KM Residency

UPRERARegistered

KM Residency is a RERA-registered residential project by S R B PROMOTERS PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ9927). Registered with a completion deadline of 31 Dec 2019. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9927
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start3 Oct 2013
Original start13 Jan 2011
Project duration75 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address37-B, GROUND FLOOR, POCKET - IV, MAYUR VIHAR, PHASE - I DELHI East Delhi DL 110091 IN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    29/ Ma. Plan/ Zone-1/14

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Dec 2019
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹58,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors414 · 5 · 15 (units from plan)
Homes · commercial units407 · 7 (shops and offices filed in the same plan)
  • 2 BHK253 61%
  • 3 BHK154 37%
  • SHOP7 2%
ConfigurationUnitsCarpet area
SHOP715-15
2 BHK25356-66
3 BHK15475-84
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK-A · SHOP, 2 BHK, 3 BHK157715-84
BLOCK-B · 2 BHK1511356-64
BLOCK-C · 2 BHK, 3 BHK148456-75
BLOCK-D · 2 BHK, 3 BHK148456-75
BLOCK-E · 3 BHK145675-84
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anurag Gupta on behalf of VASTU SRIJAN
License CA/85/9138
WB-64, Shakarpur, Delhi-110092
Engineer
Kamal Sabharwal
HS-25, SF, Land II, Kialash Colony MARKET, NEW DELHI-110048
Sr.Development work declared to RERA
1Demarcation of Plots
Khasra No.308-312, located at Raj Nagar Extn., Ghaziabad
2Boundary Wall
RCC boundary wall all around the periphery.
3Road Work
RCC trimix roads will be provided.
4Footpaths
Interlock pavers to be used.
5Water Supply Including Drinking Water Facilities
Raw water will be received in under ground tank, then processed in water treatment plant and treated water stored in tanks.
6Sewer System
Under ground system. Feeder pipeline of UPCC and final discharge through RCC pipes.
7Drain
Storm water will go to harvesting recharge pits. Excess water if any, will be discharge to authority drain.
8Parks
One Park shall be provided.
9Tree Planting
15-20 Nos of tree planting will be done.
10Design For Electric Supply Including Street Lighting
HT line shall be taken from UPPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based.
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
Raw sewerage will be processed through STP of one hundred and twenty five KLD capacity. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasiable. Excess treated water shall be discharge in the authority drain.
13Solid Waste Management And Disposal System
Kitchen waste collection will be collected through maunnal.
14Water Conservation System
Harvesting recharge pits shall be used. Treated water shall be used for flushing, irrigation and cleaning purpose as much as fessiable.
15Energy Management System Including Use of Renewable Energy
Top three floors will be provided for Solor heating water for kitchen.
16Fire Protection And Fire Safety System
Fire hydrant shall be provided. Fire alarm system, sprinkler (only for basement) and fire extinguisher shall be provied as required.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Retail shops are be provied as part of commercial area to be sold separately by developers. Swimming pool shall be provided as part of the club.
18Emergency Evacuation Services
Fire tender route and refused areas shall be provided. Emergency stairs shall be provided as approved by fire department.
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 2 Oct 2018.

Sanctioned by Ghaziabad Development Authority · 10,614 sqm of land · an approved plan of 5 blocks and 414 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
29/ Ma. Plan/ Zone-1/143 Oct 20132 Oct 20181 Oct 202131 Dec 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3080.1470 hectare—
3090.1380 hectare—
310 (A)0.2190 hectare—
310 (B)0.1090 hectare—
311 (A)0.0760 hectare—
311 (B)0.1520 hectare—
308-31210614Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 15 Jan 2009.

Registry no.DateTypeArea
Ledger 1 subledger 3818, 157-206 SN 9648 Feb 2010self—
Ledger 1 subledger 3732, 198-246 SN 761615 Jan 2009self—
Ledger 1 subledger 3818, 259-298 SN 96618 Feb 2010self—
Ledger 1 subledger 4085, 177-222 SN 481716 Jun 2010self—
Ledger 1 subledger 3818, 207-258 SN 9658 Feb 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · serial no.964, 965, 4817, 966
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateras approved by competent authority
Fire safety (as filed with RERA)As approved by competent authority
Health serviceAs approved by competent authority
Renewable energyAs approved by competent authority
Other facilitiesAs approved by competent authority

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameS R B PROMOTERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM16745
PANAALCS6447D
CIN / TANU45400DL2007PTC167407
Name of chairman1. HARENDRA SINGH KHOKHAR 2. VIPUL GUPTA
Registered address37-B, GROUND FLOOR, POCKET - IV, MAYUR VIHAR, PHASE - I DELHI East Delhi DL 110091 IN
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Srb promoters pvt ltd.BankOriental Bank of CommerceBranchSahibabadA/C no.IFSCORBC0100630
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about KM Residency

Is KM Residency RERA registered?

Yes. KM Residency is registered with UPRERA under registration number UPRERAPRJ9927, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for KM Residency?

The completion date filed with UPRERA is 31 Dec 2019. No completion certificate is on record yet.

Who is the builder of KM Residency?

S R B PROMOTERS PRIVATE LIMITED is the promoter entity that filed KM Residency with UPRERA (promoter RERA ID UPRERAPRM16745). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does KM Residency show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does KM Residency have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is KM Residency located?

KM Residency is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in KM Residency?

The unit plan filed with UPRERA lists SHOP, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in KM Residency?

The approved unit plan filed with UPRERA runs from 15 to 84 m² of carpet area (about 158 to 901 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in KM Residency?

The approved unit plan describes 5 blocks and 414 units of which 407 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is KM Residency?

About 158 units per acre: 414 planned units across 2.62 acres (10,614 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗