COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY is a RERA-registered commercial project by Bareilly Development Authority in SECTOR-5, Bareilly (RERA ID UPRERAPRJ560862). Registered with a completion deadline of 31 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ560862 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Jan 2025 |
| Project duration | 24 months |
| Address | RAMGANGA NAGAR SCHEME SECTOR-5, SECTOR-5, Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Competent authority |
| Applicant address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
B.D.A./RGN SECTOR-5 COMMERCIAL COMPLEX (BLOCK-C)
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Jan 2025 |
| Original completion | 31 Dec 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹46,000 |
| Sanctioning authority | Bareily Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER22 85%
- SHOP4 15%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 4 | 35 |
| OTHER | 22 | 35-72 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-C · SHOP, OTHER | 2 | 26 | 35-72 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NA |
| 2 | Boundary Wall NA |
| 3 | Road Work NA |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities Domestic Pipe Line 63 mm Dia Length- ,160mm Dia Length-125 mts, 10cm Dia Length- 150 mts |
| 6 | Sewer System 250 mm dia R.C.C. Sewer Line Length 75.0 mts,15 cm Dia Length 160 mts |
| 7 | Drain NA |
| 8 | Parks NA |
| 9 | Tree Planting Proposed |
| 10 | Design For Electric Supply Including Street Lighting NA |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Proposed To Connect With porosed STP at Ranganga Nagar Capacity 12.5 MLD |
| 13 | Solid Waste Management And Disposal System Provision of Garbage Collection at three Poins Made |
| 14 | Water Conservation System Rain Water Harvesing Is provided |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work 20Cm Thick RCC Trimix Parking Area and back Side Area -1900 Sqm |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 24 Oct 2029.
Sanctioned by Bareily Development Authority · 3,536 sqm of land · an approved plan of 1 block and 26 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| B.D.A./RGN SECTOR-5 COMMERCIAL COMPLEX (BLOCK-C) | 25 Oct 2024 | 24 Oct 2029 | 24 Oct 2032 | 31 Dec 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 913, 914, 933 | 3535.73 | Khasra |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Dec 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 2 Dec 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Dec 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 2 Dec 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Jan 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Dec 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Dec 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 2 Dec 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Dec 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 12 Dec 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 12 Dec 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Dec 2024 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 56.87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 90.86% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 91.89% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 91.96% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Bareilly Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18199 |
| PAN | AAALB0169K |
| CIN / TAN | LKNB05448C |
| Registered address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | BDA COLLECTION ACCOUNT FOR SECTOR-5 COMMERCIAL COMPLEX BLOCK-CBankAXIS BANKBranchCIVIL LINES BAREILLYBranch address148, CIVIL LINES, BAREILLY, U.P. PIN CODE-243001Branch districtBareillyA/C no.IFSCUTIB0000205Branch emailbareilly.branchhead@axisbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | BDA SEPARATE ACCOUNT FOR SECTOR-5 COMMERCIAL COMPLEX BLOCK-CBankAXIS BANKBranchCIVIL LINES, BAREILLYBranch address148, CIVIL LINES, BAREILLY. U.P. PIN CODE-243001Branch districtBareilly, Uttar PradeshA/C no.IFSCUTIB0000205 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | BDA TRANSACTION ACCOUNT FOR SECTOR-5 COMMERCIAL COMPLEX BLOCK-CBankAXIS BANKBranchCIVIL LINES, BAREILLYBranch address148, CIVIL LINES, BAREILLY, U.P. PIN CODE-243001Branch districtBareilly, Uttar PradeshA/C no.IFSCUTIB0000205 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY
Is COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY RERA registered?
Yes. COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY is registered with UPRERA under registration number UPRERAPRJ560862, registered on 25 Jan 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
The completion date filed with UPRERA is 31 Dec 2026. No completion certificate is on record yet.
Who is the builder of COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
Bareilly Development Authority is the promoter entity that filed COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY with UPRERA (promoter RERA ID UPRERAPRM18199). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY located?
COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY is registered in SECTOR-5, Bareilly, as filed with UPRERA.
What configurations are available in COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
The approved unit plan filed with UPRERA runs from 35 to 72 m² of carpet area (about 380 to 775 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
The approved unit plan describes 1 block and 26 units of which 22 are homes and 4 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is COMMERCIAL COMPLEX (BLOCK-C) AT SECTOR-5 RAMGANGA NAGAR SCHEME BAREILLY?
About 30 units per acre: 26 planned units across 0.87 acres (3,536 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗