Eldeco Imperia Avenue is a RERA-registered commercial project by ELDECO Housing and Industries Ltd. in Jaitikhera, Lucknow (RERA ID UPRERAPRJ919393). Registered with a completion deadline of 23 Dec 2030.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ919393 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Industrial Development Authority |
| Proposed start | 1 Mar 2026 |
| Project duration | 58 months |
| Address | Commercial -01. Residential Township, Eldeco Imperia. Jaitikhera,Lucknow, Jaitikhera, Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1083/1051/UPSIDA/Pari.Ka./2025-26
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 20 Mar 2026 |
| Original completion | 23 Dec 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹30,000 |
| Sanctioning authority | Lucknow Industrial Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 54 | 10-54 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Imperia Avenue · SHOP | 3 | 54 | 10-54 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Project site is part of an approved/developed layout and is very well marked and defined at the site i.e. Eldeco Imperia -I |
| 2 | Boundary Wall The site has a 2.5 Mt high and 50 Mt in length boundary wall at the south side is already constructed. Being an open shopping complex, a 680 mm high MS railing has been proposed on the other three sides ( total length-96 mt. approx) to keep the complex visible. The MS railing shall be fixed over a 230 mm thick wall with proper footing and PCC (1.4.8) base. |
| 3 | Road Work The complex has a well developed 24 mt CC approach road. The internal roads and parkings shall be finished with a combination of pavers/stone and CC laid over a well compacted PCC(1.4.8) on compacted earth. |
| 4 | Footpaths No defined foothpaths are there for internal circulation. Internal circulation. Internal roads and parkings shall be there as per the approved layout and specifications mentioned at Sl .no.3 |
| 5 | Water Supply Including Drinking Water Facilities A 25 mm potable water supply shall be available on all the floors thru a terrace tank. of 20000 Lts. Constructed in RCC. The tank shall be filled with a 32 mm Pipe extracted from Ground water. 5 taps of drinking water on all the floors shall be provided. |
| 6 | Sewer System A150 dia HDPE sewer line is planned to be laid to collect soil water from the toilet area and connect it to the already laid township sewer line, which is connected to a 300 KLD township STP. |
| 7 | Drain A 280 wide CC U-channel , covered with perforated 50 mm thick CC covers, along the edge of the site is planned to be developed to collect the site surface water and direct it to the drainage system of the township. However the rooftop collected storm water shall be directed to a 1500 mm dia recharge pit through a 200 mm pipe. |
| 8 | Parks Not applicable. However plantation along the south boundary wall is planned with 25 no. evergreen trees of 3.5 to 4 mt height. 0.60 mt high hedges (Hamelia Patens ) along the pathways shall be provided. |
| 9 | Tree Planting 25 no. trees of 3.5 to 4.00 mt height are planned along the boundary. Type - Plumeria Rebra and Plumeria Alba. |
| 10 | Design For Electric Supply Including Street Lighting A 400 KVA connection is proposed to be applied to support 47 no. Shops, corridor lighting and outdoor lighting. 6 no.-6 mt high street light poles with 60 W LEd are proposed for a general lighting along with the bollards lights. |
| 11 | Community Buildings N.A |
| 12 | Treatment and Disposal System of Sewage and Sullage water A central STP of adequate capacity( 300 KLD) has been provided with the township to take care of sewage treatment part. |
| 13 | Solid Waste Management And Disposal System To be co-ordinated with the local Municipal authority collection system. |
| 14 | Water Conservation System All the roof top water shall be collected thru 6 no. 100 dia down pipes and shall be directed to a 1500 mm dia recharge pit thru a 200 mm dia pipe. |
| 15 | Energy Management System Including Use of Renewable Energy 25 percentage of the corridor and outdoor lights shall have Solar backup |
| 16 | Fire Protection And Fire Safety System A 100 mm dia downcomer with hose reel on each floor, 3 no. fire extinguishers on each floor and a manual fire alarm system shall be there to take care of fire fighting system. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A |
| 18 | Emergency Evacuation Services A minimum 2.00 mt wide exit is available within 30 mt distance of any point of the building. |
| 19 | Other Miscellaneous Work N.A |
Registered agents
31 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Abhishek Kumar | UPRERAAGT17780 |
| 2 | Aman Chawla | UPRERAAGT11258 |
| 3 | ARADHYA REAL ESTATE | UPRERAAGT13179 |
| 4 | Ashfaq Ahmed | UPRERAAGT25688 |
| 5 | Asit Gupta C/O Dwelling Homes | UPRERAAGT20902 |
| 6 | Brijendra Singh | UPRERAAGT10496 |
| 7 | CITY1ONE REALTORS PRIVATE LIMITED | UPRERAAGT24285 |
| 8 | DEVENDRA VERMA | UPRERAAGT14290 |
| 9 | Gaurav Kumar Srivastav | UPRERAAGT21688 |
| 10 | GOLDEN ESTATE | UPRERAAGT10397 |
| 11 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 12 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 13 | manju tripathi | UPRERAAGT14947 |
| 14 | MONISHA BUDHRAJA | UPRERAAGT16694 |
| 15 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 16 | Om Prakash | UPRERAAGT17435 |
| 17 | OPAL PROPERTY SOLUTIONS PRIVATE LIMITED | UPRERAAGT13636 |
| 18 | Prem Prakash Khare | UPRERAAGT13677 |
| 19 | Pulkit Sethi | UPRERAAGT25269 |
| 20 | R K PROPERTIES | UPRERAAGT11201 |
| 21 | RAKESH DEWAN | UPRERAAGT15661 |
| 22 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 23 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 24 | Sanjay Thakur | UPRERAAGT26260 |
| 25 | SAURABH AGARWAL | UPRERAAGT24870 |
| 26 | SAURABH JOSHI | UPRERAAGT24268 |
| 27 | SUNIL KUMAR PRAJAPATI | UPRERAAGT12499 |
| 28 | Udai Associates | UPRERAAGT14663 |
| 29 | VANDANA AGARWAL | UPRERAAGT13353 |
| 30 | Vikas Singh | UPRERAAGT11446 |
| 31 | VINEET THAPAR | UPRERAAGT20835 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 23 Dec 2030.
Sanctioned by Lucknow Industrial Development Authority · 1,964 sqm of land · an approved plan of 1 block and 54 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1083/1051/UPSIDA/Pari.Ka./2025-26 | 24 Dec 2025 | 23 Dec 2030 | 22 Dec 2033 | 23 Dec 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 37Ba | 974 | Khasra |
| 37sa | 796.89 | Khasra |
| 36 | 192.91 | Khasra |
| Registry document · 1426 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9891 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Consortium-Agreement-29 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · Clarification of Consortium The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Consortium-Amendment-110 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 22 Jan 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Mar 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Feb 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Feb 2026 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 30 Jan 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 Feb 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Feb 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Feb 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Mar 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 26 Feb 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 12 Mar 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 11 Mar 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 11 Mar 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 11 Mar 2026 ↗ |
Quarterly progress reports
3 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
3 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q4 | 0.03% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ELDECO Housing and Industries Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM21 |
| PAN | AAACE4554G |
| CIN / TAN | L45202UP1985PLC099376 |
| Name of chairman | Mr Pankaj Bajaj |
| Registered address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| RERA contact | |
| Registered since | 2017 |
| Legal name | NEPTUNE INFRACON PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010 |
| RERA contact |
| Legal name | SHIVAYE CONSTRUCTION PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S EHIL COL A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj,LucknowBranch addressA-1/21 Aliganj,Sector B Opposite Nehru Bal Vatika,Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412Branch emailbikas.shukla@hdfc.bank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/S.EHIL SEP A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj, lucknowBranch addressA-1/21,Aliganj Sector B Opposite Nehru Bal Vatika,Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S.EHIL TRAN A/C FOR ELDECO IMPERIA AVENUEBankHDFC BankBranchAliganj, LucknowBranch addressA-1/21 aliganj Sector B Opposite Nehru Bal Vatika, Lucknow-226024Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000412 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 17 (Under Registration - 1 ) → 17 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eldeco Imperia Avenue
Is Eldeco Imperia Avenue RERA registered?
Yes. Eldeco Imperia Avenue is registered with UPRERA under registration number UPRERAPRJ919393, registered on 20 Mar 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Eldeco Imperia Avenue?
The completion date filed with UPRERA is 23 Dec 2030. No completion certificate is on record yet.
Who is the builder of Eldeco Imperia Avenue?
ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Imperia Avenue with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Eldeco Imperia Avenue have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eldeco Imperia Avenue located?
Eldeco Imperia Avenue is registered in Jaitikhera, Lucknow, as filed with UPRERA.
What configurations are available in Eldeco Imperia Avenue?
The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Eldeco Imperia Avenue?
The approved unit plan filed with UPRERA runs from 10 to 54 m² of carpet area (about 106 to 578 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Eldeco Imperia Avenue?
The approved unit plan describes 1 block and 54 units of which 0 are homes and 54 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Eldeco Imperia Avenue?
About 111 units per acre: 54 planned units across 0.49 acres (1,964 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗