SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) is a RERA-registered residential project by SJP Infracon Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ12851). Registered with a completion deadline of 8 Sept 2029.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ12851 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Nov 2017 |
| Project duration | 143 months |
| Address | GH-05, Sector-16B, Greater Noida West, Gautam Budh Nagar, U.P., Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | A-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh) |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
4 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Permit revalidated (3)
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 18 Sept 2017 |
| Original completion | 12 Feb 2023 |
| Revised completion | 8 Sept 2029 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,63,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK1,533 73%
- 3 BHK295 14%
- 1 BHK244 12%
- SHOP32 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 244 | 32-43 |
| 2 BHK | 1,533 | 48-56 |
| 3 BHK | 295 | 60 |
| SHOP | 32 | 4-35 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A1 · 1 BHK, 2 BHK, 3 BHK | 30 | 233 | 39-60 |
| A2 · 1 BHK, 2 BHK, 3 BHK | 30 | 239 | 39-60 |
| A3 · 1 BHK, 2 BHK, 3 BHK | 30 | 236 | 39-60 |
| A4 · 1 BHK | 28 | 224 | 32-39 |
| A5 · 1 BHK, 2 BHK, 3 BHK | 28 | 274 | 39-60 |
| A6 · 1 BHK, 2 BHK, 3 BHK | 28 | 274 | 39-60 |
| A7 · 2 BHK, 3 BHK | 31 | 296 | 48-60 |
| A8 · 2 BHK, 3 BHK | 31 | 296 | 48-60 |
| COMMERCIAL · SHOP | 1 | 32 | 4-35 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Not Applicable |
| 2 | Boundary Wall RCC and Brick Work with wire fencing. |
| 3 | Road Work 6 M Wide Roads with Paved Surface and Paved |
| 4 | Footpaths Landscapeed /paved Pathways |
| 5 | Water Supply Including Drinking Water Facilities Potable water supplied by Municipal Authority stored in underground and overhead tanks provided on top of each tower |
| 6 | Sewer System Sewage system provided with adequate capacity of STP for treatment of effluents |
| 7 | Drain Surface Drainage system provided with provision of harvesting rainwater from building terrace |
| 8 | Parks adequate no. of Parks provided in central landscapped area with shading trees, pathways & Kids play area along with water bodies |
| 9 | Tree Planting Native tree plantation as per gold rated green building standards by IGBC provided in central area as well as periphery of the plot |
| 10 | Design For Electric Supply Including Street Lighting HT & LT Electric supply as per load demand of the complex provided with meter room, Transformers, HT Panel, LT Panel along with adequate DG Sets for power backup |
| 11 | Community Buildings Cetral Club/ Community building provided wth facility for indoor games , Gymnasium and swimming pool etc |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage Treatment plant of adequate capacity provided in basement area for effluents. Water discharged from Plant used for landscaping/horticuture |
| 13 | Solid Waste Management And Disposal System Door to door collection of Solid waste planned along with engagement of specialized agency for disposal of all collected solid waste |
| 14 | Water Conservation System Water conservation measures as per Gold rated Green Building standards proposed such as installation of Irrigation system, Low flow fixtures etc |
| 15 | Energy Management System Including Use of Renewable Energy Renewable energy usage proposed in common area as per Gold rated Green building standards with Solar PV generation or Solar water Heating syatems. |
| 16 | Fire Protection And Fire Safety System Fire Hose Reels, Fire alarm system, Sprinklers, fire Extinguishers provided in each building satisfying all fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Commercil area along with central club, primary school, dispensary, milk booth provided as social amenties |
| 18 | Emergency Evacuation Services Emergency exits, fire exits provided in each tower at ground floor with adequate signages. |
| 19 | Other Miscellaneous Work Not Applicable |
Registered agents
10 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 3 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 4 | Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt Ltd | UPRERAAGT10906 |
| 5 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 6 | INVEST MANGO | UPRERAAGT12212 |
| 7 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 8 | PROPCASA CONSULTANCY PVT. LTD. | UPRERAAGT10038 |
| 9 | Reckon Projects Pvt.Ltd. | UPRERAAGT10043 |
| 10 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 20 Aug 2022. 3 of them carry a revalidation, the latest valid to 20 Aug 2027.
Sanctioned by Greater Noida Authority · 31,592 sqm of land · an approved plan of 9 blocks and 2104 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Approved By letter No. PLG/BP/2555/5350 Dated 21-08-2017 | 21 Aug 2017 | 20 Aug 2022 | 20 Aug 2025 | 12 Feb 2023 | — | |
| Approved By letter No. PLG/BP/2555/5350 Dated 21-08-2017 | 21 Aug 2017 | 20 Aug 2022 | 8 Sept 2034 | 11 Aug 2023 | 9 Sept 2024 valid to 20 Aug 2027 as 1424 dated 9/9/2024 | |
| Approved By letter No. PLG/BP/2555/5350 Dated 21-08-2017 | 21 Aug 2017 | 20 Aug 2022 | 20 Aug 2027 | 11 Aug 2023 | 9 Sept 2024 valid to 20 Aug 2027 as 1194 | |
| Approved By letter No. PLG/BP/2555/5350 Dated 21-08-2017 | 21 Aug 2017 | 20 Aug 2022 | 8 Sept 2029 | 11 Aug 2023 | 9 Sept 2024 valid to 20 Aug 2027 as 1194 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 8 Sept 2029.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 12 Feb 2023 | 11 Aug 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 11 Aug 2023 | 8 Sept 2029 | — |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-05 Sector 16B, Greater Noida | 88074.90 | — |
| GH 05, Sector 16B, Greater Noida | 88075 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 16 Nov 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 23383 | 16 Nov 2010 | self | — |
| Lease deed · 23383 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 23383 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · 23383 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 15 Sept 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 15 Sept 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 15 Sept 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Sept 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 15 Sept 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Proposed As per NBC |
| Fire safety (as filed with RERA) | Proposed As per NBC |
| Health service | Proposed As per NBC |
| Renewable energy | As per approved Drawings |
| Other facilities | As per approved Drawings |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | 11.18% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | 12.5% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | 12.88% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | 12.92% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 13.77% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 13.84% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 13.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 13.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 13.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 13.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 13.98% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 13.98% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 13.99% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 11.06% | CA ↗ |
| 2025-Q2 | 11.06% | CA ↗ |
| 2025-Q3 | 11.06% | CA ↗ |
| 2025-Q4 | 8.48% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 9.13% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SJP Infracon Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM14486 |
| PAN | AAOCS6480K |
| CIN / TAN | U70102UP2010PLC041520 |
| Name of chairman | Suresh Chand Kaushik |
| Registered address | A-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh) |
| RERA contact | |
| Registered since | 2017 |
| Legal name | HAWELIA REALTORS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | FF-18, First Floor, Valencia Square, GH-07B, Sector-1, Greater Noida West, Gautam Budh Nagar, U.P. 201318 |
| RERA contact |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SJP Infracon Ltd.BankHDFC BankBranchSector 63 NoidaA/C no.IFSCHDFC0000394 |
What has changed on this record
10 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 447 (Under Registration - 3 ) → 447 (Under Registration - 1 ) changed in Estanzo’s record | 29 Sept 2026 |
| Quarterly progress report 2026-Q1 | QPR 2026-Q1 newly filed with RERA | 25 Sept 2026 |
| Quarterly progress report 2025-Q4 | QPR 2025-Q4 newly filed with RERA | 25 Sept 2026 |
| Quarterly progress report 2025-Q3 | QPR 2025-Q3 newly filed with RERA | 25 Sept 2026 |
| Quarterly progress report 2025-Q2 | QPR 2025-Q2 newly filed with RERA | 25 Sept 2026 |
| Quarterly progress report 2025-Q1 | QPR 2025-Q1 newly filed with RERA | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 447 (Under Registration - 4 ) → 447 (Under Registration - 3 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 447 (Under Registration - 5 ) → 447 (Under Registration - 4 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 446 (Under Registration - 4 ) → 447 (Under Registration - 5 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 446 (Under Registration - 8 ) → 446 (Under Registration - 4 ) changed in Estanzo’s record | 10 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 29 Sept 2026 · 5 movements on record |
Common questions about SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)
Is SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) RERA registered?
Yes. SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) is registered with UPRERA under registration number UPRERAPRJ12851, registered on 18 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
The completion date filed with UPRERA is 8 Sept 2029. No completion certificate is on record yet.
Who is the builder of SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
SJP Infracon Limited is the promoter entity that filed SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) with UPRERA (promoter RERA ID UPRERAPRM14486). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) more time to complete?
UPRERA's record carries 2 completion extensions for SHRI RADHA SKY PARK (SKY GARDENS PHASE-2), the latest running to 8 Sept 2029. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) located?
SHRI RADHA SKY PARK (SKY GARDENS PHASE-2) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
The unit plan filed with UPRERA lists 1 BHK, 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
The approved unit plan filed with UPRERA runs from 4 to 60 m² of carpet area (about 43 to 642 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
The approved unit plan describes 9 blocks and 2,104 units of which 2,072 are homes and 32 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SHRI RADHA SKY PARK (SKY GARDENS PHASE-2)?
About 270 units per acre: 2,104 planned units across 7.81 acres (31,592 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗