APNA GHAR

UPRERARegistered

APNA GHAR is a RERA-registered residential project by SAIIANSH BUILDCON PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ15627). Registered with a completion deadline of 30 Sept 2020.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ15627
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Jul 2017
Project duration39 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant addressB-2, FLAT NO- 5/4, ALISHA APARTMENT, MMM MARG, LUCKNOW, UTTAR PRADESH -226001, INDIA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    839

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Apr 2018
Original completion30 Jun 2019
Revised completion30 Sept 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹6,630
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors48 · 2 · 4 (units from plan)
ConfigurationUnitsCarpet area
2 BHK4846
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 2 BHK42446
TOWER B · 2 BHK42446
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
THE AMBIANCE ARCHITECT & INTERIOR DESIGNER
License CA/1985/9332
161, BASEMENT, LEKHRAJ MARKET-3, A BLOCK, INDIRA NAGAR, LUCKNOW
Engineer
OMKAR VERMA
8/14, SEC-8, INDIRA NAGAR, FAIZABAD ROAD, LUCKNOW, UTTAR PRADESH
Contractor
ATUL MISHRA
GOMTI NAGAR
Sr.Development work declared to RERA
1Demarcation of Plots
Not applicable
2Boundary Wall
constructed
3Road Work
will be constructed
4Footpaths
will be constructed
5Water Supply Including Drinking Water Facilities
terace pump and overhead water tank and 24 hours water supply
6Sewer System
facility will be available
7Drain
facility will be available
8Parks
na
9Tree Planting
will be planted
10Design For Electric Supply Including Street Lighting
facility will be available
11Community Buildings
na
12Treatment and Disposal System of Sewage and Sullage water
facility will be available
13Solid Waste Management And Disposal System
facility will be available
14Water Conservation System
facility will be available
15Energy Management System Including Use of Renewable Energy
rain water harvesting system in the project
16Fire Protection And Fire Safety System
fire extinguisher will be available
17Social Infrastructure And Other Public Amenities Including Public Health Services
basic facilities shall be provided
18Emergency Evacuation Services
stair case, seperate exit and entry will be provided
19Other Miscellaneous Work
cctv will be provided, power back-up shall be provided
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2019.

Sanctioned by Any Other Competent Authority · 663 sqm of land · an approved plan of 2 blocks and 48 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
83913 Apr 201530 Jun 201930 Jun 201931 Mar 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Sept 2020.

#Granted fromExtended uptoNote
130 Jun 201931 Mar 2020—
231 Mar 202030 Sept 2020Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1842, 1843663—
1842, 1843668.9Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 15 Mar 2014.

Registry no.DateTypeArea
429515 Mar 2014self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4295
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4295
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4295
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Apr 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old11 Apr 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterOVERHEAD WATER TANK
Fire safety (as filed with RERA)FIRE EXTINGUISHER, TERRACE PUMP, OVERHEAD WATER TANK
Health serviceNECESSARY FACILITIES MADE AVAILABLE
Renewable energyRAIN WATER HARVESTING SYSTEM
Other facilitiesCCTV CAMERA, POWER BACKUP, 24 HRS WATER SUPPLY, SEPARATE ENTRY & EXIT FOR SECURITY PURPOSE

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAIIANSH BUILDCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM41458
PANAAVCS0581J
CIN / TANU70102UP2014PTC066674
Name of chairman1) Sharad Bakshi 2) Samata Singh
Registered addressB-2, FLAT NO- 5/4, ALISHA APARTMENT, MMM MARG, LUCKNOW, UTTAR PRADESH -226001, INDIA
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SAIIANSH BUILDCON PRIVATE LIMITEDBankINDUSIND BANKBranchHAZRATGANJA/C no.IFSCINDB0000019
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about APNA GHAR

Is APNA GHAR RERA registered?

Yes. APNA GHAR is registered with UPRERA under registration number UPRERAPRJ15627, registered on 11 Apr 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for APNA GHAR?

The completion date filed with UPRERA is 30 Sept 2020. No completion certificate is on record yet.

Who is the builder of APNA GHAR?

SAIIANSH BUILDCON PRIVATE LIMITED is the promoter entity that filed APNA GHAR with UPRERA (promoter RERA ID UPRERAPRM41458). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted APNA GHAR more time to complete?

UPRERA's record carries 2 completion extensions for APNA GHAR, the latest running to 30 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does APNA GHAR have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is APNA GHAR located?

APNA GHAR is registered in Lucknow, as filed with UPRERA.

What configurations are available in APNA GHAR?

The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in APNA GHAR?

The approved unit plan describes 2 blocks and 48 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is APNA GHAR?

About 293 units per acre: 48 planned units across 0.16 acres (663 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗