Shere`s Shalimar Mannat Extension-3

UPRERARegistered

Shere`s Shalimar Mannat Extension-3 is a RERA-registered residential project by M/s Shalimar Corp Ltd. in Barabanki (RERA ID UPRERAPRJ555231). Registered with a completion deadline of 19 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
55.48%Q3'25
61.02%Q4'25
82.6%Q1'26
82.6%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ555231
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start20 Oct 2022
Project duration48 months
AddressNawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    71/2022

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Jul 2022
Original completion19 Oct 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹62,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors160 · 4 · 11 (units from plan)
  • 3 BHK120 75%
  • 2 BHK40 25%
ConfigurationUnitsCarpet area
3 BHK12088-88
2 BHK4070-70
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-M1 · OTHER, 3 BHK114088-88
TOWER-M2 · OTHER, 2 BHK114070-70
TOWER-N1 · OTHER, 3 BHK114088-88
TOWER-N2 · OTHER, 3 BHK114088-88
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar. Alpana Bhargava - Ms JSR Designs Pvt. Ltd.
License CA/1994/17216
C-67, Defense Colony, New Delhi
Engineer
Er. Karunesh Kr. Srivastava
Shalimar Corporate Park, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Contractor
Mr. V.K. Tripathi - Daksh Tech Projects Pvt. Ltd.
4th Floor, 423, Parsvnath Planet Plaza, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Sr.Development work declared to RERA
1Demarcation of Plots
As per sanction plan this is rectangular plot. Having total 1 no. of entry gate and 1 no. of exit gate from the 18m wide road ,Site is surrounded by other plots on one side and one side by promoters plot.
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundry wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary .
3Road Work
Trimix / asphalt road will be used as per design suggested by the Architect for internal road.
4Footpaths
All Internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design.
5Water Supply Including Drinking Water Facilities
All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirements. The STP treated water shall also be supplied for irrigation purposes . For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewarge water shall be go to the STP for treatment . after treatment , water shall be recycled and it will use in gardening. flush tanks and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for Recharge the ground water and overflow shall be connect with Municiple drain line .
8Parks
There are significant green area beside building including green parks, play areas for childrens and different recretional activities.
9Tree Planting
The trees of category ornamental , shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintain greenary and natural view.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer , HT panel , LT panel , Feeder Pillar and DG back for common service like External lighting with timer control , STP , Pump Room Etc.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatment , water shall be recycle and it will use in gardening , flush tank and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
13Solid Waste Management And Disposal System
Project shall have waste segregation area . The solid waste shall be encouraged for segregation. Dustbin shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor . also timer controlled panels shall be used for efficient energy management .
16Fire Protection And Fire Safety System
All fire norms shall be followed as per NBC Part 4 Code and approval of fire department fire sprinklers , FHC with pumps are provided as per norms .
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire Staricase is provided in the each building , basements have access and exit in case of emergency . Dedicated assembly areas defined in the campus . Adedquate signage is also provided.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

25 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3Adish JainUPRERAAGT21672
4Anoop ShuklaUPRERAAGT20695
5ARVIND KUMARUPRERAAGT15927
6ASA FINCAP ADVISORS LLPUPRERAAGT10926
7Asit Gupta C/O Dwelling HomesUPRERAAGT20902
8BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
9BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
10GOLDEN ESTATEUPRERAAGT10397
11GOLDEN STAR REAL ESTATESUPRERAAGT10303
12Karshni Buildwell Pvt LtdUPRERAAGT11401
13MOHAMMAD RASHIDUPRERAAGT15251
14Mukesh kumar SharmaUPRERAAGT11494
15REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
16Rohit ChandaniUPRERAAGT11546
17SANJEEV KUMAR BANKAUPRERAAGT10894
18Saurabh GuptaUPRERAAGT14655
19Shashank ShuklaUPRERAAGT17091
20SINAN REALTY LLPUPRERAAGT11785
21Smart InfraReality Private LimitedUPRERAAGT10057
22VINAY KUMAR SINGHUPRERAAGT11226
23VISHESH SRIVASTAVAUPRERAAGT11416
24VIVEK VERMAUPRERAAGT18719
25Vivekanand ShuklaUPRERAAGT21638
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 May 2027.

Sanctioned by Any Other Competent Authority · 11,483 sqm of land · an approved plan of 4 blocks and 160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
71/202231 May 202230 May 202730 May 203019 Oct 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
52, 53, 54, 55, 59, 13111483Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 16425
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10817
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · Khatauni extracts of all khasra-highlighted
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Reply to objection letter
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Land area details - Mannat Ext-3
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Super imposed khasra map of Mannat Ext-3
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Jul 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Jun 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Jun 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Jun 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New7 Jul 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New7 Jul 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Jun 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Jun 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Jun 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New7 Jul 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New7 Jul 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New7 Jul 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New7 Jul 2022 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.

QuarterConstructionCertificates
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q255.48%CA ↗ · Arch ↗ · Eng ↗
2025-Q361.02%CA ↗ · Arch ↗ · Eng ↗
2025-Q482.6%CA ↗ · Arch ↗ · Eng ↗
2026-Q182.6%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Corp Ltd.
RolePromoter · current
RERA IDUPRERAPRM4092
PANAADCS9234L
CIN / TANU70100DL1988PLC390006
Name of chairmanMohd. Abdullah Masood
Registered addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameIMPERIAL GREEN INFRATECH PRIVATE LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM119014
Applicant typeCompany
PANAACCI9406K
CIN / TANU45400UP2012PTC050399
Name of chairmanABDUL SAGHIR SIDDIQUI
Registered address3-QUINTON ROAD, LALBAGH, LUCKNOW-226001
RERA contact
Registered since2020
Legal nameFARIAH SHERE
RoleCo-promoter
Applicant typeIndividual
AddressRahimabad House, Nadan Mahal Road, Nakhas, Lucknow-226003
RERA contact
Legal nameGAZELLE SHERE
RoleCo-promoter
Applicant typeIndividual
Address52B, Shakespeare Sarani, Circus Avenue, Kolkata - 700017
RERA contact
Legal nameSANAM SHERE
RoleCo-promoter
Applicant typeIndividual
AddressH. No. 14, Farangi Mahal, Victoria Steet, Chowk, Lucknow-226003
RERA contact
Legal nameSYED FARIDOON SHERE
RoleCo-promoter
Applicant typeIndividual
AddressH.No.3, Quinton Road, Nishat Hospital, Lalbagh, Lucknow
RERA contact
Legal nameENGILA SHERE
RoleCo-promoter
Applicant typeIndividual
AddressG-1390, Paisar Kothi, Barabanki-225001
RERA contact

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Shalimar Corp. Ltd - Coll A/c - Shere`s Shalimar Mannat Extension-3BankState Bank of IndiaBranchSafedabad Branch, BarabankiBranch addressSafedabad Branch, Faizabad Road, BarabankiBranch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Shalimar Corp. Ltd - Sep A/c - Shere`s Shalimar Mannat Extension-3BankState Bank of IndiaBranchSafedabad Branch, BarabankiBranch addressSafedabad Branch, Faizabad Road, BarabankiBranch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Shalimar Corp. Ltd - Trans A/c - Shere`s Shalimar Mannat Extension-3BankState Bank of IndiaBranchSafedabad Branch, BarabankiBranch addressSafedabad Branch, Faizabad Road, BarabankiBranch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Shere`s Shalimar Mannat Extension-3

Is Shere`s Shalimar Mannat Extension-3 RERA registered?

Yes. Shere`s Shalimar Mannat Extension-3 is registered with UPRERA under registration number UPRERAPRJ555231, registered on 14 Jul 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Shere`s Shalimar Mannat Extension-3?

The completion date filed with UPRERA is 19 Oct 2026. No completion certificate is on record yet.

Who is the builder of Shere`s Shalimar Mannat Extension-3?

M/s Shalimar Corp Ltd. is the promoter entity that filed Shere`s Shalimar Mannat Extension-3 with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Shere`s Shalimar Mannat Extension-3 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shere`s Shalimar Mannat Extension-3 located?

Shere`s Shalimar Mannat Extension-3 is registered in Barabanki, as filed with UPRERA.

What configurations are available in Shere`s Shalimar Mannat Extension-3?

The unit plan filed with UPRERA lists OTHER, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Shere`s Shalimar Mannat Extension-3?

The approved unit plan filed with UPRERA runs from 70 to 88 m² of carpet area (about 750 to 949 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Shere`s Shalimar Mannat Extension-3?

The approved unit plan describes 4 blocks and 160 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Shere`s Shalimar Mannat Extension-3?

About 56 units per acre: 160 planned units across 2.84 acres (11,483 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗