Eldeco Akaar-Sakaar at Eldeco Imperia

UPRERARegistered

Eldeco Akaar-Sakaar at Eldeco Imperia is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Jaitikhera (RERA ID UPRERAPRJ481588). Registered with a completion deadline of 24 Sept 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
0%Q3'25
24.32%Q4'25
29.72%Q1'26
31.42%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ481588
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Industrial Development Authority
Proposed start1 Aug 2024
Project duration50 months
AddressEldeco imperia, Village Jaitikhera, Pargana Bijnaur, Tehsil Sarojini Nagar, UPSIDA area, Lucknow, Jaitikhera, undefined
Tehsilundefined
Applicant typeCompany
Applicant addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    609

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Aug 2024
Original completion24 Sept 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹13,500
Sanctioning authorityLucknow Industrial Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors40 · 2 · 4 (units from plan)
  • STUDIO20 50%
  • 1 BHK20 50%
ConfigurationUnitsCarpet area
STUDIO2020
1 BHK2031
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Akaar(EWS) · OTHER, STUDIO42020
Sakaar(LIG) · 1 BHK42031
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sanjay Kumar Gupta
License CA/1989/12382
Eldeco Corporate Chamber-I, Vibhuti Khand Gomti Nagar,Lucknow
Engineer
Akhilesh Kumar Singh
D-27,Indira Nagar,Lucknow
Contractor
MS Bajrang Infra Engineering Projects Pvt. Ltd.- Mr.Jitendra Kumar
Plot no-21,Hanumantpuram-II,Sitapur road,Faizullaganj,Lucknow-226020
Sr.Development work declared to RERA
1Demarcation of Plots
Plot is part of a developed colony with a clear demarcation.
2Boundary Wall
Two sides of the plot already has boundary . Other two sides to have 2.00 mt high boundary. Boundary shall be combination of 0.23 X0.23 mt. RCC pilars of 3.5 mt. C/C with .23 mt thick brick fillar wall. RCC pillars shall have RCC footing with RCC tie beam of size 0.23X 0.35 mt. at DPC level
3Road Work
3.60 mt wide CC road with 1.2 mt. wide brick on edge pathways on both the sides.CC road shall have 80 mm PCC base over 180 mm WBM laid over rammed earth
4Footpaths
1.20 mt. wide with bricks on edge on both sides of C.C. road laid over 80 mm PCC over rammed earth.
5Water Supply Including Drinking Water Facilities
Under ground water to be supplied through Terrace tanks. Terrace tanks of required capacity shall be filled using 40 mm GI pipe pumped from a UGT.
6Sewer System
150/200 mm. dia C.C. pipes laid over rammed earth/PCC shall collect soil water. The collected soil water to connect to the main sewer line of the township leading to STP
7Drain
K.C. drains of size 280x125 to be placed along the road to be constructed.
8Parks
Marked green patches to be developed with Grass and 0.6 to 0.8 mt high shrubs along the edge of the park.
9Tree Planting
3.5 to 45 mt high trees along internal road on one side at 5 mt. center to center.
10Design For Electric Supply Including Street Lighting
7.00 mt. high electric poles in 8 no, of ISI standard make.
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
Connected to central STP of the township.
13Solid Waste Management And Disposal System
TO be coordinated with the local municipal office.
14Water Conservation System
One no. Rainwater harvesting recharge pit of 2.5 mt. dia has been proposed.
15Energy Management System Including Use of Renewable Energy
50 percent street lights to have solar back-up.
16Fire Protection And Fire Safety System
Provision of down 100 mm comer and fire extinguishers are proposed . 5000 liter shall remain reserved for fire fighting in terrace tank
17Social Infrastructure And Other Public Amenities Including Public Health Services
Available nearby.
18Emergency Evacuation Services
All exits are as per approved norms and width. Minimum 6.0 mt. clearance on all the external roads.
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

67 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ABHINAV KHAREUPRERAAGT14915
3Abhishek KumarUPRERAAGT17780
4AMIT AGARWALUPRERAAGT11945
5AMIT GULATIUPRERAAGT12150
6ANAROCK Property Consultants Private LimitedUPRERAAGT10265
7ANIL KUMAR VERMAUPRERAAGT14346
8ARJUN SINGH YADAVUPRERAAGT11879
9ARTI TIWARIUPRERAAGT14234
10ASHUTOSH GUPTAUPRERAAGT20401
11Asit Gupta C/O Dwelling HomesUPRERAAGT20902
12Bhan Pratap Singh C/o Pratap AssociatesUPRERAAGT16163
13BIPIN CHANDRA PANTUPRERAAGT13687
14BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
15Deewakar Pratap RoyUPRERAAGT17890
16DEVENDRA VERMAUPRERAAGT14290
17Gagan TondonUPRERAAGT14217
18GOLDEN ESTATEUPRERAAGT10397
19GOLDEN STAR REAL ESTATESUPRERAAGT10303
20HARPREET KAURUPRERAAGT10411
21Hitesh KesarwaniUPRERAAGT11538
22Housenotch Private LimitedUPRERAAGT22132
23INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
24KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
25KRISHNA MURARIUPRERAAGT15726
26Kuldeep SinghUPRERAAGT15052
27Md Imran AhmadUPRERAAGT24845
28Mohd Atif AliUPRERAAGT17360
29Mr. Janardan AgarwalUPRERAAGT10555
30Mukesh kumar SharmaUPRERAAGT11494
31Navneet Kumar SrivastavaUPRERAAGT10019
32OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
33Pankaj MittalUPRERAAGT13523
34PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
35Prem Prakash KhareUPRERAAGT13677
36Propertypistol Realty Pvt LtdUPRERAAGT12730
37Rajni DawraUPRERAAGT13519
38RAKESH DEWANUPRERAAGT15661
39RANVEER SINGH YADAVUPRERAAGT12623
40REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD)UPRERAAGT18286
41REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
42REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
43RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
44Resicom Forever Private LimitedUPRERAAGT21912
45Sakshi GuptaUPRERAAGT16025
46SANJEEV KUMAR BANKAUPRERAAGT10894
47SDR INFRA BUILD PVT LTDUPRERAAGT11062
48SHAH MOHSIN KAMALUPRERAAGT14208
49SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
50Smart InfraReality Private LimitedUPRERAAGT10057
51SMC Real Estate Advisors Private LimitedUPRERAAGT10113
52STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
53SUNIL KUMAR PRAJAPATIUPRERAAGT12499
54TARUN PREET SINGH SAHNIUPRERAAGT12537
55Tushar ChandaniUPRERAAGT12001
56Unnisis Infrratech Private LimitedUPRERAAGT15300
57VAAP ESTATE PRIVATE LIMITEDUPRERAAGT23033
58Vajrakaya Buildwell Private LimitedUPRERAAGT12913
59VANDANA AGARWALUPRERAAGT13353
60Varun Properties Inc.UPRERAAGT11985
61Vikas SinghUPRERAAGT11446
62Vikram singhUPRERAAGT10860
63VIMLESH PRATAP SINGHUPRERAAGT11674
64VIRENDRA KUMAR DEWANUPRERAAGT13205
65vishal srivastavaUPRERAAGT11982
66VISHESH SRIVASTAVAUPRERAAGT11416
67VIVEK SHARMAUPRERAAGT22609
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 24 Sept 2028.

Sanctioned by Lucknow Industrial Development Authority · 1,695 sqm of land · an approved plan of 2 blocks and 40 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
60925 Sept 202324 Sept 202823 Sept 203124 Sept 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
301755Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 9891
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 29
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · na
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Aug 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New16 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New16 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Jul 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New16 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New16 Jul 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New16 Jul 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New16 Jul 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New16 Jul 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Jul 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New3 Jul 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New13 Aug 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Jul 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q2.

QuarterConstructionCertificates
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q324.32%CA ↗ · Arch ↗ · Eng ↗
2025-Q429.72%CA ↗ · Arch ↗ · Eng ↗
2026-Q131.42%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameELDECO Housing and Industries Ltd.
RolePromoter · current
RERA IDUPRERAPRM21
PANAAACE4554G
CIN / TANL45202UP1985PLC099376
Name of chairmanMr Pankaj Bajaj
Registered addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameNEPTUNE INFRACON PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressEldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010
RERA contact

Nearby projects

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
EHIL-COLLECTION ACCOUNT FOR ELDECO AKAAR-SAKAAR AT ELDECO IMPERIABankICICI BANKBranchINDIRA NAGARBranch address19/753,RING ROAD,INDIRA NAGAR,LUCKNOWBranch districtLucknowA/C no.IFSCICIC0000591Branch emailaman.ajit@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
EHIL-RERA SEPARATE ACCOUNT FOR ELDECO AKAAR-SAKAAR AT ELDECO IMPERIABankICICI BANKBranchINDRIA NAGAR,LUCKNOWBranch address19/753,RING ROAD,INDIRA NAGAR,LUCKNOW-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
EHIL-TRANSACTION ACCOUNT FOR ELDECO AKAAR-SAKAAR AT ELDECO IMPERIABankICICI BANKBranchINDIRA NAGAR,LUCKNOWBranch address19/753,RING ROAD,INDIRA NAGAR,LUCKNOW-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
Promoter’s complaints tally (all their projects)17 (Under Registration - 1 ) → 17 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco Akaar-Sakaar at Eldeco Imperia

Is Eldeco Akaar-Sakaar at Eldeco Imperia RERA registered?

Yes. Eldeco Akaar-Sakaar at Eldeco Imperia is registered with UPRERA under registration number UPRERAPRJ481588, registered on 26 Aug 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Eldeco Akaar-Sakaar at Eldeco Imperia?

The completion date filed with UPRERA is 24 Sept 2028. No completion certificate is on record yet.

Who is the builder of Eldeco Akaar-Sakaar at Eldeco Imperia?

ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Akaar-Sakaar at Eldeco Imperia with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Eldeco Akaar-Sakaar at Eldeco Imperia have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

What configurations are available in Eldeco Akaar-Sakaar at Eldeco Imperia?

The unit plan filed with UPRERA lists OTHER, STUDIO and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eldeco Akaar-Sakaar at Eldeco Imperia?

The approved unit plan filed with UPRERA runs from 20 to 31 m² of carpet area (about 220 to 333 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eldeco Akaar-Sakaar at Eldeco Imperia?

The approved unit plan describes 2 blocks and 40 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eldeco Akaar-Sakaar at Eldeco Imperia?

About 96 units per acre: 40 planned units across 0.42 acres (1,695 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗