Eldeco Inner Circle at Eldeco Shaurya

UPRERACompleted

Eldeco Inner Circle at Eldeco Shaurya is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Lucknow (RERA ID UPRERAPRJ928011). RERA status: Completed on 6 Sept 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ928011
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Industrial Development Authority
Proposed start1 Oct 2019
Project duration83 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    721

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Oct 2019
Original completion25 Feb 2026
Revised completion24 Aug 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary6 Sept 2023
Registration fee₹44,000
Sanctioning authorityLucknow Industrial Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sanjay Kumar Gupta
License CA/89/12382
108,Corporate Chamber-1,Vibhuti Khand,Lucknow-226010
Engineer
AKHILESH KUMAR SINGH
ATS STRUCTURAL CONSULTANTS D-27,INDRA NAGAR LUCKNOW
Contractor
J K SAHANI
J K SAHANI CONSTRUCTION,RAGHAV NAGAR B D GIRLS INTER COLLEGE DEOORIA UP
Sr.Development work declared to RERA
1Demarcation of Plots
Site is demarcated with boundary and approach road.
2Boundary Wall
One side boundary is constructed.
3Road Work
9.00 mt wide black top road network is planned.
4Footpaths
900 mm wide footpath on both the sides of road with pavers.
5Water Supply Including Drinking Water Facilities
Well designed water supply system using 80 mm UPVC pipe.
6Sewer System
A well laid sewer system connected to main sewer line on 18 mt. road.
7Drain
Kc/U-drain along roads.
8Parks
Parks to be developed with grass cover and low height plants/shrubs.
9Tree Planting
4 to 4.5 mt high trees along roads.
10Design For Electric Supply Including Street Lighting
Electric lighting and supply using 7.5 to 9 mt. high poles.
11Community Buildings
Club within Shaurya Township..
12Treatment and Disposal System of Sewage and Sullage water
Existing STP.
13Solid Waste Management And Disposal System
To be coordinated with Nagar Nigam or its deputed agency.
14Water Conservation System
Rain water harvesting proposed.
15Energy Management System Including Use of Renewable Energy
Recycled water and solar lighting.
16Fire Protection And Fire Safety System
Exit through 9 mt. wide roads.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
N.A.
19Other Miscellaneous Work
N.A.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

36 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AMIT AGARWALUPRERAAGT11945
3ANIL KUMAR VERMAUPRERAAGT14346
4ARTI TIWARIUPRERAAGT14234
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6bhupendra kumar singhUPRERAAGT11056
7BIPIN CHANDRA PANTUPRERAAGT13687
8Brijendra SinghUPRERAAGT10496
9DAIWIK REALTORSUPRERAAGT12075
10DEVENDRA VERMAUPRERAAGT14290
11GOLDEN STAR REAL ESTATESUPRERAAGT10303
12INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
13INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
14KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
15Mr. Janardan AgarwalUPRERAAGT10555
16OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
17Prem Prakash KhareUPRERAAGT13677
18Rajni DawraUPRERAAGT13519
19REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
20REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
21RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
22SANJEEV KUMAR BANKAUPRERAAGT10894
23SDR INFRA BUILD PVT LTDUPRERAAGT11062
24SHAH MOHSIN KAMALUPRERAAGT14208
25SHREE SAI ASSOCIATESUPRERAAGT11846
26SHREE SHRADDHA PROPERTIESUPRERAAGT10301
27SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
28Smart InfraReality Private LimitedUPRERAAGT10057
29SMC Real Estate Advisors Private LimitedUPRERAAGT10113
30SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
31Vajrakaya Buildwell Private LimitedUPRERAAGT12913
32VANDANA AGARWALUPRERAAGT13353
33Varun Properties Inc.UPRERAAGT11985
34VIMLESH PRATAP SINGHUPRERAAGT11674
35VIRENDRA KUMAR DEWANUPRERAAGT13205
36VISHESH SRIVASTAVAUPRERAAGT11416
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2023.

Sanctioned by Lucknow Industrial Development Authority · 7,745 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
72127 Feb 201826 Feb 202325 Feb 202625 Feb 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 24 Aug 2026.

#Granted fromExtended uptoNote
125 Feb 202624 Aug 2026Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
16/25060Khasra
16SA3790Khasra
153160Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 10681
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 14716
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9713
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 63
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Sept 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New12 Sept 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Sept 2019 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New5 Sept 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Sept 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Sept 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Sept 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Sept 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Sept 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Sept 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Sept 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Sept 2019 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameELDECO Housing and Industries Ltd.
RolePromoter · current
RERA IDUPRERAPRM21
PANAAACE4554G
CIN / TANL45202UP1985PLC099376
Name of chairmanMr Pankaj Bajaj
Registered addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSWARG CONSTRUCTIONS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressEldeco Corporate Chamber 1, 2nd Floor, Vibhuti Khand, Gomti Nagar, Lucknow-226010
RERA contact
Legal nameSHOBHIT KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressGram-Jakariya, Post- Budhwara, Barabanki, Uttar Pradesh-225204
RERA contact

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Eldeco Housing & Industries Limited Rera Retention A/cBankICICI Bank Ltd.BranchIndiranagar, LucknowA/C no.IFSCICIC0000591
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)17 (Under Registration - 1 ) → 17 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco Inner Circle at Eldeco Shaurya

Is Eldeco Inner Circle at Eldeco Shaurya RERA registered?

Yes. Eldeco Inner Circle at Eldeco Shaurya is registered with UPRERA under registration number UPRERAPRJ928011, registered on 14 Oct 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Eldeco Inner Circle at Eldeco Shaurya been completed?

UPRERA lists Eldeco Inner Circle at Eldeco Shaurya as completed, with a completion certificate dated 6 Sept 2023, against a filed deadline of 24 Aug 2026.

Who is the builder of Eldeco Inner Circle at Eldeco Shaurya?

ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Inner Circle at Eldeco Shaurya with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Eldeco Inner Circle at Eldeco Shaurya more time to complete?

UPRERA's record carries 1 completion extension for Eldeco Inner Circle at Eldeco Shaurya, the latest running to 24 Aug 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Eldeco Inner Circle at Eldeco Shaurya have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eldeco Inner Circle at Eldeco Shaurya located?

Eldeco Inner Circle at Eldeco Shaurya is registered in Lucknow, as filed with UPRERA.