VEWE STREET

UPRERARegistered

VEWE STREET is a RERA-registered commercial project by welcome vertex infra private limited in SHAHPUR BHAMETA, Ghaziabad (RERA ID UPRERAPRJ409337). Registered with a completion deadline of 20 Nov 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
0%Q3'24
—Q4'24
—Q1'25
18%Q2'25
20.76%Q3'25
23%Q4'25
24.5%Q1'26
31%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ409337
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Feb 2024
Project duration46 months
AddressPLOT 4,5,16 TO 27 , COMMERCIAL 8 H BLOCK JAIPURIA SUNRISE GREENS NH-24, SHAHPUR BHAMETA, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressD-29 , Basement , Gulmohar Park -I , Delhi , South Delhi
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    GDA LD 22 23 0946

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Aug 2024
Original completion20 Nov 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹63,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors126 · 14 · 4 (units from plan)
Homes · commercial units0 · 126 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP12653-76
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK 1 · SHOP4953-76
BLOCK 10 · SHOP4953-76
BLOCK 11 · SHOP4953-76
BLOCK 12 · SHOP4953-76
BLOCK 13 · SHOP4953-76
BLOCK 14 · SHOP4953-76
BLOCK 2 · SHOP4953-76
BLOCK 3 · SHOP4953-76
BLOCK 4 · SHOP4953-76
BLOCK 5 · SHOP4953-76
BLOCK 6 · SHOP4953-76
BLOCK 7 · SHOP4953-76
BLOCK 8 · SHOP4953-76
BLOCK 9 · SHOP4953-76
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SYED AZHAR HUSSAIN
License CA/2011/54056
A-33, FLAT NO.-101, FIRST FLOOR, ABUL FAZAL ENCLAVE PART-2, SHAHEEN BAGH, NEW DELHI-110025
Engineer
PAWAN SHARMA
DESIGN SPACE, P10-07, SEC-75, FIRST FLOOR, FARIDABAD
Contractor
GOLD STAR REALTORS LTD.
5 PUSA ROAD NEW DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation is as per the approved plan of the commercial complex
2Boundary Wall
No boundary wall shall be applicable .
3Road Work
12m road shall be made either with stone paving or non motorable material for the shops .
4Footpaths
Shall be made with hardscaping material like stone or paver
5Water Supply Including Drinking Water Facilities
Water supply shall be provided through water tank.
6Sewer System
Under ground system using uPVC (SN-IV) Sewer pipes.
7Drain
Underground system using uPVC (SN-IV) pipes.
8Parks
Not applicable to the project.
9Tree Planting
Trees shall be planted as per the Bylaws of Ghaziabad Development Authority (GDA).
10Design For Electric Supply Including Street Lighting
Transformers (Compact sub-station) shall be used along-with necessary switch-gear for distributing electricity at LT voltage.
11Community Buildings
Community building shall be provided as per the Bylaws of Ghaziabad Development Authority (GDA).
12Treatment and Disposal System of Sewage and Sullage water
STP of adequate capacity shall be provided. Treated water would be used for flushing, cleaning, irrigation and etc. The excess water would be discharge in the municipal sewer.
13Solid Waste Management And Disposal System
It would be provided as per the actual requirement at the project site.
14Water Conservation System
Rain water harvesting services shall be provided at the project site and the treated sewage water should be recycled till extend feasible.
15Energy Management System Including Use of Renewable Energy
Solar panels hall be provided on terrace for renewable energy. Single point metering would be provided for purchasing energy from the Grid/UP-PCL
16Fire Protection And Fire Safety System
Fire tender path shall be provided as per NBC fire fighting system along-with pumps and water storage tanks shall be provided as per NBC and NOC from fire department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Public toilets would be provided at project site for visitors and general public.
18Emergency Evacuation Services
Fire scape stair case shall be provided in the project.
19Other Miscellaneous Work
It shall be carried out as per the requirement at the project site.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Pranjal SharmaUPRERAAGT22165
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 20 Nov 2027. 1 of them carries a revalidation, valid to 20 Nov 2027.

Sanctioned by Ghaziabad Development Authority · 5,234 sqm of land · an approved plan of 14 blocks and 126 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
plotted development/03878/GDA/LD/22-23/0946/0610202221 Nov 202220 Nov 202719 Nov 203020 Nov 2027—
GDA LD 22 23 094621 Nov 202220 Nov 202719 Nov 203020 Nov 202721 Nov 2022
valid to 20 Nov 2027
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

25 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1520537.80Khasra
1521893.95Khasra
1522650.80Khasra
1523512.95Khasra
1538243.95Khasra
1539243.95Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1520
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1521
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1522
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1523
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1537
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1538
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2344
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Consortium Agreement Jild 815
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · Joint Development Agreement Jild 1954
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Sale deed · 8594
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Feb 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 Feb 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New7 Feb 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Jan 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Jan 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jan 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Jan 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Jan 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Jun 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New7 Feb 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New7 Feb 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New7 Feb 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New7 Feb 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New2 Jan 2024 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.

QuarterConstructionCertificates
2023-Q40%CA ↗ · Arch ↗ · Eng ↗
2024-Q10%CA ↗ · Arch ↗ · Eng ↗
2024-Q20%CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q118%CA ↗ · Arch ↗ · Eng ↗
2025-Q220.76%CA ↗ · Arch ↗ · Eng ↗
2025-Q323%CA ↗ · Arch ↗ · Eng ↗
2025-Q424.5%CA ↗ · Arch ↗ · Eng ↗
2026-Q131%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namewelcome vertex infra private limited
RolePromoter · current
RERA IDUPRERAPRM269899
PANAADCW3591N
CIN / TANDELW06362G
Name of chairmanRAJKUMAR RAMRAKHIYANI
Registered addressD-29 , Basement , Gulmohar Park -I , Delhi , South Delhi
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSMV AGENCIES PVT LTD
RoleCo-promoter · current
RERA IDUPRERAPRM8150
Applicant typeCompany
PANAAACS3405J
CIN / TANU74899DL1994PTC062671
Name of chairmanMr. Vaibhav Jaipuria
Registered addressS-25 GREEN PARK MAIN MARKET NEW DELHI-110016
RERA contact
Registered since2017
Legal nameEXPONENT CONBUILD PVT. LTD
RoleCo-promoter
Applicant typeCompany
AddressKD-81, Kohat Main Road, Pitampura New Delhi West Delhi DL 110034 IN
RERA contact
Legal nameSURYA VAIBHAV DEVELOPERS PVT LTD
RoleCo-promoter
Applicant typeCompany
AddressS25 GREEN PARK NEW DELHI 110016
RERA contact
Legal nameRISK FREE TRADERS PVT LTD
RoleCo-promoter
Applicant typeCompany
AddressS25 GREENPARK MAIN MARKET DELHI 110016
RERA contact
Legal nameJAIPURIA ADVANCE TECHONOLOGY PVT LTD
RoleCo-promoter
Applicant typeCompany
AddressS25 GREEN PARK MAIN MARKET DELHI 110016
RERA contact
Legal nameGLORY STAR DUROBUILD PVT LTD
RoleCo-promoter
Applicant typeCompany
AddressS25 GREEN PARK MAIN MARKET NEW DELHI 16
RERA contact

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
WELCOME VERTEX INFRA PVT LTD COLLECTION ACOUNT FOR VEWE STREETBankAXIS BANKBranchAXIS BANK, AHINSA KHAND 2, INDRAPURAMBranch addressPLOT NO.7, GROUND FLOOR, GC CENTRUM, MALLROAD, AHINSA KHAND 2, INDRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0003356Branch emailpno@axisbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
WELCOME VERTEX INFRA PVT LTD SEPARATE ACCOUNT FOR VEWE STREETBankAXIS BANKBranchAXIS BANK, AHINSA KHAND 2, INDRAPURAMBranch addressAXIS BANK, PLOT NO.7, GROUND FLOOR, GC CENTRUM, MALL ROAD, AHINSA KHAND 2, INDRAPURAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0003356
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
WELCOME VERTEX INFRA PVT LTD TRANSACTION ACCOUNT FOR VEWE STREETBankAXIS BANKBranchAXIS BANK, AHINSA KHAND-2, INDRAPURAMBranch addressAXIS BANK, PLOT NO.7, GROUND FLOOR, GC CENTRUM, MALL ROAD, AHINSA KHAND-2, INDRAPURAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCUTIB0003356
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)3 (Under Registration - 1 ) → 3 (Under Registration - 0 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)3 (Under Registration - 3 ) → 3 (Under Registration - 1 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)1 (Under Registration - 1 ) → 3 (Under Registration - 3 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)0 (Under Registration - 0 ) → 1 (Under Registration - 1 )
changed in Estanzo’s record
15 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 7 Oct 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about VEWE STREET

Is VEWE STREET RERA registered?

Yes. VEWE STREET is registered with UPRERA under registration number UPRERAPRJ409337, registered on 2 Aug 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for VEWE STREET?

The completion date filed with UPRERA is 20 Nov 2027. No completion certificate is on record yet.

Who is the builder of VEWE STREET?

welcome vertex infra private limited is the promoter entity that filed VEWE STREET with UPRERA (promoter RERA ID UPRERAPRM269899). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does VEWE STREET have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is VEWE STREET located?

VEWE STREET is registered in SHAHPUR BHAMETA, Ghaziabad, as filed with UPRERA.

What configurations are available in VEWE STREET?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in VEWE STREET?

The approved unit plan filed with UPRERA runs from 53 to 76 m² of carpet area (about 573 to 821 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in VEWE STREET?

The approved unit plan describes 14 blocks and 126 units of which 0 are homes and 126 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is VEWE STREET?

About 97 units per acre: 126 planned units across 1.29 acres (5,234 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗