Eldeco East End at Shaurya is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Lucknow (RERA ID UPRERAPRJ513776). RERA status: Completed on 22 Feb 2024.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ513776 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Industrial Development Authority |
| Proposed start | 15 Jun 2021 |
| Project duration | 58 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2096
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Jun 2021 |
| Original completion | 15 Mar 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 22 Feb 2024 |
| Registration fee | ₹66,000 |
| Sanctioning authority | Lucknow Industrial Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Total site is very well demarcated and most of the site boundary is constructed. |
| 2 | Boundary Wall 2.7 mt. high boundary wall is planned for this mini Township. |
| 3 | Road Work 9.00 mt Black top roads are planned as per the approved layout. |
| 4 | Footpaths 0.9 mt to 12 mt. wide pathways along roads .To be constructed with C.C/paver blocks. |
| 5 | Water Supply Including Drinking Water Facilities Total township to have a separate OHT/UGT with boring to extract under ground water. Supply to the township shall be through supply lines as per design. |
| 6 | Sewer System A well designed sewer system has been planned with provision of STP. |
| 7 | Drain Total under ground drainage system has been planned along the roads with adequate no. of Rain water harvesting points. |
| 8 | Parks 15 percentage of the total land area has been planned as parks .Kids play facilities and walking/ jogging facilities shall be part of these parks. |
| 9 | Tree Planting 3.5 to 4.5 mt high plantation along the road has been planned. |
| 10 | Design For Electric Supply Including Street Lighting Adequate no. of street lighting poles are planned as per norms.Under ground cable system has been designed. |
| 11 | Community Buildings Club in township( Eldeco Shaurya) already developed. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Separate STP to be provided. |
| 13 | Solid Waste Management And Disposal System Shall be lined up with Lucknow Nagar Nigam for door to door collection. |
| 14 | Water Conservation System Adequate no. of recharge pits as per drawings .Endeavour is to recharge complete roof top storm water. |
| 15 | Energy Management System Including Use of Renewable Energy Recycled water to be used for cisterns and irrigation.25 percentage of the street lights shall have solar back up. |
| 16 | Fire Protection And Fire Safety System N.A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A |
| 18 | Emergency Evacuation Services 9.00 mt. roads to facilitate easy exit. |
| 19 | Other Miscellaneous Work N.A |
Registered agents
38 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | AMIT AGARWAL | UPRERAAGT11945 |
| 3 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 4 | ARTI TIWARI | UPRERAAGT14234 |
| 5 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 6 | Asit Gupta C/O Dwelling Homes | UPRERAAGT20902 |
| 7 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 8 | bhupendra kumar singh | UPRERAAGT11056 |
| 9 | BIPIN CHANDRA PANT | UPRERAAGT13687 |
| 10 | Brijendra Singh | UPRERAAGT10496 |
| 11 | DAIWIK REALTORS | UPRERAAGT12075 |
| 12 | DEVENDRA VERMA | UPRERAAGT14290 |
| 13 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 14 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 15 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 16 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 17 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 18 | OPAL PROPERTY SOLUTIONS PRIVATE LIMITED | UPRERAAGT13636 |
| 19 | Prem Prakash Khare | UPRERAAGT13677 |
| 20 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 21 | REETA MAURYA C/O SHIVA ASSOCIATE | UPRERAAGT13650 |
| 22 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 23 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 24 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 25 | SHAH MOHSIN KAMAL | UPRERAAGT14208 |
| 26 | SHREE SAI ASSOCIATES | UPRERAAGT11846 |
| 27 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 28 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 29 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 30 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 31 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 32 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 33 | VANDANA AGARWAL | UPRERAAGT13353 |
| 34 | Varun Properties Inc. | UPRERAAGT11985 |
| 35 | Vikas Singh | UPRERAAGT11446 |
| 36 | VIMLESH PRATAP SINGH | UPRERAAGT11674 |
| 37 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
| 38 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Mar 2026.
Sanctioned by Lucknow Industrial Development Authority · 12,180 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2096 | 16 Mar 2021 | 15 Mar 2026 | 14 Mar 2029 | 15 Mar 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 41 | 1550 | Khasra |
| 42 | 1620 | Khasra |
| 51 | 2970 | Khasra |
| 52 | 2420 | Khasra |
| 43 | 3620 | Khasra |
| Sale deed · 20564 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15529 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15838 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15782 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15562 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 20836 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21829 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1424-1429 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 3 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 00000 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 May 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 28 May 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 May 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 28 May 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 26 May 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 May 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 May 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 May 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 May 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 28 May 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 26 May 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 27 May 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 27 May 2021 ↗ |
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2023-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ELDECO Housing and Industries Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM21 |
| PAN | AAACE4554G |
| CIN / TAN | L45202UP1985PLC099376 |
| Name of chairman | Mr Pankaj Bajaj |
| Registered address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| RERA contact | |
| Registered since | 2017 |
| Legal name | SWARG CONSTRUCTIONS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber 1, 2nd Floor, Vibhuti Khand, Gomti Nagar, Lucknow-226010 |
| RERA contact |
| Legal name | SAMARPIT CONSTRUCTIONS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Eldeco Corporate Chamber 1, 2nd Floor, Vibhuti Khand, Gomti Nagar, Lucknow 226010 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Eldeco Housing And Industries Limited Eldeco East End At Shaurya-Rera Collection AccountBankICICI BankBranchIndra NagarBranch address19/753,Ring Road Indira Nagar,Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Eldeco Housing And Industries LimitedBankICICi BankBranchIndra NagarBranch address19/753,Ring Road Indira Nagar-Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000591 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 17 (Under Registration - 1 ) → 17 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eldeco East End at Shaurya
Is Eldeco East End at Shaurya RERA registered?
Yes. Eldeco East End at Shaurya is registered with UPRERA under registration number UPRERAPRJ513776, registered on 30 Jun 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Eldeco East End at Shaurya been completed?
UPRERA lists Eldeco East End at Shaurya as completed, with a completion certificate dated 22 Feb 2024, against a filed deadline of 15 Mar 2026.
Who is the builder of Eldeco East End at Shaurya?
ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco East End at Shaurya with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Eldeco East End at Shaurya have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eldeco East End at Shaurya located?
Eldeco East End at Shaurya is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗