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
34Unnisis Infrratech Private LimitedUPRERAAGT15300
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 22 Aug 2023. 2 of them carry a revalidation, the latest valid to 17 Jan 2026.

Sanctioned by Lucknow Development Authority · 3,890 sqm of land · an approved plan of 1 block and 60 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
4291723 Apr 201822 Apr 202322 Apr 202631 Mar 2023—
4291723 Apr 201822 Aug 202317 Jan 202630 Sept 202323 Apr 2018
valid to 17 Jan 2026
4291723 Apr 201822 Apr 202322 Apr 202630 Sept 202323 Apr 2018
valid to 17 Jan 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2023.

#Granted fromExtended uptoNote
131 Mar 202330 Sept 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Part of Group Housing I, Plot no SECTOR C, POCKET 6, Sushant Golf City,Lucknow3889.52Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 22768
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · Reply against notice received dated 16.09.2019
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Letter of undertaking for Internal Development
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Sept 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Sept 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Sept 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Sept 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Sept 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Sept 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Sept 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Sept 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Sept 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Sept 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Sept 2019 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRISHITA DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM4294
PANAAECR1191G
CIN / TANU45201UP2008PTC035945
Name of chairmanSUDHIR KUMAR AGARWAL
Registered addressUnit No. 1201, 12th Floor, Tower T-2, Crescent Heights, Sultanpur Road, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
RISHITA DEVELOPERS PVT LTD. MULBERRY HEIGHTS PHASE-2BankYES BANK LTD.BranchVIBHUTI KHAND, GOMTI NAGARA/C no.IFSCYESB0000001
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Rishita Mulberry Heights Phase 2

Is Rishita Mulberry Heights Phase 2 RERA registered?

Yes. Rishita Mulberry Heights Phase 2 is registered with UPRERA under registration number UPRERAPRJ323529, registered on 17 Oct 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Rishita Mulberry Heights Phase 2 been completed?

UPRERA still lists Rishita Mulberry Heights Phase 2 as Registered, so it is not shown as completed here. A completion certificate dated 29 Sept 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Rishita Mulberry Heights Phase 2?

RISHITA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Rishita Mulberry Heights Phase 2 with UPRERA (promoter RERA ID UPRERAPRM4294). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Rishita Mulberry Heights Phase 2 more time to complete?

UPRERA's record carries 1 completion extension for Rishita Mulberry Heights Phase 2, the latest running to 30 Sept 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Rishita Mulberry Heights Phase 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Rishita Mulberry Heights Phase 2 located?

Rishita Mulberry Heights Phase 2 is registered in Lucknow, as filed with UPRERA.

What configurations are available in Rishita Mulberry Heights Phase 2?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Rishita Mulberry Heights Phase 2?

The approved unit plan filed with UPRERA runs from 111 to 137 m² of carpet area (about 1,196 to 1,473 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Rishita Mulberry Heights Phase 2?

The approved unit plan describes 1 block and 60 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Rishita Mulberry Heights Phase 2?

About 62 units per acre: 60 planned units across 0.96 acres (3,890 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗