Shere Shalimar Mannat Extension

UPRERARegistered

Shere Shalimar Mannat Extension is a RERA-registered residential project by M/s Shalimar Corp Ltd. in Barabanki (RERA ID UPRERAPRJ243983). Registered with a completion deadline of 8 Aug 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ243983
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start10 Feb 2020
Project duration54 months
AddressNawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    235/2019

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Feb 2020
Original completion9 Feb 2024
Revised completion8 Aug 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary7 May 2024
Registration fee₹49,000
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors160 · 4 · 11 (units from plan)
ConfigurationUnitsCarpet area
3 BHK16088-88
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower K1 · OTHER, 3 BHK114088-88
Tower K2 · OTHER, 3 BHK114088-88
Tower K3 · OTHER, 3 BHK114088-88
Tower K4 · OTHER, 3 BHK114088-88
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JSR Architects
License CA/94/17216
C-67, Defence Colony, New Delhi.
Engineer
Mr. Paresh Jauhri
20, Central Lane Babar Road , New Delhi-110001
Contractor
NJC Infra Corporation Pvt. Ltd.
Vill- Taskha, Near Maruti Showroom, Rampur UP-244901
Sr.Development work declared to RERA
1Demarcation of Plots
This is single plot curved trapezoide shaped , having total 1 no. of entry gate and 1no. of exit gate from the 18m wide front road, Site is surronded by other plots on one side
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
3Road Work
Concerete Road with bituminous Cover/ High quality concrete pavers will be used as per deisgn suggested by the Architect for internal road.
4Footpaths
All internal roads will have narrow footpath red sand stone pavers or equivalent finishes
5Water Supply Including Drinking Water Facilities
Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
8Parks
There is one green area in front of building, play area for childrens and different recretional activities
9Tree Planting
"There are 5 type of trees povided in site which are kachnar, gulmauhar, amaltas, kusum and neem."
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.
11Community Buildings
Fully centralised AC Club House/community center is provided on the lower ground floor, and some temporary kiosks on the central atrium with sitting area of each building.
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
13Solid Waste Management And Disposal System
There are a proper garbage collection area provided for the solid waste management.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Votaic Panels to provide Renewable source of energy for common areas in building complex.
16Fire Protection And Fire Safety System
Since the building is less than 50m in height all the fire norms shall be followed as NBC and approval of fire department
17Social Infrastructure And Other Public Amenities Including Public Health Services
Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
18Emergency Evacuation Services
Fire Staricase is provided in the central atrium of each building, with fire resistant doors, basements have 1 (one) accesses to exit in case of emergency
19Other Miscellaneous Work
Luxurious entrance lobby with water cascade in each block, convenience store at the entrance gate for day to day small purchasings, lush green shurbs at every vacant space on ground.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

26 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANIL KUMAR VERMAUPRERAAGT14346
4ARVIND KUMARUPRERAAGT15927
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
8CHANDRA PRAKASH SAXENAUPRERAAGT11046
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11MOHAMMAD RASHIDUPRERAAGT15251
12Mukesh kumar SharmaUPRERAAGT11494
13RAM KUMAR YADAVUPRERAAGT13784
14REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
15Rohit ChandaniUPRERAAGT11546
16SANJEEV KUMAR BANKAUPRERAAGT10894
17Saurabh GuptaUPRERAAGT14655
18Shashank ShuklaUPRERAAGT17091
19SHINU GUPTAUPRERAAGT18762
20SINAN REALTY LLPUPRERAAGT11785
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
23VINAY KUMAR SINGHUPRERAAGT11226
24VISHESH SRIVASTAVAUPRERAAGT11416
25VIVEK ARORAUPRERAAGT15945
26VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 8 Dec 2024.

Sanctioned by Any Other Competent Authority · 8,705 sqm of land · an approved plan of 4 blocks and 160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
235/20199 Dec 20198 Dec 20248 Dec 20279 Feb 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 8 Aug 2024.

#Granted fromExtended uptoNote
19 Feb 20248 Aug 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
111P, 112P, 113, 114P and 115P8705Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4156
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4141
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 16425
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · -
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jan 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Jan 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Jan 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Jan 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jan 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jan 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Jan 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Jan 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New7 Feb 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Jan 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Jan 2020 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Corp Ltd.
RolePromoter · current
RERA IDUPRERAPRM4092
PANAADCS9234L
CIN / TANU70100DL1988PLC390006
Name of chairmanMohd. Abdullah Masood
Registered addressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shalimar Corp LtdBankDCB Bank LtdBranchGomti Nagar LucknowA/C no.IFSCDCBL0000108
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Shere Shalimar Mannat Extension

Is Shere Shalimar Mannat Extension RERA registered?

Yes. Shere Shalimar Mannat Extension is registered with UPRERA under registration number UPRERAPRJ243983, registered on 20 Feb 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has Shere Shalimar Mannat Extension been completed?

UPRERA still lists Shere Shalimar Mannat Extension as Registered, so it is not shown as completed here. A completion certificate dated 7 May 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Shere Shalimar Mannat Extension?

M/s Shalimar Corp Ltd. is the promoter entity that filed Shere Shalimar Mannat Extension with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Shere Shalimar Mannat Extension more time to complete?

UPRERA's record carries 1 completion extension for Shere Shalimar Mannat Extension, the latest running to 8 Aug 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Shere Shalimar Mannat Extension have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shere Shalimar Mannat Extension located?

Shere Shalimar Mannat Extension is registered in Barabanki, as filed with UPRERA.

What configurations are available in Shere Shalimar Mannat Extension?

The unit plan filed with UPRERA lists OTHER and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Shere Shalimar Mannat Extension?

The approved unit plan filed with UPRERA runs from 88 to 88 m² of carpet area (about 943 to 950 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Shere Shalimar Mannat Extension?

The approved unit plan describes 4 blocks and 160 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Shere Shalimar Mannat Extension?

About 74 units per acre: 160 planned units across 2.15 acres (8,705 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗