Eldeco Imperia Avenue

UPRERARegistered

Eldeco Imperia Avenue is a RERA-registered commercial project by ELDECO Housing and Industries Ltd. in Jaitikhera, Lucknow (RERA ID UPRERAPRJ919393). Registered with a completion deadline of 23 Dec 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ919393
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Industrial Development Authority
Proposed start1 Mar 2026
Project duration58 months
AddressCommercial -01. Residential Township, Eldeco Imperia. Jaitikhera,Lucknow, Jaitikhera, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1083/1051/UPSIDA/Pari.Ka./2025-26

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Mar 2026
Original completion23 Dec 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹30,000
Sanctioning authorityLucknow Industrial Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors54 · 1 · 3 (units from plan)
Homes · commercial units0 · 54 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP5410-54
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Imperia Avenue · SHOP35410-54
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr.Sanjay Kumar Gupta
License CA/1989/12382
108, Eldeco CC-I, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Engineer
Er.Akhilesh Kumar Singh
D-27,Indira Nagra,Lucknow-226016
Contractor
MS.Prabha Enterprises
182 C, Eldeco Udyan-I,Bangla Bazarlucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Project site is part of an approved/developed layout and is very well marked and defined at the site i.e. Eldeco Imperia -I
2Boundary Wall
The site has a 2.5 Mt high and 50 Mt in length boundary wall at the south side is already constructed. Being an open shopping complex, a 680 mm high MS railing has been proposed on the other three sides ( total length-96 mt. approx) to keep the complex visible. The MS railing shall be fixed over a 230 mm thick wall with proper footing and PCC (1.4.8) base.
3Road Work
The complex has a well developed 24 mt CC approach road. The internal roads and parkings shall be finished with a combination of pavers/stone and CC laid over a well compacted PCC(1.4.8) on compacted earth.
4Footpaths
No defined foothpaths are there for internal circulation. Internal circulation. Internal roads and parkings shall be there as per the approved layout and specifications mentioned at Sl .no.3
5Water Supply Including Drinking Water Facilities
A 25 mm potable water supply shall be available on all the floors thru a terrace tank. of 20000 Lts. Constructed in RCC. The tank shall be filled with a 32 mm Pipe extracted from Ground water. 5 taps of drinking water on all the floors shall be provided.
6Sewer System
A150 dia HDPE sewer line is planned to be laid to collect soil water from the toilet area and connect it to the already laid township sewer line, which is connected to a 300 KLD township STP.
7Drain
A 280 wide CC U-channel , covered with perforated 50 mm thick CC covers, along the edge of the site is planned to be developed to collect the site surface water and direct it to the drainage system of the township. However the rooftop collected storm water shall be directed to a 1500 mm dia recharge pit through a 200 mm pipe.
8Parks
Not applicable. However plantation along the south boundary wall is planned with 25 no. evergreen trees of 3.5 to 4 mt height. 0.60 mt high hedges (Hamelia Patens ) along the pathways shall be provided.
9Tree Planting
25 no. trees of 3.5 to 4.00 mt height are planned along the boundary. Type - Plumeria Rebra and Plumeria Alba.
10Design For Electric Supply Including Street Lighting
A 400 KVA connection is proposed to be applied to support 47 no. Shops, corridor lighting and outdoor lighting. 6 no.-6 mt high street light poles with 60 W LEd are proposed for a general lighting along with the bollards lights.
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
A central STP of adequate capacity( 300 KLD) has been provided with the township to take care of sewage treatment part.
13Solid Waste Management And Disposal System
To be co-ordinated with the local Municipal authority collection system.
14Water Conservation System
All the roof top water shall be collected thru 6 no. 100 dia down pipes and shall be directed to a 1500 mm dia recharge pit thru a 200 mm dia pipe.
15Energy Management System Including Use of Renewable Energy
25 percentage of the corridor and outdoor lights shall have Solar backup
16Fire Protection And Fire Safety System
A 100 mm dia downcomer with hose reel on each floor, 3 no. fire extinguishers on each floor and a manual fire alarm system shall be there to take care of fire fighting system.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
A minimum 2.00 mt wide exit is available within 30 mt distance of any point of the building.
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

31 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Abhishek KumarUPRERAAGT17780
2Aman ChawlaUPRERAAGT11258
3ARADHYA REAL ESTATEUPRERAAGT13179
4Ashfaq AhmedUPRERAAGT25688
5Asit Gupta C/O Dwelling HomesUPRERAAGT20902
6Brijendra SinghUPRERAAGT10496
7CITY1ONE REALTORS PRIVATE LIMITEDUPRERAAGT24285
8DEVENDRA VERMAUPRERAAGT14290
9Gaurav Kumar SrivastavUPRERAAGT21688
10GOLDEN ESTATEUPRERAAGT10397
11INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
12KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
13manju tripathiUPRERAAGT14947
14MONISHA BUDHRAJAUPRERAAGT16694
15Mukesh kumar SharmaUPRERAAGT11494
16Om PrakashUPRERAAGT17435
17OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
18Prem Prakash KhareUPRERAAGT13677
19Pulkit SethiUPRERAAGT25269
20R K PROPERTIESUPRERAAGT11201
21RAKESH DEWANUPRERAAGT15661
22REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
23RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
24Sanjay ThakurUPRERAAGT26260
25SAURABH AGARWALUPRERAAGT24870
26SAURABH JOSHIUPRERAAGT24268
27SUNIL KUMAR PRAJAPATIUPRERAAGT12499
28Udai AssociatesUPRERAAGT14663
29VANDANA AGARWALUPRERAAGT13353
30Vikas SinghUPRERAAGT11446
31VINEET THAPARUPRERAAGT20835
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 23 Dec 2030.

Sanctioned by Lucknow Industrial Development Authority · 1,964 sqm of land · an approved plan of 1 block and 54 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
1083/1051/UPSIDA/Pari.Ka./2025-2624 Dec 202523 Dec 203022 Dec 203323 Dec 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
37Ba974Khasra
37sa796.89Khasra
36192.91Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1426
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9891
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Consortium-Agreement-29
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · Clarification of Consortium
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Consortium-Amendment-110
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Jan 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Mar 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Feb 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Feb 2026 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New30 Jan 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Feb 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Feb 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Feb 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Mar 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Feb 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New12 Mar 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Mar 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Mar 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New11 Mar 2026 ↗

Quarterly progress reports

3 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

3 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q2.

QuarterConstructionCertificates
2025-Q40.03%CA ↗ · Arch ↗ · Eng ↗
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameELDECO Housing and Industries Ltd.
RolePromoter · current
RERA IDUPRERAPRM21
PANAAACE4554G
CIN / TANL45202UP1985PLC099376
Name of chairmanMr Pankaj Bajaj
Registered addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameNEPTUNE INFRACON PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressEldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010
RERA contact
Legal nameSHIVAYE CONSTRUCTION PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressEldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010
RERA contact

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S EHIL COL A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj,LucknowBranch addressA-1/21 Aliganj,Sector B Opposite Nehru Bal Vatika,Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412Branch emailbikas.shukla@hdfc.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S.EHIL SEP A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj, lucknowBranch addressA-1/21,Aliganj Sector B Opposite Nehru Bal Vatika,Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S.EHIL TRAN A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj, LucknowBranch addressA-1/21 aliganj Sector B Opposite Nehru Bal Vatika, Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
Promoter’s complaints tally (all their projects)17 (Under Registration - 1 ) → 17 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco Imperia Avenue

Is Eldeco Imperia Avenue RERA registered?

Yes. Eldeco Imperia Avenue is registered with UPRERA under registration number UPRERAPRJ919393, registered on 20 Mar 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Eldeco Imperia Avenue?

The completion date filed with UPRERA is 23 Dec 2030. No completion certificate is on record yet.

Who is the builder of Eldeco Imperia Avenue?

ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Imperia Avenue with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Eldeco Imperia Avenue have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eldeco Imperia Avenue located?

Eldeco Imperia Avenue is registered in Jaitikhera, Lucknow, as filed with UPRERA.

What configurations are available in Eldeco Imperia Avenue?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eldeco Imperia Avenue?

The approved unit plan filed with UPRERA runs from 10 to 54 m² of carpet area (about 106 to 578 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eldeco Imperia Avenue?

The approved unit plan describes 1 block and 54 units of which 0 are homes and 54 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eldeco Imperia Avenue?

About 111 units per acre: 54 planned units across 0.49 acres (1,964 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗