SHUBHKAMNA RESIDENCY

UPRERARegistered

SHUBHKAMNA RESIDENCY is a RERA-registered residential project by GDAC BUILDCON in Varanasi (RERA ID UPRERAPRJ524627). Registered with a completion deadline of 2 Nov 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
83.24%Q3'25
89.35%Q4'25
92.42%Q1'26
94.27%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ524627
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start4 Nov 2021
Project duration60 months
AddressPindra **, Varanasi
TehsilPindra **
Applicant typePartnership firm
Applicant addressS 8/108, B-3-A Prashantpuri Colony, DIG Colony, M.A. Road Varanasi-221002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    05

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Feb 2022
Original completion2 Nov 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹20,000
Sanctioning authorityVaranasi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors80 · 1 · 8 (units from plan)
  • 2 BHK56 70%
  • 3 BHK24 30%
ConfigurationUnitsCarpet area
2 BHK5654-72
3 BHK2478-85
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SHUBHKAMNA RESIDENCY · 2 BHK, 3 BHK88054-85
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PRADEEP KUMAR GUPTA
License CA/2009/44932
S8/108 B3A PRASHANTPURI, DIG COLONY , M.A. ROAD VARANASI-221002
Engineer
RAJAN KUMAR SINGH
DLF MARKET , FARIDABAD
Contractor
MANOJ KUMAR CHAUHAN
160, DANIYALPUR , PISAUR, SHIVPUR, VARANASI-221003
Sr.Development work declared to RERA
1Demarcation of Plots
This is roughly rectangular shape plot , having total 1 no of entry and exit gate from the front road side . Plot is already well demarcated and all the development and construction work will be done under the demarcated plot as per layout plan.
2Boundary Wall
There is 7 feet height of boundary wall is proposed . After completing the building boundary wall will be constructed. Brick work in wall and rcc work in column and beam may be used as per design .
3Road Work
All internal roads will have concrete pavers or equivalent finish . After constructing the building road will be constructed as per sanctioned plan.
4Footpaths
Footpath in thick concrete pavers or equivalent finish .
5Water Supply Including Drinking Water Facilities
Water supply will be provided threw borewell to Over Head Water Tank than it will be distributed to each flats and common amenities.
6Sewer System
Centralized Sewerage system shall be provided .
7Drain
Water from road and other landscape are shall be connected to the water drain channel and go to the Rain water harvesting pit for recharge the ground water .
8Parks
There is no park & green area is proposed as per sanctioned plan.
9Tree Planting
There is several provision of tree planting as per approved plan.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local Electricity Board and consider centralized transformer, HT panel, LT panel, feeder, Pillar and DG Backup for common services like external lighting etc..
11Community Buildings
Not applicable as per sanctioned plan .
12Treatment and Disposal System of Sewage and Sullage water
Centralized sewerage system shall be provided .
13Solid Waste Management And Disposal System
There is proper garbage collection area provided .
14Water Conservation System
Rain water harvesting system shall be provided for the whole building complex to conserve water .
15Energy Management System Including Use of Renewable Energy
We will use LED lights as well as solar lights in external areas.all equipment shall have energy efficient motors .
16Fire Protection And Fire Safety System
Since building is less than 50 meter in heights , so all the fire norms shall be followed as per NBC and approval of fire department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not applicable as per approved plan .
18Emergency Evacuation Services
The staircase will be provide with emergency exit doors in each floors
19Other Miscellaneous Work
Luxurious entrance lobby shall be provided as per specification .
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 2 Nov 2026.

Sanctioned by Varanasi Development Authority · 2,915 sqm of land · an approved plan of 1 block and 80 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
053 Nov 20212 Nov 20262 Nov 20292 Nov 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
106/3 , 106/4 , 106/6148.70Plot
105/4 , 106/3, 106/4, 106/62945Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · NA
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 4665/2021
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7540/2021
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Jan 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Jan 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Jan 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Jan 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New26 Jan 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New25 Jan 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Jan 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New25 Jan 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Jan 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New22 Nov 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New28 Jan 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 Jan 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New28 Jan 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Jan 2022 ↗

Quarterly progress reports

19 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

19 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2026-Q1.

QuarterConstructionCertificates
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q283.24%CA ↗ · Arch ↗ · Eng ↗
2025-Q389.35%CA ↗ · Arch ↗ · Eng ↗
2025-Q492.42%CA ↗ · Arch ↗ · Eng ↗
2026-Q194.27%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGDAC BUILDCON
RolePromoter · current
RERA IDUPRERAPRM156318
PANAAWFG0433B
CIN / TANALDG16423B
Registered addressS 8/108, B-3-A Prashantpuri Colony, DIG Colony, M.A. Road Varanasi-221002
RERA contact
Registered since2021
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameAMIT KUMAR SINGH
RoleCo-promoter · current
RERA IDUPRERAPRM30169
Applicant typeIndividual
PANBBKPS8269R
Registered address158/30/1 KAZIPUR, NAINI, ALLAHABAD PIN. 211008
RERA contact
Registered since2017
Legal nameBALKRISHNA NARAYAN SINGH
RoleCo-promoter
Applicant typeIndividual
AddressS/O Lalji, Harahua,Ramsinghpur, Varanasi, Uttar Pradesh-221105
RERA contact
Legal nameDEVKRISHNA NARAYAN SINGH
RoleCo-promoter
Applicant typeIndividual
AddressS/O Lalji, Harahua,Ramsinghpur, Varanasi, Uttar Pradesh-221105
RERA contact
Legal nameSURENDRA NARAYAN SINGH
RoleCo-promoter
Applicant typeIndividual
AddressRamsinghpur, Pargana Harahua, Varanasi, Uttar Pradesh-221105
RERA contact

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
GDAC BUILDCON COLLECTION ACCOUNT FOR SHUBHKAMNA RESIDENCYBankSTATE BANK OF INDIABranchSPL COMMERCIAL BRANCH VARANASIBranch addressSBI MAIN BRANCH CAMPUS OPPOSIT KACHAHARI VARANASIBranch districtVaranasiA/C no.IFSCSBIN0009252
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
GDAC BUILDCON SEPARATE ACCOUNT FOR SHUBHKAMNA RESIDENCYBankSTATE BANK OF INDIABranchSPL COMMERCIAL BRANCH VARANASIBranch addressSBI MAIN BRANCH CAMPUS OPPOSIT KACHAHRI VARANASIBranch districtVaranasiA/C no.IFSCSBIN0009252
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
GDAC BUILDCON TRANSACTION ACCOUNT FOR SHUBHKAMNA RESIDENCYBankSTATE BANK OF INDIABranchSPL COMMERCIAL BRANCH VARANASIBranch addressSBI MAIN BRANCH CAMPUS OPPOSIT KACHAHARI VARANASIBranch districtVaranasiA/C no.IFSCSBIN0009252
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SHUBHKAMNA RESIDENCY

Is SHUBHKAMNA RESIDENCY RERA registered?

Yes. SHUBHKAMNA RESIDENCY is registered with UPRERA under registration number UPRERAPRJ524627, registered on 11 Feb 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SHUBHKAMNA RESIDENCY?

The completion date filed with UPRERA is 2 Nov 2026. No completion certificate is on record yet.

Who is the builder of SHUBHKAMNA RESIDENCY?

GDAC BUILDCON is the promoter entity that filed SHUBHKAMNA RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM156318). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SHUBHKAMNA RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SHUBHKAMNA RESIDENCY located?

SHUBHKAMNA RESIDENCY is registered in Varanasi, as filed with UPRERA.

What configurations are available in SHUBHKAMNA RESIDENCY?

The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SHUBHKAMNA RESIDENCY?

The approved unit plan filed with UPRERA runs from 54 to 85 m² of carpet area (about 582 to 916 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SHUBHKAMNA RESIDENCY?

The approved unit plan describes 1 block and 80 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SHUBHKAMNA RESIDENCY?

About 111 units per acre: 80 planned units across 0.72 acres (2,915 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗