RUDRAKSH PARADISE

UPRERARegistered

RUDRAKSH PARADISE is a RERA-registered residential project by HEMISH INFRASTRUCTURE PRIVATE LIMITED in Varanasi (RERA ID UPRERAPRJ625587). Registered with a completion deadline of 4 Aug 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ625587
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start4 Aug 2023
Project duration61 months
AddressPindra **, Varanasi
TehsilPindra **
Applicant typeCompany
Applicant address3/191, Vipul Khand, Gomti Nagar Lucknow Lucknow UP 226010 IN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    Plotted Resi development / Plotted Housing/01311/VDA/LD/22-23/0047/19042022

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Dec 2023
Original completion4 Aug 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹56,000
Sanctioning authorityVaranasi Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Avighna Associates
License CA/2015/71794
B- 303, Vinayak Plaza, Madlahiya Varanasi
Engineer
Kuldeep Gupta
RZ -932 POLE NUMBER-94 SADH NAGAR,PALAM,NEW DELHI 45.
Contractor
Santosh Kumar Gupta
6 Charan Nagar, Nadesar ,Varanasi
Sr.Development work declared to RERA
1Demarcation of Plots
Plot is already Demarcated with Brick made boundry wall.
2Boundary Wall
Boundry wall is proposed for security purpus all the development and construction will be done under the boundry wall
3Road Work
7.5 Mt. , 9 Mt. and bitminus road is proposed around the development which connecting to main road is proposed as per sanctioned plan.
4Footpaths
1 mt. wide foothpath using interlocking paver block is proposed along both side of the road, will be developed as per sanctioned plan
5Water Supply Including Drinking Water Facilities
Water supply including drinking water supply will be provided using over head water tank and tube well which connected to each plots and common amenities as per sanctioned plan.
6Sewer System
A centralised swewer system is provided , under ground sewer line is constructed which will linked with main dumping point. If required STP ETP plant will be installed as per requirment for recycling of waste material. Service manhole (inside Plot)- Size 600X600 (outside Plot) Size 9100/12000
7Drain
Sotrm water system will be provided which will be connected to the Muncipal drain line as per specified plan.
8Parks
N/A
9Tree Planting
Tree planting is proposed many type of trees and bushes will be planted as per norms of Varanasi Development Authority
10Design For Electric Supply Including Street Lighting
Centralized transformer , HT panel , LT panel, Feeder Pillar and DG backup for common services like external lighting. is proposed as per sanctioned plan.
11Community Buildings
A Community Center is propose as per sanctioned plan
12Treatment and Disposal System of Sewage and Sullage water
Centralized transformer , HT panel , LT panel, Feeder Pillar and DG backup for common services like external lighting. is proposed as per sanctioned plan.
13Solid Waste Management And Disposal System
there is propoer garbage collectione area is proposed as per sanctioned plan. garbage will be collected at marked are and after compliting the project it will be handed over to local muncipal authority for solid waste management.
14Water Conservation System
A well designed rainwater harvesting system shall be provided.
15Energy Management System Including Use of Renewable Energy
We will use LED lights as well as solar lights in external areas.
16Fire Protection And Fire Safety System
N/A
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 4 Aug 2028.

Sanctioned by Varanasi Development Authority · 9,615.98 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Plotted Resi development / Plotted Housing/01311/VDA/LD/22-23/0047/190420225 Aug 20234 Aug 20284 Aug 20314 Aug 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
8329750Khasra
830mi530Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 0000
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 000
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New15 Sept 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Oct 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Sept 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Sept 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New15 Sept 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Sept 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 Sept 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Oct 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Sept 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Oct 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New15 Sept 2023 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q1.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2026-Q194.41%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameHEMISH INFRASTRUCTURE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM202717
PANAAECH2069M
CIN / TANU70109UP2017PTC093767
Name of chairmanAVINASH CHANDRA
Registered address3/191, Vipul Khand, Gomti Nagar Lucknow Lucknow UP 226010 IN
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Hemish Infrastructure Private Limited- Collection Account for Rudraksh ParadiseBankIndusInd BankBranchNadesar VaranasiBranch addressS-2/639-26-A Mritunjay Dh Colony, Sikrol, Shivpur, Varanasi, Uttar pradesh-221002, IndiaBranch districtVaranasi, Uttar PradeshA/C no.IFSCINDB0002035
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Hemish Infrastructure Private Limited- Separate Account for Rudraksh ParadiseBankIndusInd BankBranchNadesar VaranasiBranch addressS-2/639-26-A Mritunjay Dh Colony, Sikrol, Shivpur, Varanasi, Uttar pradesh-221002, IndiaBranch districtVaranasi, Uttar PradeshA/C no.IFSCINDB0002035
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Hemish Infrastructure Private Limited- Transaction Account for Rudraksh ParadiseBankIndusInd BankBranchNadesar VaranasiBranch addressS-2/639-26-A Mritunjay Dh Colony, Sikrol, Shivpur, Varanasi, Uttar pradesh-221002, IndiaBranch districtVaranasi, Uttar PradeshA/C no.IFSCINDB0002035
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about RUDRAKSH PARADISE

Is RUDRAKSH PARADISE RERA registered?

Yes. RUDRAKSH PARADISE is registered with UPRERA under registration number UPRERAPRJ625587, registered on 5 Dec 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RUDRAKSH PARADISE?

The completion date filed with UPRERA is 4 Aug 2028. No completion certificate is on record yet.

Who is the builder of RUDRAKSH PARADISE?

HEMISH INFRASTRUCTURE PRIVATE LIMITED is the promoter entity that filed RUDRAKSH PARADISE with UPRERA (promoter RERA ID UPRERAPRM202717). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does RUDRAKSH PARADISE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RUDRAKSH PARADISE located?

RUDRAKSH PARADISE is registered in Varanasi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗