APEX SKY HEIGHT

UPRERARegistered

APEX SKY HEIGHT is a RERA-registered residential project by VALUE INFRATECH INDIA PRIVATE LIMITED in Khata No. 389,235, Khasra No. 1101 and 1099, Village Morta, Parana Jolallabd, Ghaziabad (RERA ID UPRERAPRJ200463). Registered with a completion deadline of 5 Feb 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ200463
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start20 Feb 2026
Project duration60 months
AddressValue Infratech India Pvt. Ltd.Khata No. 389,235 Khasra No. 1101 and 1099, Village Morta, Parana Jolallabd Tehsil DIST Ghaziabad, Khata No. 389,235, Khasra No. 1101 and 1099, Village Morta, Parana Jolallabd, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressPlot No. J3/1 Block B1 Ground Floor, Mohan Co-Operative Industrial Estate, Mathura Road, South Delhi-110044
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/09988/GDA/BP/25-26/0101/16122025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Apr 2026
Original completion5 Feb 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹74,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors637 · 4 · 31 (units from plan)
Homes · commercial units624 · 13 (shops and offices filed in the same plan)
  • 3 BHK456 72%
  • 2 BHK168 26%
  • SHOP13 2%
ConfigurationUnitsCarpet area
2 BHK16861-61
3 BHK45680-102
SHOP13188-209
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · OTHER, 2 BHK, 3 BHK, SHOP3116261-209
TOWER B · OTHER, 2 BHK, 3 BHK, SHOP3116361-209
TOWER C · OTHER, 2 BHK, 3 BHK3115661-102
TOWER D · OTHER, 2 BHK, 3 BHK3115661-102
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANDLEYS ASSOCIATES PVT. LTD.
License CA/99/24860
C-39, HOUSING SOCIETY, SOUTH EXTENSION, PART-1, NEW DELHI-110049
Engineer
ABL STRUCTURE CONSULTANT PVT. LTD.
D-5/203,CHINTPIRNI HOUSE, PRASHANT VIHAR D-BLOCK DELHI-110085
Contractor
ABL STRUCTURE CONSULTANT PVT.LTD SATISH SHARMA
D-5/203, CHINTPURNIHOUSE, PRASHANT VIHAR D-BLOCK DELHI-110085
Sr.Development work declared to RERA
1Demarcation of Plots
THE PROJECT LAND WILL BE DEMARKCATED TO THE EXACT SHAPE, SIZE AND ORIENTATION AS PER SANCTION MAP BY GHAZIBAD DEVELOPMENT AUTHORITY.
2Boundary Wall
6 FEET HAIG CAHIN LINK FENCING OF MS TUBE AND MS ANGLES OF SIZE 40X 40 MM AND GREEN HEDGE ON OUTER BOUNDARY DEEP FOUNDATION. THE WALL WILL BE PLASTER AND PAINTED CLADDING AS PER AESTHETICS.
3Road Work
6..0 M WIDE TRIMIX FINISH ROAD OF M 30 GRADE CONCRETE FOR CARRYING FIRE TENDER LOAD WITH SAUCER DRAIN FOR RAIN WATER COLLECTION, WITH 3 Mtr. OFFSET FROM BUILDING LINE LAID WITH GRASS CELL/PAVER TO CARRY FIRE TENDER LOAD.
4Footpaths
1 METER WIDE FOOTPATH FOR PEDESTRIAN MOVEMENT FINISHED WITH PAVER BLOCKS OF M-30 GRADE CONCRETE OF 50 MM THICKNESS.
5Water Supply Including Drinking Water Facilities
INSTALLING WATER TREATMENT PLANT FOR THE DOMESTIC SUPPLY AND STP FOR RECYCLING THE WATER WILL BE RECYCLED FOR FLUSHING AND GRADEN IRRRIGATION.
6Sewer System
INSTALLING OF STP OF CAPACITY 160X 2 KLD OF SBR TECHNOLOGY CONNECTED THROUGH UPVC,PP AND SN 8 PIPING SYSTEM.
7Drain
SAUCER DRAIN FOR EXTERNAL DEVELOPMENT PURPOSE AND RCC DRAIN IS DEVELOPING IN BASEMENT OF SIZE 300 MM WIDE. VERTICAL STACK WOULD BE OF UPVC,PP, AND SN 8 PIPE.
8Parks
GREEN AREA ,KIDS PLAY AREA, WALKING TRACK ,COMMUNITY GARDEN.
9Tree Planting
NEEM, GULMOHAR BIG TREE ALONG THE PLOT BOUNDARY AND MEDIUM HEIGHT TREES LIKE CHAMPA, FICUS RETUSA , FICUS LYRATA, SHRUSS OF FICUS GROUNF COVER THE PARK WILL HAVE FOOTPATH, SITTING AERA.
10Design For Electric Supply Including Street Lighting
ELECTRICAL SUPPLY LOAD OF 3000 KVA PROVIDING BY INSTALLATION OF 100 KVA-2 TRANSFORMERS, 400 KVA OF 1 TRANSFORMER . FULL LOAD BACKUP THROUGH DG.
11Community Buildings
CLUB HOUSE, KIDS PLAY ZONE.
12Treatment and Disposal System of Sewage and Sullage water
WE ARE INSTALLING STP OF STP OF 2 X 160 KLD WHICH WILL CATER ALL UNITS AND RECYCLED WATER TO BE USED FOR FLUSHING AND IRRIGATION.
13Solid Waste Management And Disposal System
WE ARE INSTALLING STP OF 2 X 160 KLD WHICH WILL CATER ALL UNITS AND RECYCLED WATER TO BE USED FOR FLUSHING AND IRRIGATION.
14Water Conservation System
7 RAIN WATER HARVESTING PIT HAVE BEEN PROVISIONED FOR WATER CONSERVATION SYSTEM AND USING STP TO RECYCLE THE WATER.
15Energy Management System Including Use of Renewable Energy
SOLAR WATER HEATER FOR KITCHEN, SOLAR LIGHT FOR COMMON AREA.
16Fire Protection And Fire Safety System
HYDRANT AND SPRIN SYSTEM SYSTEM FOR COMPLETE BUILDING INCLUDING APPARTMENT. FAS SYSTEM IS BEING USED
17Social Infrastructure And Other Public Amenities Including Public Health Services
WALKING TRACK
18Emergency Evacuation Services
FIRE LIFT, FIRE STAIRCASE WITH 2 HOURS PROTECTION OF FIRE DOOR INCLUDING THE FIRE DOOR ON EMERGENCY SERVICE AND EMERGENCY ESCAPE SIGNAGES.
19Other Miscellaneous Work
AS PER APPROVED PLAN.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1PROPSHOPUPRERAAGT10129
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 Feb 2031.

Sanctioned by Ghaziabad Development Authority · 13,867 sqm of land · an approved plan of 4 blocks and 637 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/09988/GDA/BP/25-26/0101/161220256 Feb 20265 Feb 20314 Feb 20345 Feb 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
109912270Khasra
11013400Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · TAKE OVER TO NCLAT AOA
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · TAKE OVER TO NCLAT MOA
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · NCLAT ORDER
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · REGISTRY 1101 SALE DEED
The registered deed by which the promoter bought the land.
PDF ↗
Allotment letter from the authority · POSSESSION OF LAND
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · LIST OF DIRECTOR
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · NO DUES
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · MINUTES OF MEETING MONITORING COMMITTEE
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · LIST OF SHARE HOLDER
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · SALE DEED PAGE NO 1TO 100 JILD NO. 5947
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · SALE DEED 101 TO 200 PAGE JILD NO.5947
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · SALE DEED 200 TO 285 PAGE JILD NO 5947 KHASRA NO 1099
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · RESOLUTION PLAN
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · ADENDUM TO RESOLUTION PLAN SUBMITTED
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1 JULY 2022 TO 30 JUNE 2028
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1 JULY 2022 TO 30 JUNE 2028
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · PAYMENT GAZIABAD TEHSEELDAAR
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · PAYMENT TAHSEELDAR
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · AFFIDAVIT NO DUES
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · PROOF OF PAYMENT
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New18 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Mar 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Feb 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Mar 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New17 Mar 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Mar 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New17 Mar 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New17 Mar 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Feb 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Mar 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Feb 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Feb 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.

QuarterConstructionCertificates
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameVALUE INFRATECH INDIA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM445845
PANAADCV3962G
CIN / TANDELV26537A
Name of chairmanSANDEEP BATRA
Registered addressPlot No. J3/1 Block B1 Ground Floor, Mohan Co-Operative Industrial Estate, Mathura Road, South Delhi-110044
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
VALUE INFRATECH INDIA PVT.LTD. COLLECTION ACCOUNT APEX SKY HEIGHTBankICICI BANKBranchICICI BANK LTD. HALL NO.4 PART A, GAUR GLOBAL VILLAGE, CROSSING REBUBLIC DUNDAHERA, DISTRICT GHAZIABAD U.P. 201009Branch addressICICI BANK LTD. HALL NO. 4 PART AGAUR GLOBAL VILLAGE, CROSSING REPUBLIC, DUNDAHERA, DISTRICT GHAZIABAD, U.P. 201009Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0003254Branch emailved.abhishek@icici.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
VALUE INFRATECH INDIA PVT. LTD. SEPARATE BANK ACCOUNT APEX SKY HEIGHTBankICICI BANKBranchICICI BANK LTD. HALL NO. 4 PART A, GAUR GLOBAL VILLAGE, CROSSING REPUBLIC, DUNDAHERA, DISTRICT GHAZIABAD U.P.201009Branch addressICICI BANK LTD. HALL NO. 4, PART A, GAUR GLOBAL VILLAGE, CROSSING REPUBLIC, DUNDAHERA, DISTRICT GHAZIABAD, U.P.201009Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0003254
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
VALUE INFRATECH INDIA PVT. LTD. RERA TRANSACTION ACCOUNT APEX SKY HEIGHTBankICICI BANK LTD.BranchICICI BANK LTD. HALL NO.4, PART A GAUR GLOBAL VILLAGE, CROSSING REPUBLIC, DUNDAHERA, DISTRICT GHAZIABAD, U.P.-201009Branch addressICICI BANK LTD. HALL NO.4, PART A GAUR GLOBAL VILLAGE, CROSSING REPUBLIC ,DUNDAHERA, DISTRICT GHAZIABAD, U.P.-201009Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICICOOO3254
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1 (Under Registration - 1 ) → 1 (Under Registration - 0 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)0 (Under Registration - 0 ) → 1 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about APEX SKY HEIGHT

Is APEX SKY HEIGHT RERA registered?

Yes. APEX SKY HEIGHT is registered with UPRERA under registration number UPRERAPRJ200463, registered on 21 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for APEX SKY HEIGHT?

The completion date filed with UPRERA is 5 Feb 2031. No completion certificate is on record yet.

Who is the builder of APEX SKY HEIGHT?

VALUE INFRATECH INDIA PRIVATE LIMITED is the promoter entity that filed APEX SKY HEIGHT with UPRERA (promoter RERA ID UPRERAPRM445845). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does APEX SKY HEIGHT have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is APEX SKY HEIGHT located?

APEX SKY HEIGHT is registered in Khata No. 389,235, Khasra No. 1101 and 1099, Village Morta, Parana Jolallabd, Ghaziabad, as filed with UPRERA.

What configurations are available in APEX SKY HEIGHT?

The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in APEX SKY HEIGHT?

The approved unit plan filed with UPRERA runs from 61 to 209 m² of carpet area (about 657 to 2,250 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in APEX SKY HEIGHT?

The approved unit plan describes 4 blocks and 637 units of which 624 are homes and 13 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is APEX SKY HEIGHT?

About 186 units per acre: 637 planned units across 3.43 acres (13,867 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗