Eldeco Imperia is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Lucknow (RERA ID UPRERAPRJ929056). RERA status: Completed on 4 Mar 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ929056 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Industrial Development Authority |
| Proposed start | 1 Apr 2021 |
| Project duration | 72 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
2095(earlier permit no was 386 dated 17/06/2019)
Building permit sanctioned
2095 ( earlier permit no was 386 dated 17/06/2019)
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 19 May 2021 |
| Original completion | 15 Mar 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 4 Mar 2024 |
| Registration fee | ₹3,32,000 |
| Sanctioning authority | Lucknow Industrial Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Total site is well demarcated and most of the side boundary is constructed. |
| 2 | Boundary Wall 2.7 mt high boundary wall is planned for this mini Township. |
| 3 | Road Work 24/18/9.00mt Paver, C.C and Black Top roads are planned as per approved layout. |
| 4 | Footpaths 2.4 mt to 1.2 mt wide pathways along roads to be constructed with C.C/Paver blocks. |
| 5 | Water Supply Including Drinking Water Facilities Total township to have a separate OHT with boring to extract under ground water. Supply to the township shall be through supply lines as per design. |
| 6 | Sewer System A well designed sewer system has been planned with provision STP, |
| 7 | Drain Total under ground drainage system has been planned along the roads with adequate no of rain water harvesting points. |
| 8 | Parks 15 percentage of the total land area has been planned as parks. Kids play facilities and walking /jogging facilities shall be part of these parks. |
| 9 | Tree Planting 3.5 to 4.5 mt high plantation along the road has been planned. |
| 10 | Design For Electric Supply Including Street Lighting Adequate no. of street lighting poles are planned as per norms. Under ground cable system has been designed. |
| 11 | Community Buildings A club building with basic recreational facilities with common hall and TT table has been proposed. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Total 300 KLD has been proposed ( 150KLD+150 KLD in two phases). |
| 13 | Solid Waste Management And Disposal System Shall be lined up with Lucknow Nagar Nigam for door to door collection. |
| 14 | Water Conservation System Adequate no. of recharge pits as per drawing .Endeavour is to recharge complete roof top storm water. |
| 15 | Energy Management System Including Use of Renewable Energy Recycled water to be used for cisterns and irrigation. 25 percentage of the street lights shall have solar back up. |
| 16 | Fire Protection And Fire Safety System All the common buildings, proposed to be constructed shall have adequate fire fighting/ fire exit arrangements/provisions. Adequate water supply/storage within colony for fire related emergency. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services A nursery+primary+Highschool provision is there. |
| 18 | Emergency Evacuation Services 24.00/18.00/9.00 mt.roads to facilitate easy exit. |
| 19 | Other Miscellaneous Work NA |
Registered agents
39 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | AMIT AGARWAL | UPRERAAGT11945 |
| 3 | Amit Tiwari | UPRERAAGT20854 |
| 4 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 5 | ARTI TIWARI | UPRERAAGT14234 |
| 6 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 7 | Asit Gupta C/O Dwelling Homes | UPRERAAGT20902 |
| 8 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 9 | bhupendra kumar singh | UPRERAAGT11056 |
| 10 | BIPIN CHANDRA PANT | UPRERAAGT13687 |
| 11 | Brijendra Singh | UPRERAAGT10496 |
| 12 | DAIWIK REALTORS | UPRERAAGT12075 |
| 13 | DEVENDRA VERMA | UPRERAAGT14290 |
| 14 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 15 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 16 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 17 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 18 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 19 | OPAL PROPERTY SOLUTIONS PRIVATE LIMITED | UPRERAAGT13636 |
| 20 | Prem Prakash Khare | UPRERAAGT13677 |
| 21 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 22 | REETA MAURYA C/O SHIVA ASSOCIATE | UPRERAAGT13650 |
| 23 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 24 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 25 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 26 | SHAH MOHSIN KAMAL | UPRERAAGT14208 |
| 27 | SHREE SAI ASSOCIATES | UPRERAAGT11846 |
| 28 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 29 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 30 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 31 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 32 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 33 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 34 | VANDANA AGARWAL | UPRERAAGT13353 |
| 35 | Varun Properties Inc. | UPRERAAGT11985 |
| 36 | Vikas Singh | UPRERAAGT11446 |
| 37 | VIMLESH PRATAP SINGH | UPRERAAGT11674 |
| 38 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
| 39 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 15 Mar 2025. 1 of them carries a revalidation, valid to 15 Mar 2026.
Sanctioned by Lucknow Industrial Development Authority · 65,347 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 2095 ( earlier permit no was 386 dated 17/06/2019) | 16 Mar 2021 | 15 Mar 2025 | 14 Mar 2029 | 15 Mar 2027 | — | |
| — | 15 Mar 2025 | 15 Mar 2027 | 15 Mar 2026 | 16 Mar 2021 valid to 15 Mar 2026 as 2095(earlier permit no was 386 dated 17/06/2019) |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
37 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 30 | 1755 | Khasra |
| 31 | 3240 | Khasra |
| 32 | 1940 | Khasra |
| 33 | 1330 | Khasra |
| 34 | 1320 | Khasra |
| 35 | 1340 | Khasra |
| 36 | 1320 | Khasra |
| 37BA | 3600 | Khasra |
| 37SA | 4430 | Khasra |
| 42 | 600 | Khasra |
| 43 | 600 | Khasra |
| 44 | 610 | Khasra |
| 142sa | 9200 | Khasra |
| 142Mi | 3800 | Khasra |
| 149 | 3100 | Khasra |
| 150 | 1540 | Khasra |
| 151 | 6285 | Khasra |
| 152 | 3400 | Khasra |
| 152mi | 1700 | Khasra |
| 153 | 2160 | Khasra |
| 155 | 5390 | Khasra |
| 293sa | 5060 | Khasra |
| 293/2 | 5060 | Khasra |
| Sale deed · 7900 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13311 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1426 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1367 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1366 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9891 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 30452 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 29 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 0000 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 32 Villa Permit The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 13 Apr 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Dec 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 27 Mar 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 27 Mar 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 27 Mar 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 13 Apr 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Mar 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Mar 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Mar 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 26 Mar 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 27 Mar 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 27 Mar 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 27 Mar 2021 ↗ |
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2024-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ELDECO Housing and Industries Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM21 |
| PAN | AAACE4554G |
| CIN / TAN | L45202UP1985PLC099376 |
| Name of chairman | Mr Pankaj Bajaj |
| Registered address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| RERA contact | |
| Registered since | 2017 |
| Legal name | NEPTUNE INFRACON PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010 |
| RERA contact |
| Legal name | SHIVAYE CONSTRUCTION PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Eldeco Housing And Industries Limited-Imperia Rera Collection A/CBankICICI BankBranchIndira Nagar,LucknowBranch address19/753,Ring Road,Indira Nagar,Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | eldeco Housing And Industries LimitedBankICICI BankBranchIndira Nagar,LucknowBranch address19/753,Ring Road,Indira Nagar,Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 17 (Under Registration - 1 ) → 17 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eldeco Imperia
Is Eldeco Imperia RERA registered?
Yes. Eldeco Imperia is registered with UPRERA under registration number UPRERAPRJ929056, registered on 19 May 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Eldeco Imperia been completed?
UPRERA lists Eldeco Imperia as completed, with a completion certificate dated 4 Mar 2024, against a filed deadline of 15 Mar 2027.
Who is the builder of Eldeco Imperia?
ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Imperia with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does Eldeco Imperia show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Does Eldeco Imperia have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eldeco Imperia located?
Eldeco Imperia is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗