Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ612919
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Sept 2020
Project duration48 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP- 20191205162324697

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Oct 2020
Original completion31 Aug 2023
Revised completion30 Aug 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary7 May 2024
Registration fee₹2,53,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors83 · 83 · 4 (units from plan)
ConfigurationUnitsCarpet area
OTHER8372-280
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER41158
2 · OTHER41158
3 · OTHER41158
4 · OTHER41158
5 · OTHER41158
6 · OTHER41158
7 · OTHER41129
8 · OTHER41129
9 · OTHER41129
10 · OTHER41129
11 · OTHER41129
12 · OTHER41129
14 · OTHER41158
15 · OTHER41158
16 · OTHER41158
17 · OTHER41158
18 · OTHER41158
19 · OTHER41158
20 · OTHER31264
21 · OTHER31264
22 · OTHER31264
23 · OTHER31264
24 · OTHER41129
25 · OTHER41129
26 · OTHER41129
27 · OTHER41129
28 · OTHER41129
29 · OTHER41129
30 · OTHER41129
31 · OTHER31280
32 · OTHER3175
33 · OTHER3172
34 · OTHER3172
35 · OTHER3172
36 · OTHER3172
37 · OTHER3172
38 · OTHER3172
39 · OTHER3172
40 · OTHER3172
41 · OTHER3172
42 · OTHER3172
43 · OTHER3172
44 · OTHER3172
45 · OTHER3172
46 · OTHER3175
47 · OTHER3172
48 · OTHER3172
49 · OTHER3172
50 · OTHER3172
51 · OTHER3172
52 · OTHER3172
53 · OTHER3172
54 · OTHER3172
55 · OTHER3172
56 · OTHER3172
57 · OTHER3172
58 · OTHER3172
59 · OTHER3172
60 · OTHER3172
61 · OTHER3172
62 · OTHER3175
63 · OTHER3172
64 · OTHER3172
65 · OTHER3172
66 · OTHER3172
67 · OTHER3172
68 · OTHER3172
69 · OTHER3172
70 · OTHER3172
71 · OTHER3172
72 · OTHER3172
73 · OTHER3172
74 · OTHER3172
75 · OTHER3172
76 · OTHER3175
77 · OTHER3172
78 · OTHER3172
79 · OTHER3172
80 · OTHER3172
81 · OTHER3172
82 · OTHER3172
83 · OTHER3172
84 · OTHER3199
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Architect Hafeez Contractor
License CA/2010/50126
Sonawala Building, Horniman Circle, G Vaidya Rd, Fort, Mumbai, Maharashtra 400023
Engineer
Ms. Rucha Watve
"Sai Radhe, Office No 201, 2nd floor 100 Kennedy Road, Behind Hotel Sheraton Grand,regista Pune 411001"
Contractor
M/s. Prabha Enterprises
182-C Eldico Udhyan, Bangla Bazar, Dilkusha Garden, Lucknow-226002
Sr.Development work declared to RERA
1Demarcation of Plots
This is single plot polygon shaped , having total 1 no. of entry gate and 1no. of exit gate from the 30m wide front road and plot is beside 45mtr wide road. Site is surronded by other plots of developers from three sides and one side by Baghamau village.
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.
3Road Work
Trimix finish/ bitumen will be used as per deisgn suggested by the Architect for internal road.
4Footpaths
All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.
5Water Supply Including Drinking Water Facilities
Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. After treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
8Parks
There are many green/ ladscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.
9Tree Planting
There are different type of tree plantation is proposed at site in order to maintain greenary and natural view.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc.
11Community Buildings
NA (Community building already exist in township.)
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement, after treatement ,water shall be recycled and it will be used in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
13Solid Waste Management And Disposal System
There are proper garbage collection area provided for the solid waste management.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
16Fire Protection And Fire Safety System
All the fire norms shall be followed as NBC and approval of fire department
17Social Infrastructure And Other Public Amenities Including Public Health Services
Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
Lush green shurbs at every vacant space on ground.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

26 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANIL KUMAR VERMAUPRERAAGT14346
4ARVIND KUMARUPRERAAGT15927
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
8CHANDRA PRAKASH SAXENAUPRERAAGT11046
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11MOHAMMAD RASHIDUPRERAAGT15251
12Mukesh kumar SharmaUPRERAAGT11494
13RAM KUMAR YADAVUPRERAAGT13784
14REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
15Rohit ChandaniUPRERAAGT11546
16SANJEEV KUMAR BANKAUPRERAAGT10894
17Saurabh GuptaUPRERAAGT14655
18Shashank ShuklaUPRERAAGT17091
19SHINU GUPTAUPRERAAGT18762
20SINAN REALTY LLPUPRERAAGT11785
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
23VINAY KUMAR SINGHUPRERAAGT11226
24VISHESH SRIVASTAVAUPRERAAGT11416
25VIVEK ARORAUPRERAAGT15945
26VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Dec 2024.

Sanctioned by Lucknow Development Authority · 49,642 sqm of land · an approved plan of 83 blocks and 83 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP- 2019120516232469711 Dec 201910 Dec 202410 Dec 202731 Aug 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Aug 2024.

#Granted fromExtended uptoNote
131 Aug 202330 Aug 2024—

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Part of Integrated Township "Shalimar One World", Village- Baghamau, Gomti Nagar Vistar, Sector-6, Lucknow (G.H-17)49642Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · Reply against notice received
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Reply against objections received dated 16.10.2020
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Annexure-1_ Approved layout along with demarcated map
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Annexure-2_Demarcated Khasra Plan
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 5396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 7344
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8785
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 4251
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9652
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 17453
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13828
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12534
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 4798
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 6510
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New19 Aug 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New4 Sept 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New20 Aug 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Sept 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New19 Aug 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New19 Aug 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New19 Aug 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Aug 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Sept 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Sept 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Sept 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Sept 2020 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ANS Developers Private LimitedBankHDFC BankBranchVibhuti Khand Gomtinagar, LucknowA/C no.IFSCHDFC0004805
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Valencia County

Is Valencia County RERA registered?

Yes. Valencia County is registered with UPRERA under registration number UPRERAPRJ612919, registered on 21 Oct 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has Valencia County been completed?

UPRERA still lists Valencia County as Registered, so it is not shown as completed here. A completion certificate dated 7 May 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Valencia County?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Valencia County with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Valencia County more time to complete?

UPRERA's record carries 1 completion extension for Valencia County, the latest running to 30 Aug 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Valencia County have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Valencia County located?

Valencia County is registered in Lucknow, as filed with UPRERA.

What configurations are available in Valencia County?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Valencia County?

The approved unit plan filed with UPRERA runs from 72 to 280 m² of carpet area (about 777 to 3,019 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Valencia County?

The approved unit plan describes 83 blocks and 83 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Valencia County?

About 7 units per acre: 83 planned units across 12.27 acres (49,642 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗