MR Homes Heritage Tower

UPRERARegistered

MR Homes Heritage Tower is a RERA-registered residential project by M/s MR HOMES in Ghaziabad (RERA ID UPRERAPRJ7753). Registered with a completion deadline of 10 Mar 2020.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7753
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start11 May 2014
Original start11 May 2014
Project duration70 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typePartnership Firm
Applicant addressKJ/12 Kavi Nagar Ghaziabad
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    650/GH/Zone-1/13.14

  2. Building permit sanctioned

    650/GH/Zone-1/13.14

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered4 Aug 2017
Original completion11 Mar 2019
Revised completion10 Mar 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹30,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors141 · 1 · 12 (units from plan)
Homes · commercial units121 · 20 (shops and offices filed in the same plan)
  • 3 BHK55 39%
  • 2 BHK44 31%
  • 4 BHK22 16%
  • SHOP20 14%
ConfigurationUnitsCarpet area
SHOP20130-586
2 BHK4446-57
3 BHK5578-86
4 BHK22113
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower T · SHOP, 2 BHK, 3 BHK, 4 BHK1214146-586
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Anuj Agarwal
License CA/96/19503
A-244, Kaushambi, Ghaziabad
Engineer
Sudha Technical Consultants Pvt. Ltd.
F-702, UGF, LADO SARAI, New Delhi
Contractor
M.R.R. Promoters Pvt. Ltd.
C-73, 2nd Floor, Malviya Nagar, New Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
Not Applicable
2Boundary Wall
Part Area covered with boundary wall made with bricks.
3Road Work
RCC/ Black Top roads will be provided within the project as per the requirement
4Footpaths
Interlock pavers to be used
5Water Supply Including Drinking Water Facilities
Raw water will be received in under ground tank, then processed in water treatment plant and treated water stored in tanks.
6Sewer System
Under ground system. Feeder pipeline of UPCC and final discharge through RCC pipes
7Drain
Storm water will go to harvesting recharge pits. Excess water if any, will be discharge to authority drain
8Parks
Parks of 708.31 sq. mtrs. will be provided in front of the project. Parks will have facilities of Jogging track, badminton, cricket ground, Golf putting shall be provided as per approved plan. "
9Tree Planting
Proposed to have 50 tress per hectare
10Design For Electric Supply Including Street Lighting
HT line shall be taken from UPPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based
11Community Buildings
club house on sharing basis as per approved
12Treatment and Disposal System of Sewage and Sullage water
Raw sewerage will be processed through STP . Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasible. Excess treated water shall be discharge in the authority drain.
13Solid Waste Management And Disposal System
Kitchen and other caste shall be collected manually by the agency assigned for housekeeping and shall be disposed as per regulation of waste management.
14Water Conservation System
Harvesting recharge pits shall be used. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasible
15Energy Management System Including Use of Renewable Energy
Top three floors will be provided for Solar heating water for kitchen
16Fire Protection And Fire Safety System
Fire hydrant shall be provided. Fire alarm system, sprinkler, smoke detectors and fire extinguisher shall be provide as required
17Social Infrastructure And Other Public Amenities Including Public Health Services
Retail shops are be provide as part of commercial area to be sold separately by developers.
18Emergency Evacuation Services
Fire tender route and refused areas shall be provided. Stairs shall be provided as approved by fire department
19Other Miscellaneous Work
As per plan
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Mar 2019. It carries a revalidation, valid to 31 Mar 2019.

Sanctioned by Ghaziabad Development Authority · 4,940 sqm of land · an approved plan of 1 block and 141 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
650/GH/Zone-1/13.1411 May 201431 Mar 201931 Mar 201910 Mar 202011 May 2014
valid to 31 Mar 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 10 Mar 2020.

#Granted fromExtended uptoNote
111 Mar 201910 Mar 2020—

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
10524940 SQM—
10524940Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 30 May 2006.

Registry no.DateTypeArea
244830 May 2006self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2448
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2448
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Jan 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Jan 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Jan 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Jan 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Jan 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Jan 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New23 Jan 2019 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old17 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jan 2018 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s MR HOMES
RolePromoter · current
RERA IDUPRERAPRM15461
PANAAUFM0830G
CIN / TANMRTM04182D
Registered addressKJ/12 Kavi Nagar Ghaziabad
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
M R HOMESBankPUNJAB NATIONAL BANKBranchAMBEDKAR MARG GHAZIABADA/C no.IFSCPUNB0370300
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)10 (Under Registration - 1 ) → 10 (Under Registration - 0 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)9 (Under Registration - 0 ) → 10 (Under Registration - 1 )
changed in Estanzo’s record
17 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 7 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about MR Homes Heritage Tower

Is MR Homes Heritage Tower RERA registered?

Yes. MR Homes Heritage Tower is registered with UPRERA under registration number UPRERAPRJ7753, registered on 4 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MR Homes Heritage Tower?

The completion date filed with UPRERA is 10 Mar 2020. No completion certificate is on record yet.

Who is the builder of MR Homes Heritage Tower?

M/s MR HOMES is the promoter entity that filed MR Homes Heritage Tower with UPRERA (promoter RERA ID UPRERAPRM15461). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted MR Homes Heritage Tower more time to complete?

UPRERA's record carries 1 completion extension for MR Homes Heritage Tower, the latest running to 10 Mar 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MR Homes Heritage Tower have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MR Homes Heritage Tower located?

MR Homes Heritage Tower is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in MR Homes Heritage Tower?

The unit plan filed with UPRERA lists SHOP, 2 BHK, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MR Homes Heritage Tower?

The approved unit plan filed with UPRERA runs from 46 to 586 m² of carpet area (about 490 to 6,312 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MR Homes Heritage Tower?

The approved unit plan describes 1 block and 141 units of which 121 are homes and 20 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MR Homes Heritage Tower?

About 116 units per acre: 141 planned units across 1.22 acres (4,940 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗