UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING

UPRERARegistered

UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in SECTOR-1, WAVE CITY, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ997859). Registered with a completion deadline of 9 Feb 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
22.81%Q3'24
22.81%Q4'24
22.81%Q1'25
22.81%Q2'25
22.81%Q3'25
22.81%Q4'25
22.81%Q1'26
26.52%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ997859
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Mar 2024
Project duration60 months
AddressPLOT NO. GH-02, SECTOR-1, WAVE CITY,,NH-24, GHAZIABAD, SECTOR-1, WAVE CITY, GHAZIABAD, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    LIG Housing/05696/GDA/BP/23-24/0620/29092023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Feb 2026
Original completion9 Feb 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,01,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,160 · 6 · 15 (units from plan)
ConfigurationUnitsCarpet area
OTHER2,16033-41
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EWS TOWER-1 · OTHER1536033
EWS TOWER-2 · OTHER1536033
EWS TOWER-3 · OTHER1536033
LIG TOWER-1 · OTHER1536041
LIG TOWER-2 · OTHER1536041
LIG TOWER-3 · OTHER1536041
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NIRAJ KUMAR NANDA
License CA/2009/46122
C-1, SECTOR-3, NOIDA,U.P-201301
Engineer
Subhankar Petal
C-1, SECTOR-3, NOIDA, U.P-201301
Contractor
Y. N CONSTRUCTION CO.
VILLAGE LAKHNAWALI, SURAJPUR, GREATOR NOIDA, U.P-201206
Sr.Development work declared to RERA
1Demarcation of Plots
Plots demarcated as per Approved layout.
2Boundary Wall
Boundary wall shall be made with standard fly ash and MS Grill with thickness of 230 mm and height 1.8m
3Road Work
The road shall be made with standard 150 GSB+ 100WMM+ 65 mm interlocking tiles over the sand bed
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
the water supply system planned to provide 24X7 water supply. HDPE pipe PN-6, PE-80 for water supply network,. 640 KL UGT and 310 KL OHT 1 tube- wells
6Sewer System
RCC pipe class NP2 has been used manholes/Chambers made with Bricks Masonry in conical shape ring from dia 900 to 1500 mm
7Drain
RCC Pipe class NP2 has been used Manholes/chambers made with Brick masonry in conical shape with dia 90mm
8Parks
Park as per design
9Tree Planting
tree along with boundary
10Design For Electric Supply Including Street Lighting
Trn. 3 nos 1600 KVA 6m GI pole with Single/Double arm bracket street light poles with 75 watt LED Fixture. meter panel board
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
1000 KLD STP is planned within the premise.
13Solid Waste Management And Disposal System
NA
14Water Conservation System
Rain water harvesting pits in green areas of the proposed development
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Fire stair case and FHC, is planned at each floor as per NBC requirement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Fire stair case Planned as per NBC requirement
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Amit BidhuriUPRERAAGT17591
2DIMENSIONS REALTYUPRERAAGT25635
3Mitresh SharmaUPRERAAGT14496
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 18 Feb 2029.

Sanctioned by Ghaziabad Development Authority · 39,153 sqm of land · an approved plan of 6 blocks and 2160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
LIG Housing/05696/GDA/BP/23-24/0620/290920239 Feb 202418 Feb 202917 Feb 20319 Feb 2029
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2076350.7Khasra
2081534.8Khasra
2092660Khasra
210360Khasra
211110Khasra
214752Khasra
21514045.9Khasra
2293160Khasra
230220Khasra
2319329.3Khasra
232/545630Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 542230
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · P174003
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · K124365
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · AT780411
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Lease deed · P201233
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 286947
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 286952
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3533/11
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · A447790
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · P201233
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 4332
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 171/13
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · A123699
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 287102
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 367883
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1949
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1247
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4045
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · P201233
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1420-1425
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Dec 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New20 Dec 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New20 Dec 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New20 Dec 2025 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New20 Dec 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jan 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jan 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jan 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jan 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Dec 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Dec 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Dec 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Jan 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New5 Jan 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New5 Jan 2026 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.

QuarterConstructionCertificates
2023-Q422.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q122.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q222.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q322.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q422.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q122.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q222.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q322.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q422.81%CA ↗ · Arch ↗ · Eng ↗
2026-Q126.52%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUppal Chadha Hi-Tech Developers Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM5538
PANAAACU7200M
CIN / TANU45201DL2004PTC128784
Registered addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. UCHDPL COLLECTION ACCOUNT FOR SAMRIDDHI HOMES EWS LIG GROUP HOUSINGBankICICI BANKBranchICICI BANK -RAJNAGAR, GHAZIABADBranch addressR-1/88, RDC, RAJNAGAR, GHAZIABAD,U.P-201002Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0006286Branch emailgbnoida@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. UCHDPL SEPARATE BANK ACCOUNT FOR SAMRIDDHI HOMES EWS LIG GROUP HOUSINGBankICICI BANKBranchICICI BANK-RAJNAGAR, GHAZIABADBranch addressR-1/88,RDC,RAJNAGAR , GHAZIABAD, U.P-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0006286
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. UCHDPL RERA TRANSACTION ACCOUNT FOR SAMRIDDHI HOMES EWS LIG GROUP HOUSINGBankICICI BANKBranchICICI BANK-RAJNAGAR, GHAZIABADBranch addressR-1/88,RDC, RAJ NAGAR, GHAZIABAD, U.P-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0006286
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING

Is UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING RERA registered?

Yes. UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING is registered with UPRERA under registration number UPRERAPRJ997859, registered on 27 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

The completion date filed with UPRERA is 9 Feb 2029. No completion certificate is on record yet.

Who is the builder of UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING located?

UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING is registered in SECTOR-1, WAVE CITY, GHAZIABAD, Ghaziabad, as filed with UPRERA.

What configurations are available in UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

The approved unit plan filed with UPRERA runs from 33 to 41 m² of carpet area (about 356 to 436 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

The approved unit plan describes 6 blocks and 2,160 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is UCHDPL-SAMRIDDHI HOMES EWS LIG GROUP HOUSING?

About 223 units per acre: 2,160 planned units across 9.67 acres (39,153 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗