Shri Radha Aqua Gardens is a RERA-registered residential project by Decent Buildwell Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ7477). Registered with a completion deadline of 20 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7477 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Aug 2016 |
| Original start | 1 Aug 2016 |
| Project duration | 125 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | A-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh) |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated (2)
3 building permits sanctioned
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2017 |
| Original completion | 31 Jul 2021 |
| Revised completion | 20 Dec 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 22 Dec 2025 |
| Registration fee | ₹1,06,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK638 66%
- 3 BHK262 27%
- PENTHOUSE39 4%
- SHOP33 3%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 638 | 55-67 |
| 3 BHK | 262 | 80 |
| PENTHOUSE | 39 | 87-119 |
| SHOP | 33 | 4-31 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| CASCADE · 2 BHK, PENTHOUSE, 3 BHK | 22 | 171 | 55-117 |
| COMMERCIAL · SHOP | 2 | 33 | 4-31 |
| FONTANE · 2 BHK, PENTHOUSE, 3 BHK | 24 | 192 | 55-117 |
| LAGOON · 2 BHK, PENTHOUSE, 3 BHK | 24 | 192 | 55-117 |
| NLV · 2 BHK, 3 BHK, PENTHOUSE | 24 | 192 | 55-119 |
| SLV · 2 BHK, 3 BHK, PENTHOUSE | 24 | 192 | 55-119 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Not Applicable |
| 2 | Boundary Wall RCC and Brick Work with wire fencing. |
| 3 | Road Work 6 M Wide Roads with Paved Surface and Paved |
| 4 | Footpaths Landscapeed /paved Pathways |
| 5 | Water Supply Including Drinking Water Facilities Potable water supplied by Municipal Authority stored in underground and overhead tanks provided on top of each tower |
| 6 | Sewer System Sewage system provided with adequate capacity of STP for treatment of effluents |
| 7 | Drain Surface Drainage system provided with provision of harvesting rainwater from building terrace |
| 8 | Parks adequate no. of Parks provided in central landscapped area with shading trees, pathways & Kids play area along with water bodies |
| 9 | Tree Planting Native tree plantation as per gold rated green building standards by IGBC provided in central area as well as periphery of the plot |
| 10 | Design For Electric Supply Including Street Lighting HT & LT Electric supply as per load demand of the complex provided with meter room, Transformers, HT Panel, LT Panel along with adequate DG Sets for power backup |
| 11 | Community Buildings Cetral Club/ Community building provided wth facility for indoor games , Gymnasium and swimming pool etc |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage Treatment plant of adequate capacity provided in basement area for effluents. Water discharged from Plant used for landscaping/horticuture |
| 13 | Solid Waste Management And Disposal System Door to door collection of Solid waste planned along with engagement of specialized agency for disposal of all collected solid waste |
| 14 | Water Conservation System Water conservation measures as per Gold rated Green Building standards proposed such as installation of Irrigation system, Low flow fixtures etc |
| 15 | Energy Management System Including Use of Renewable Energy Renewable energy usage proposed in common area as per Gold rated Green building standards with Solar PV generation or Solar water Heating syatems. |
| 16 | Fire Protection And Fire Safety System Fire Hose Reels, Fire alarm system, Sprinklers, fire Extinguishers provided in each building satisfying all fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Commercil area along with central club provided as social amenties |
| 18 | Emergency Evacuation Services Emergency exits, fire exits provided in each tower at ground floor with adequate signages. |
| 19 | Other Miscellaneous Work Not Applicable |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | PROPCASA CONSULTANCY PVT. LTD. | UPRERAAGT10038 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 21 Dec 2021. 2 of them carry a revalidation, the latest valid to 21 Dec 2026.
Sanctioned by Greater Noida Authority · 20,121 sqm of land · an approved plan of 6 blocks and 972 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Letter No. PLG(BP) 3608/69 Dated 22-12-2016 | 22 Dec 2016 | 21 Dec 2021 | 21 Dec 2026 | 31 Jul 2021 | — | |
| PLG(BP) 3608/69 | 22 Dec 2016 | 21 Dec 2021 | 21 Dec 2026 | 29 Oct 2023 | 22 Dec 2016 valid to 21 Dec 2026 | |
| NIYO/2024/BP-3608/1534 | 22 Dec 2016 | 21 Dec 2021 | 21 Dec 2026 | 29 Oct 2023 | 22 Dec 2016 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 20 Dec 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Jul 2021 | 30 Jan 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jan 2022 | 29 Oct 2023 | — |
| 3 | 29 Oct 2023 | 20 Dec 2026 | — |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-05A, Sector 16B, Greater Noida | 20120.63 | — |
| GH-05A, Sector 16B, Greater Noida | 20121 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 21 Mar 2016.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5864 | 21 Mar 2016 | self | — |
| Lease deed · 5864 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 2 Aug 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 31 Jul 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 31 Jul 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 31 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | As per NBC Norms |
| Fire safety (as filed with RERA) | As per NBC Norms |
| Health service | As per NBC Norms |
| Renewable energy | As per Sanctioned Plan |
| Other facilities | As per Sanctioned Plan |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 54% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 61% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 73% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 84% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 88% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 105% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 107% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Decent Buildwell Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM14449 |
| PAN | AAECD4761A |
| CIN / TAN | U70102UP2012PTC053213 |
| Name of chairman | Suresh Chand Kaushik |
| Registered address | A-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh) |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Decent Buildwell Pvt. Ltd.BankICICI BankBranchSector 63, NoidaA/C no.IFSCICIC0000816 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q1 — engineer certificate | - → https://www.up-rera.in/ViewDocument?Param=PRJ747724092026120550026EC.pdf changed in Estanzo’s record | 25 Sept 2026 |
| Quarterly progress report 2026-Q1 — architect certificate | - → https://www.up-rera.in/ViewDocument?Param=PRJ747724092026120406872AC.pdf changed in Estanzo’s record | 25 Sept 2026 |
| Quarterly progress report 2025-Q4 — engineer certificate | - → https://www.up-rera.in/ViewDocument?Param=PRJ747724092026120139385EC.pdf changed in Estanzo’s record | 25 Sept 2026 |
| Quarterly progress report 2025-Q4 — architect certificate | - → https://www.up-rera.in/ViewDocument?Param=PRJ747724092026120051160AC.pdf changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 131 (Under Registration - 0 ) → 132 (Under Registration - 0 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 1 Sept 2026 |
Common questions about Shri Radha Aqua Gardens
Is Shri Radha Aqua Gardens RERA registered?
Yes. Shri Radha Aqua Gardens is registered with UPRERA under registration number UPRERAPRJ7477, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Shri Radha Aqua Gardens been completed?
UPRERA still lists Shri Radha Aqua Gardens as Registered, so it is not shown as completed here. A completion certificate dated 22 Dec 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Shri Radha Aqua Gardens?
Decent Buildwell Pvt. Ltd. is the promoter entity that filed Shri Radha Aqua Gardens with UPRERA (promoter RERA ID UPRERAPRM14449). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Shri Radha Aqua Gardens more time to complete?
UPRERA's record carries 3 completion extensions for Shri Radha Aqua Gardens, the latest running to 20 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Shri Radha Aqua Gardens have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Shri Radha Aqua Gardens located?
Shri Radha Aqua Gardens is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Shri Radha Aqua Gardens?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK, PENTHOUSE and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Shri Radha Aqua Gardens?
The approved unit plan filed with UPRERA runs from 4 to 119 m² of carpet area (about 42 to 1,283 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Shri Radha Aqua Gardens?
The approved unit plan describes 6 blocks and 972 units of which 939 are homes and 33 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Shri Radha Aqua Gardens?
About 195 units per acre: 972 planned units across 4.97 acres (20,121 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗