Aura Chimera

UPRERAAbeyanceRERA data as of 9 Sept 2026

Aura Chimera is a RERA-registered residential project by Shouryashubham Infrastructures Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ5530). RERA status: Abeyance. Data as reported by UP-RERA.

RERA status as reported: Abeyance.
Project cost
182
Land area
38,400 9.49 acres
Units (from plan)
998
Density (derived)
105 /acre
Towers (from plan)
13
Config
1 BHK/2 BHK/3 BHK/SHOP/OTHER
Carpet
8-79
Registered
8 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5530
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start10 Jul 2014
Original start2 Jul 2007
Project duration78 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Coordinates28.704535, 77.431104
Applicant typeCompany
Applicant addressB-111, Sec-5, Noida-201301
Applicant contact

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered8 Aug 2017
Promised completion9 Jul 2020
Revised completion8 Jan 2021
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,97,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors998 · 13 · 13 (units from plan)
Homes · commercial units926 · 72 (shops and offices filed in the same plan)
  • 2 BHK716 72%
  • 3 BHK144 14%
  • SHOP72 7%
  • OTHER56 6%
  • 1 BHK10 1%
ConfigurationUnitsCarpet area
2 BHK71657-69
1 BHK1037-41
3 BHK14479
SHOP728-28
OTHER569-25
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, 1 BHK64837-58
C · 2 BHK118858
Commercial · SHOP, 2 BHK, 1 BHK, OTHER31428-69
D · 2 BHK118858
E · 3 BHK97279
F · 3 BHK97279
G · 2 BHK97265
H · 2 BHK97265
I · 2 BHK108065
J · 2 BHK97258
K · 2 BHK86465
L · 2 BHK86465
M · 2 BHK86465
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
Space Designers
Engineer
VD Sharma
B-24, Sec-67, Noida
Contractor
Pancy Constructions Private Limited
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation Done By Total Station
2Boundary Wall
Permanent Boundary With Gated Permises
3Road Work
R.C.C. All Around
4Footpaths
R.C.C.
5Water Supply Including Drinking Water Facilities
Municipal Corporation/ Ground Water
6Sewer System
STP will be installed for the treatment of sludge
7Drain
As Per Drawing
8Parks
As Per Drawing
9Tree Planting
As Per Guided by Authority
10Design For Electric Supply Including Street Lighting
As Per Guided by Authority
11Community Buildings
As Per Drawing
12Treatment and Disposal System of Sewage and Sullage water
As Per Guided by authority, STP will be provided
13Solid Waste Management And Disposal System
As Per Drawing
14Water Conservation System
As Per Drawing
15Energy Management System Including Use of Renewable Energy
As Per Drawing
16Fire Protection And Fire Safety System
As Per Guided by Authority
17Social Infrastructure And Other Public Amenities Including Public Health Services
As Per Drawing
18Emergency Evacuation Services
As Per Drawing
19Other Miscellaneous Work
As Per Drawing
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

0 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

Sanctioned by Ghaziabad Development Authority · 38,400 sqm of land · an approved plan of 13 blocks and 998 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 8 Jan 2021.

#Granted fromExtended uptoNote
19 Jul 20208 Jan 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

4 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1134Noor Nagar
113438400Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 9 Feb 2007.

Registry no.DateTypeArea
10829 Feb 2007self
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1082
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Document checklist
DocumentStatusUploaded
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old26 Apr 2018

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterGDA/CGWA
Fire safety (as filed with RERA)As Per Drawing

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameShouryashubham Infrastructures Pvt. Ltd.
Roleprimary · current
RERA IDUPRERAPRM8689
PANAAFCA7337Q
CIN / TANU70104DL2006PTC149038
Name of chairmanShri Anil Jain Shri Ankur Jain
Registered addressB-111, Sec-5, Noida-201301
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shouryashubham Infrastructures Pvt. Ltd.BankSouth Indian Bank LimitedBranchSec-27, NoidaA/C no.IFSCSIBL0000430
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Aura Chimera

Is Aura Chimera RERA registered?

Yes. Aura Chimera is registered with UPRERA under registration number UPRERAPRJ5530, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Aura Chimera?

The completion date filed with UPRERA is 8 Jan 2021. No completion certificate is on record yet.

Who is the builder of Aura Chimera?

Shouryashubham Infrastructures Pvt. Ltd. is the promoter entity that filed Aura Chimera with UPRERA (promoter RERA ID UPRERAPRM8689). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Aura Chimera more time to complete?

UPRERA's record carries 1 completion extension for Aura Chimera, the latest running to 8 Jan 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Aura Chimera have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Aura Chimera located?

Aura Chimera is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Aura Chimera?

The unit plan filed with UPRERA lists 2 BHK, 1 BHK, 3 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Aura Chimera?

The approved unit plan filed with UPRERA runs from 8 to 79 m² of carpet area (about 82 to 847 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Aura Chimera?

The approved unit plan describes 13 blocks and 998 units of which 926 are homes and 72 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Aura Chimera?

About 105 units per acre: 998 planned units across 9.49 acres (38,400 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA. official source ↗